COMMUNITY AND ECONOMIC DEVELOPMENT
CHANDLER POINTE SUBDIVISION, DRAINAGE, EASEMENT, QUIT CLAIM DEED, DEED, PERSONAL PRODUCTION
Quit Claim Deed, Drainage Easement, Disclaimer, Disclaimer of Utility Easement: Relocation of an existing drainage easement and disclaiming existing easement located in Chandler Pointe Subdivision. W 90-1
SALT LAKE COUNTY, NEW HOPE MULTICULTURAL CENTER, MULTICULTURAL CENTER, IMPROVEMENTS, FIRE, RENOVATION, COMMUNITY DEVELOPMENT BLOCK GRANT, CDBG, BLOCK GRANT, GRANT, 1102 WEST, 400 NORTH
Interlocal Agreement: Provides for the renovation of the New Hope Multi-Cultural Center which was damaged by fire; Salt Lake City will contribute $30,000 and Salt Lake County will contribute $16,000 from 16th Year CDBG Funds. Authorized by Resolution 111 of 1990. C 90-648 *Recorded November 6, 1990.
SALT LAKE COUNTY, YWCA, YOUNG WOMEN'S CHRISTIAN ASSOCIATION, IMPROVEMENTS, HEATING SYSTEM, LIGHTING SYSTEM, VENTILATION SYSTEM, 322 EAST, 300 SOUTH, COMMUNITY DEVELOPMENT BLOCK GRANT, CDBG, BLOCK GRANT, GRANT
Interlocal Agreement: Provides for renovating the heating, lighting, and ventilation systems at the YWCA located at 322 East 300 South; Salt Lake City will contribute $29,000 and Salt Lake County will contribute $21,000 from 16th Year CDBG funds. Authorized by Resolution 109 of 1990. C 90-646 *Recorded November 6, 1990.
NOVELL, 100 SOUTH, WEST TEMPLE, LIQUOR
Local Consent: Single event to be held November 17, 1990. J 90-67
UTAH SYMPHONY SOCIETY, SALT PALACE, SYMPHONY HALL, 123 WEST, SOUTH TEMPLE, LIQUOR
Local Consent: Single event to be held December 31, 1990. J 90-68 *Recorded November 6, 1990.
FINANCE
UTAH DEPARTMENT OF TRANSPORTATION, INTERNATIONAL CENTER, NORTH TEMPLE, DISCLAIMER, UDOT
Disclaimer: For the abandoned North Temple right-of-way at Salt Lake International Center. W 90-1
SUN MICROSYSTEMS, SUN WORK STATIONS, AIRPORT AUTHORITY, PUBLIC UTILITIES, PUBLIC WORKS, MICROSYSTEMS
Agreement: Provides for maintenance of sun work stations for the Airport Authority, Public Utilities and the Public Works Department; fees pursuant to schedule in agreement, Contract No. 01-1-91-0086. C 90-673
HUMAN RESOURCE AND ADMINISTRATIVE SERVICES
AMERICAN TRAINING ALLIANCE, ROGER KIRKHAM, KIRKHAM, ROGER, CITY SUPERVISORS, SUPERVISORS, PROFESSIONAL ENGINEER, MANAGEMENT CONSULTANT, ENGINEER, CONSULTANT
Agreement: Roger Kirkham will present supervisory training for City supervisors. He will provide a two-day workshop in November 1990 entitled "Getting Results Through People;" the total amount paid to Mr. Kirkham may not exceed $7,500. C 90-674
PUBLIC UTILITIES
SALT LAKE COUNTY, MOBILE RADIO USER, RADIO USER, FEDERAL COMMUNICATIONS COMMISSION, SMR SITE, FARNSWORTH PEAK
Interlocal Agreement: To provide to the County specialized mobile radio service as authorized by the Federal Communications Commission at its SMR site on Farnsworth Peak in Salt Lake County. Authorized by Resolution 110 of 1990. C 90-647 *Recorded November 6, 1990.
MURRAY CITY CORPORATION, WATER, LITTLE COTTONWOOD CONDUIT, 6800 SOUTH, MCGHIE SPRINGS, 3535 EAST
Interlocal Agreement: To facilitate the transportation of Murray City's water in the Salt Lake City's Little Cottonwood Conduit located at approximately 6800 South near the McGhie Springs (approximately 3535 East) to Murray City. Authorized by Resolution 108 of 1990. C 90-684 *Recorded November 6, 1990.
PUBLIC WORKS
WEYHER BROTHERS COMPANY, DOWNTOWN BEAUTIFICATION, STREET LIGHTING, BEAUTIFICATION, LIGHTING, BARRICADING, METER BAGGING, EQUIPMENT, PERSONNEL
Change Order No. 5: Provides for additional barricading, meter bagging, equipment, and personnel; the cost is $15,435, Project No. 38-864-1. C 90-316
WEYHER BROTHERS COMPANY, DOWNTOWN BEAUTIFICATION, STREET LIGHTING, BEAUTIFICATION, LIGHTING, ELECTRICAL METERS, METERS, VAULTS, FLOOD LIGHTS, LIGHTS, 100 SOUTH ISLAND FLAG POLE, FLAG POLE, POLE, UPGRADED CIRCUIT, ISLAND
Change Order No. 6: Provides for the installation of electrical meters outside of the vaults, flood lights for the 100 South Island flag pole, and an upgraded circuit for the 100 South Island; the cost is $27,954.76, Project No. 38-864-1. C 90-316
UTAH DEPARTMENT OF TRANSPORTATION, UDOT, TRAFFIC CONTROL EQUIPMENT, STATE STREET, SOUTH TEMPLE, EQUIPMENT
Agreement: To upgrade traffic control equipment at State Street and South Temple; Project No. MM-3441, Utah Department of Transportation will be responsible for power for the signals operation and Salt Lake City will be responsible for power for the street lights. C 90-645 *Recorded November 6, 1990.