AIRPORT
ELEVATOR; ESCALATOR; MAINTENANCE; SERVICE; MONTGOMERY KONE INC; INSURANCE
Insurance: With Montgomery Kone Inc. to provide elevator and escalator maintenance and service for the Salt Lake City International Airport; Contract No. 54-1-98-5146. *Cross Reference C 98-771 and C 05-570. C 12-405
ATTORNEY’S OFFICE
RISK MANAGEMENT
WELLS FARGO INSURANCE SERVICES USA; INSURANCE BROKERAGE; CONSULTING SERVICES; AMENDMENT NO 1
Amendment No. 1: Amends original agreement dated April 7, 2011 with Wells Fargo Insurance Services USA for insurance brokerage and consulting services; Contract No. 15-1-10-4716-1. C 11-170
COMMUNITY AND ECONOMIC DEVELOPMENT
ENGINEERING
TRIPLE J CONCRETE; GENERAL FUND ACCESSIBILITY RAMPS; AMENDMENT NO 1; CONCRETE LETTERING; NUMBERING DEPOSIT; STAMPS; STREET NAMES
Amendment No. 1: Amends original agreement dated June 14, 2012 with Triple J Concrete for General Fund Accessibility Ramps – concrete lettering and numbering deposit; Job No. 105043, Contract No. 06-2-12-5914-1. C 12-325
KEN GARNER ENGINEERING; WASHINGTON SQUARE PARK; GROUNDS ELECTRICAL IMPROVEMENTS; PROFESSIONAL SERVICES AGREEMENT; POWER FACILITIES; OUTDOOR POWER CONNECTIONS
Agreement: With Ken Garner Engineering for all related power facilities to support outdoor power connections for Washington Square; Job No. 231702, Contract No. 06-2-12-6010. C 12-406
KEVIN STEPHENS CONSTRUCTION; ON CALL TASK ORDER; GENERAL CONSTRUCTION
Amendment No. 3: Amends original agreement dated January 20, 2012 with Kevin Stephens for on call task order projects for general construction; (Compliance (COMP) - South building remodel – 212 South 600 East), Contract No. 06-2-12-5735-3. C 12-28
PARSONS BRINCKERHOFF QUADE DOUGLAS; BIKEWAY STUDY; PEDESTRIAN NEEDS STUDY; BECK STREET BICYCLE COMMUTER ROUTE DESIGN; STUDY REPORT; EMIGRATION CANYON BICYCLE LANE; GUARDRAIL UPGRADE DESIGN; INSURANCE
Insurance: With Parsons, Brinckerhoff, Quade and Douglas for the Bikeway and Pedestrian Needs Study and Beck Street Bicycle Commuter Route Design and Study Report and Emigration Canyon Bicycle Lane and Guardrail Upgrade Design; Job No. 102090 and 102078, Contract No. 03-2-01-9139. *Cross Reference C 01-184. C 12-407
UTAH DEPARTMENT OF TRANSPORTATION; UDOT; BIKE LANES; EMIGRATION CANYON ROAD; COOPERATIVE AGREEMENT; PRECONSTRUCTION; CONSTRUCTION REIMBURSEMENT; ENHANCEMENT PROGRAM; INSURANCE
Insurance: With Utah Department of Transportation for bike lanes on Emigration Canyon Road; UDOT Project No. STP-LC35(142), Contract No. 06-5-05-1280. *Authorized by Resolution 28 of 2005. *Cross Reference C 05-276. C 12-408
ELECTRIC LIGHTWAVE; LIGHT WAVE; 700 SOUTH; JOINT UTILITY TRENCH; PHASE 3; 3550 WEST; BANGERTER HIGHWAY; PHASE 4; 4400 WEST
Agreement: With Electric Lightwave for the 700 South, Phase 3 – 3550 West to Bangerter Highway; Job No. 102193 and 700 South, Phase 4 – Bangerter Highway to 4400 West, Job No. 102201, Contract No. 06-2-13-6058. C 12-409
HOUSING AND NEIGHBORHOOD DEVELOPMENT
SUMMIT COUNTY UTAH; WASATCH SOLAR CHALLENGE; GRANT AGREEMENT; DEPARTMENT OF ENERGY; EXPAND; TRANSFORM; SOLAR PHOTOVOLTAIC MARKET; DOE
Grant Agreement: With Summit County, Utah for a $424,740 grant from the Department of Energy to expand and transform Utah’s solar photovoltaic market through a collaborative effort with local governments and non-profit organizations; Contract No. 06-5-12-6013. C 12-410
SUMMIT COUNTY UTAH; UTAH SOLAR ENERGY ASSOCIATION; DEPARTMENT OF ENERGY; DOE; EXPAND; TRANSFORM; SOLAR PHOTOVOLTAIC MARKET
Grant Agreement: With Summit County, Utah for a $424,740 grant from the Department of Energy to expand and transform Utah’s solar photovoltaic market through a collaborative effort with local governments and non-profit organizations; Contract No. 06-1-12-6006. C 12-411
ALLY BANK; HOUSING LOAN POOL; AFFORDABLE HOUSING LOANS; AFFORDABLE LOANS
Affordable Housing Loan Agreement: Allows the City to make affordable loans from Ally Bank for housing rehabilitation and affordable housing project loans; Contract No. 06-6-13-6057. C 12-412
PLANNING AND ZONING
UTAH PAPERBOX SUBDIVISION; 800 WEST 900 SOUTH; FINAL PLAT; PAPER BOX
Final Plat: For Utah Paperbox Subdivision at 800 West 900 South.
W 12-3
PROPERTY MANAGEMENT
UTAH ARTS FESTIVAL; 2012 LEASE; CONCESSION; SPECIAL EVENT USE AGREEMENT; WASHINGTON SQUARE; LIBRARY SQUARE; 200 EAST; BLOCK 37
Special Event Use Agreement: With Utah Arts Festival to hold the Utah Arts Festival at Washington Square, Library Square and 200 East on June 21 through June 24, 2012; Contract No. 06-6-12-5965. C 12-413
FINANCE DEPARTMENT
PURCHASING/CONTRACTS
SPACESAVER INTERMOUNTAIN; SHELVING; FILING SYSTEMS; MOBILE; STATIONARY; STATE CONTRACT
State Contract: With Spacesaver Intermountain for mobile and stationary shelving and filing systems; State Contract No. MA1943, Contract No. 01-S-12-6021. C 12-414
INFORMATION MANAGEMENT SERVICES
SALT LAKE CITY PUBLIC LIBRARY BOARD; IT SERVICES; MEMORANDUM OF UNDERSTANDING; MOU; INFORMATION TECHNOLOGY SERVICES
Memorandum of Understanding: With the Salt Lake City Public Library Board for information technology services for the Library; Contract No. 65-1-12-5862. C 12-415
MAYOR’S OFFICE
RICHARDSON GROUP; TRAINING; CONSULTING SERVICES
Agreement: With the Richardson Group for training and consulting services; Contract No. 08-1-12-5979. C 12-416
PUBLIC SERVICES
FACILITIES
MONTGOMERY KONE; ELEVATOR MAINTENANCE; PUBLIC SAFETY BUILDING; PSB; INSURANCE
Insurance: With Montgomery Kone for elevator maintenance; Contract No. 07-1-96-3214. *Cross Reference C 96-571 and C 05-567. C 12-417
bj