AIRPORT
KARL GREEN, GREEN, HANGAR
Agreement: Lease Hangar 9, Row 10 at the Salt Lake City International Airport. C 90-276 *Recorded May 11, 1990
ECKHOFF, WATSON & PREATOR, WATER ASSESSMENT
Agreement Amendment #3: Supplementary services specifically relating to the deicing pretreatment system; $45,375. C 89-35
STAKER PAVING, TAXIWAY REHABILITATION, REHABILITATION, K NORTH END, NORTH END, K2, K5, K6, K7, K8, K9
Agreement: Construct Project 1-24-11-89, Taxiway Rehabilitation K North End, K2 and K5-K9; $1,392,571.40. C 90-287 *Recorded May 16, 1990
ATTORNEY
FREED CHRYSLER PLYMOUTH BUILDING, TRAINING, FIRE DEPARTMENT, EPISCOPAL DIOCESE, CHRYSLER PLYMOUTH BUILDING, FREED
Agreement: Allow the fire department to use the old Freed Chrysler Plymouth buildings for training. C 90-288 *Recorded May 16, 1990
COMMUNITY AND ECONOMIC DEVELOPMENT
SALT LAKE ARTS COUNCIL, LIVING TRADITIONS FESTIVAL, FOLK ART, ETHNIC ART, FESTIVAL, WASHINGTON SQUARE, MAY 18, MAY 19, MAY 20, MUSIC, CRAFTS, DANCE, WORKSHOPS, FOOD
Agreement: Living Traditions Festival to be held at Washington Square from May 18-20. C 90-284 *Recorded May 16, 1990
FINANCE DEPARTMENT
QUALITY PRESS, CENTERLINE, NEWSLETTER, AIRPORT AUTHORITY
Agreement: Printing the Centerline bimonthly newsletter for the airport; fees according to schedule in agreement. C 90-277
LEGISLATIVE ACTION/CITY COUNCIL
HOFFINE PRINTING, DISTRICT NEWSLETTER, NEWSLETTER, CITY COUNCIL, COUNCIL
Agreement: Printing services for district newsletters for the Salt Lake City Council; fees according to schedule in agreement, Contract No. 19-1-91-0380. *Agreement signed by Mayor. C 90-278
STAN BONHAM, ROCKY MOUNTAIN TURF, INDUSTRIAL EQUIPMENT, JACOBSEN, CUSHMAN, RYAN, REPLACEMENT PARTS, PARTS, FLEET MANAGEMENT, AIRPORT
Agreement: Jacobsen & Cushman/Ryan replacement parts for the fleet management division and airport authority; fees according to schedule in agreement. C 90-279
KEY BANK, LOAN SERVICING, CAPITAL PLANNING, URBAN DEVELOPMENT ACTION GRANT, UDAG, BANJ INVESTMENT, WARNER AUTO PLAZA, RICK WARNER, AUTO MALL
Agreement: Loan servicing for the capital planning division UDAG loan agreements. C 90-280
DIVERSIFIED SUBURBAN NEWSPAPER, GREENSHEET, ASSUMPTION, PHOENIX CENTER, WEBSTER PUBLISHING, OFFICIAL RUMOR
Agreement, Assumption, Consent, Release: Greensheet to assume full responsibilities for the original agreement to prepare and publish the Official Rumor. C 90-285 *Recorded May 16, 1990
HUMAN RESOURCE/ADMINISTRATIVE SERVICES
NORTH SALT LAKE, ANIMAL CONTROL SERVICES
Interlocal Agreement: Salt Lake City to provide animal control services to North Salt Lake; authorized by Resolution 55 of 1990. C 90-235 *Recorded May 8, 1990
PUBLIC UTILITIES
OEC DIASONICS, DETECTOR CHECK VALVE, CHECK VALVE, 384 NORTH, WRIGHT BROTHERS DRIVE, P110090374
Agreement: Make an 8-inch detector check valve connection for the property located at 384 North Wright Brothers Drive. C 90-282
COMPEQ INTERNATIONAL, DETECTOR CHECK VALVE, CHECK VALVE, 620 NORTH, JOHN GLEN ROAD, P110090375
Agreement: Make a 10-inch detector check valve connection for the property located at 620 North John Glen Road. C 90-283
WATER RECLAMATION PLANT, LABORATORY EXPANSION, RECLAMATION PLANT, EXPANSION
Cover Sheet: Water reclamation plant laboratory expansion, Project No. 49-Q-5-67. C 90-281
SALT LAKE COMMUNITY COLLEGE, STATE OF UTAH, COMMUNITY COLLEGE, UTAH, INSTRUCTOR, SUN SYSTEM COMPUTER, ENGINEERING
Agreement: Salt Lake Community College to provide an instructor who will teach the Sun System Computer to some of the public utilities engineering staff; fees for basic services to be $1,350. C 90-286 *Recorded May 16, 1990
HARPER CONTRACTING, WETLANDS PROJECT
Contract Modification #1: Additional $16,845 to install a new storm drain for the Wetlands Project (Grading) located at the water reclamation plant, Project No. 49-Q-5-52. C 89-478 *Recorded May 16, 1990
COMPEQ INTERNATIONAL, DETECTOR CHECK VALVE, CHECK VALVE, 620 NORTH, JOHN GLEN ROAD, P110090376
Agreement: Make a 10-inch detector check valve connection for the property located at 620 North John Glen Road. C 90-289 *Recorded May 16, 1990
PUBLIC WORKS
WORKMAN CONSTRUCTION, CONCRETE REPLACEMENT
Change Order No. 3: Additional $1,500 to extend various contract construction items to allow for additional work to be done in the Westside target area, Project 4OR1J. C 89-457 *Recorded May 16, 1990
THEIDE CONSTRUCTION, STEINER AQUATICS CENTER
Change Orders #3 and #4: Change Order #3 for an additional $13,589 to add coin operated lockers and correct design deficiencies (provide side-mount diving boards in lieu of end-mount boards, correct beam and column lengths, utilize grout substrata for shower wall and ceilings in lieu of sheet rock, cut wall cap tile); Change Order #4 for an additional $218,537 to add alternates not accepted at the time of award due to lack of funds (office and concession corridor with spa facility, a heat recovery system, and a radiant heat system for the interior pool); Project 3N13-1. C 89-602 *Recorded May 16, 1990