AIRPORT
STAN DELONG; DELONG, STAN; HANGAR; LEASE; AIRPORT
Agreement: Lease of Hangar 18, Row 9 at the Salt Lake City International Airport. C 91-755
DONALD DISON; DISON, DONALD; HANGAR; LEASE; AIRPORT; SHADE HANGAR
Agreement: Lease of Shade Hangar 11, Row 14 at the Salt Lake City International Airport. C 91-756
DAVID PAYNE; PAYNE, DAVID; HANGAR; LEASE; AIRPORT
Agreement: Lease of Hangar 6, Row 8 at the Salt Lake City International Airport. C 91-757
STEVE TEERLINK; TEERLINK, STEVE; HANGAR; LEASE; AIRPORT
Agreement: Lease of Shade Hangar 16, Row 12 at the Salt Lake City International Airport. C 91-758
WESTERN FEDERAL CREDIT UNION; FEDERAL CREDIT UNION; CREDIT UNION; ATM; AUTOMATED TELLER MACHINE; BANKING; LEASEHOLD
Agreement: Provides for the lease of approximately 15 square feet of floor space for the relocation of the dispenser machine. C 91-766
LAYTON CONSTRUCTION; PARKING STRUCTURE; SIGNAGE MODIFICATION; PARKING LOT; GUTTER WORK; INGRESS RAMP; TU2; TERMINAL UNIT 2; TERMINAL UNIT TWO
Change Order No. 5: Provides for labor and material for extra work at TU-1 parking lot and gutter work not originally bid, traffic barrier to control traffic, repair extensive damage at entrance into TU-2 parking lot and painting direction letters on ingress ramp; the additional cost is $17,333.43, Project No. 8(3,7)-12 -01-91, Contract No. 54-2-91-0514-5. *Recorded November 7, 1991. C 89-491
LAYTON CONSTRUCTION; PARKING STRUCTURE; SHIP STAIR ROOF; ROOF
Change Order No. 6: Provides for equipment and labor to install ship stair roof access; the additional costs is $3,611.35, Project No. 8(3,7)-12-01-91, Contract No. 54-2-91-0514-5. *Recorded November 7, 1991. C 89-491
LAYTON CONSTRUCTION; PARKING STRUCTURE; SIGNAGE MODIFICATION; TERMINAL UNIT ONE; TUl; TERMINAL UNIT 1; GUTTER WORK; GROUND TRANSPORTATION DRIVE; TERMINAL DRIVE; SOD; TOP SOIL; SPRINKLING SYSTEM; TU2; TERMINAL UNIT 2; TERMINAL UNIT TWO
Change Order No. 10: Provides for patching of various thickness trenched through Ground Transportation Drive and Terminal Drive, photo cells for new overhead signs, post sleeves for sign posts, placing sod, topsoil and modify sprinkling system along curb and gutter at TU-2 VIP parking lot; the additional costs is $5,087.88, Project No. 8(3,7)-12-01-91, Contract No. 54-2-91-0514-5. *Recorded November 7, 1991. C 89-491
COMMUNITY AND ECONOMIC DEVELOPMENT
DOWNTOWN ALLIANCE; MANAGEMENT OF BUSINESS; IMPROVEMENT DISTRICT; BUSINESS IMPROVEMENT DISTRICT; DOWNTOWN IMPROVEMENT DISTRICT
Agreement: Provides for the management of a downtown business improvement district; fees pursuant to schedule in agreement, Contract No. 06-1-91-0599. C 91-759
DEVONSHIRE 90 PARTNERSHIP; PARTNERSHIP; SUBDIVISION BOND AGREEMENT; BOND; REVEGETATION; DEVONSHIRE SUBDIVISION
Agreement: Provides for revegetation activities for the Devonshire Subdivision; total bond amount is $16,340. *Recorded November 6, 1991. C 91-760
FINANCE
PACIFICORP; UTAH POWER AND LIGHT; UTAH POWER & LIGHT; EASEMENT; ELECTRIC TRANSMISSION; 4800 WEST; 700 NORTH; TRANSMISSION LINE
Easement: Provides for an electric transmission line easement at 4800 West and 700 North for Utah Power and Light; the fee will be $1,078.51. W 91-1
KIER CONSTRUCTION COMPANY; EASEMENT; TEMPORARY CONSTRUCTION EASEMENT; 2665 SOUTH; 2000 EAST
Easement: Provides for a temporary construction easement at 2665 South 2000 East; the fee will be $700. *Recorded October 23, 1991. W 91-1
PACIFICORP; UTAH POWER AND LIGHT; UTAH POWER & LIGHT; EASEMENT; JORDAN AND SALT LAKE CANAL; SALT LAKE CANAL; 6500 SOUTH; 1300 EAST; JORDAN & SALT LAKE CANAL;
Easement: Provides for a power line easement at 6500 South and 1300 East at the Jordan Salt Lake Canal; the fee will be $1,521. W 91-1
FIRE
MULTIJURISDICTIONAL MUTUAL AID; FIRE AND EMERGENCY MEDICAL PROTECTION AGREEMENT; EMERGENCY MEDICAL; BOUNTIFUL CITY; WEST JORDAN CITY; FIRE & EMERGENCY MEDICAL PROTECTION
Amendment No 1: Provides for the addition of the Cities of Bountiful and West Jordan to the Multijurisdictional Mutual Aid agreement for fire and emergency medical protection. C 90-260
HUMAN RESOURCES AND ADMINISTRATIVE SERVICES
PENNOCK PEST CONTROL; RODENT CONTROL; INSECTICIDES; PEST CONTROL
Agreement: Provides for pest control for roaches, spiders, ants, silverfish, rats and mice on an as needed basis; fees pursuant to schedule in agreement, Contract No. 07-1-92-0853. *Recorded November 1, 1991. C 91-761
COTTONWOOD HEIGHTS RECREATION; FITNESS; EMPLOYEE FITNESS; SPA; AEROBIC; RECREATION CENTER
Agreement: Provides for Cottonwood Height Recreation Center to provide health services for Salt Lake City Employees; fees pursuant to schedule in agreement, Contract No. 16-1-0771. *Recorded October 31, 1991. C 91-762
CANNON COPIER; COPY MACHINE; ASSOCIATED BUSINESS PRODUCTS; DATA PROCESSING; IMS; INFORMATION MANAGEMENT SERVICES;
Agreement: Provides for maintenance of the Cannon copier located at the Information Management Services office; the monthly fee will be $241.66, Contract No. 65-1-91-061. *Recorded November 1, 1991. C 91-763
PUBLIC UTILITIES
BELL CANYON CONSTRUCTION COMPANY; WATERMAIN; PVC; STORMDRAIN CROSSING; CULVERT
Change Order No. 1: Provides for raising 16" PVC over the top of the 72" stormdrain culvert; the change increase will be $5,900.50, Project No. 35-4373. C 89-495
BELL CANYON CONSTRUCTION COMPANY; WATERMAIN; AIR RELIEF VALVES; FRONTAGE ROAD; 4550 WEST; 5600 WEST; RELIEF VALVES; VALVES
Change Order No. 2: Provides for the connections to tie three 4" air relief valves into outside vents; the change increase will be $439.30, Project No. 35-4373. C 89-495
BELL CANYON CONSTRUCTION COMPANY; WATERMAIN; STORMDRAIN CROSSING
Change Order No. 3: Provides for the laying of new 16" watermain under eight separate crossings of 24" concrete stormdrains; the change increase will be $8,800, Project No. 35-4373. C 89-495
ANDREW J. DAY; DAY, ANDREW J.; DAY, ANDREW; WATERMAIN EXTENSION; 7660 SOUTH; CABALLERO DRIVE; PHEASANT WOOD ESTATES; RICHARDS DITCH WATERMAIN
Agreement: Provides Watermain Extension No. 27-EX-2-#21 for Pheasant Wood Estates located at 7660 South Caballero Drive. *Recorded November 1, 1991. C 91-764
US DEPARTMENT OF THE INTERIOR; U S DEPARTMENT OF THE INTERIOR; DEPARTMENT OF THE INTERIOR; JORDAN AQUEDUCT REACH 3; CENTRAL UTAH PROJECT; 2100 SOUTH; 3700 WEST; U.S. DEPARTMENT OF THE INTERIOR
Interlocal Agreement: Provides for a 50 year license agreement to allow the City to cross Jordan Aqueduct Reach 3, Central Utah Project for facilities for the station located on 2100 South and 3700 West; Project No. 35-4316-1. Authorized by Resolution 99 of 1991. C 91-709
PUBLIC WORKS
HERM HUGHES AND SONS INC.; HERM HUGHES & SONS INC.; UNLOADING FACILITY; LANDFILL; DELINEATORS; LOADING PLATFORM; DROP OFF PLATFORM; PLATFORM; DROP-OFF PLATFORM; SIGN; SALT LAKE COUNTY WASTE MANAGEMENT; WASTE MANAGEMENT
Change Order No. 2: Provides for an increase in materials and labor to install 10 free standing vertical delineators on the drop-off platform and a solid foundation for a second facility sign to be installed west of the scales off ramp; the total cost of the change order is $1,127; Project No. 40-B-7. C 87-415
UTAH STATE DEPARTMENT OF NATURAL RESOURCES; DEPARTMENT OF NATURAL RESOURCES; NATURAL RESOURCES; WILDLIFE RESOURCE; NON MOTORIZED TRAIL; NON-MOTORIZED TRAIL; MATCHING FUNDS; GRANT; DIVISION OF TRANSPORTATION; HIKING TRAIL; TRAIL; 11TH AVENUE; SHORELINE TRAIL
Agreement: Provides for planning, acquisition, construction, or improvement of non-motorized trails and facilities on 11th Avenue at the Shoreline Trail; the total amount of State funding will be $3,000 and the Transportation Division shall pay $2,250; Contract No. 03-3-92-0872. C 91-765
cm