January 8, 1990

 

AIRPORT

 

MCDONNELL DOUGLAS

Memorandum of Understanding: The 1990 improvements - increase administrative space by 30,000 square feet and increase parking facilities by 300 parking stalls; cost not-to-exceed $1,600,000. C 86-141 *Approved January 10, 1990

 

ECKHOFF, WATSON AND PREATOR

Amendment No. 2: Provides for supplementary work in connection with the study and assessment of water being discharged for airport property; fee not-to-exceed $33,672. C 89-35 *Approved January 10, 1990

 

JERRY WOOD, HANGAR

Agreement: Lease Shade Hangar 11, Row 13. C 90-11

 

CHAPMAN AND CUTLER, BOND COUNSEL, COUNSEL, FINANCIAL TEAM

Agreement: Chapman and Cutler to be the Airport Authority's bond counsel for the financing team; fees outlined in the agreement. C 90-12

 

GENERAL SERVICES ADMINISTRATION, GSA, HANGAR, FEDERAL GOVERNMENT, ANIMAL, PLANT, HEALTH INSPECTION SERVICE, U.S. DEPARTMENT OF AGRICULTURE, AGRICULTURE, DEPARTMENT OF AGRICULTURE

Agreement: Lease Hangar 6, Row 7. C 90-13

 

THE COLLABORATIVE

Amendment No. 3: Additional design services associated with the Terminal Unit II expansion - baggage tunnel extension and ground transportation area; total not-to-exceed fee of $44,288.  C 89-220 *Approved January 10, 1990

 

RBG ENGINEERING

Amendment No. 1: Additional $15,000 to pay for soils and materials tests above the estimated number. C 89-319

 

MHT, PARKING STRUCTURE

Amendment No. 5: Necessary design modifications to add the connecting power walkways to the parking structure, not-to-exceed fee of $97,000. C 88-509

 

ROBERT AND COMPANY, LOCKHEED, FUEL FARM EXPANSION, ENGINEERING

Agreement: Professional engineering services to design and oversee the proposed Lockheed Fuel Farm Expansion, Project 6.1-07-10-89, to include an expansion to the existing building, the addition of two 40,000 barrel above ground storage tanks, two 15,000 gallon above ground gasoline storage tanks, and an emergency shut down system to the hydrant system; total fees of $240,238.37. C 90-14

 

AVIS RENT A CAR, TELEPHONE, TELECOMMUNICATIONS EQUIPMENT, PHONE SERVICE, ADMINISTRATIVE

Agreement: Provides for lease and servicing of telephone equipment for administrative phone service; fees pursuant to schedule included in the agreement. C 90-15 *Approved January 10, 1990

 

KEY TRANSPORTATION, TELEPHONE, TELECOMMUNICATIONS EQUIPMENT, PHONE SERVICE, ADMINISTRATIVE

Agreement: Provides for lease and servicing of telephone equipment for administrative phone service; fees pursuant to schedule included in the agreement. C 90-16 *Approved January 10, 1990

 

COMMUNITY AND ECONOMIC DEVELOPMENT

 

UTAH STATE DEMOCRATIC COMMITTEE, DEMOCRATIC COMMITTEE, RED LION, 255 SOUTH, WEST TEMPLE, LIQUOR

Local Consent: Single event permit for February 10, 1990. J 90-2 *Approved January 10, 1990

 

UNIVERSITY OF UTAH, LAW ALUMNI ASSOCIATION, LITTLE AMERICA, 500 SOUTH, MAIN, LIQUOR

Local Consent: Single event permit for February 22, 1990. J 90-3 *Approved January 9, 1990

 

UTAH ARTS FESTIVAL, TRIAD CENTER, 300 WEST, SOUTH TEMPLE, LIQUOR

Local Consent: Single event permit for June 20-24, 1990. J 90-4 *Approved January 9, 1990

 

SALT LAKE ACTING COMPANY, SLAC, MARMALADE HILL CENTER, 168 WEST, 500 NORTH, LIQUOR

Local Consent: Single event permit for February 24, 1990. J 90-5 *Approved January 9, 1990

 

NATIONAL SOCIETY TO PREVENT BLINDNESS, BLINDNESS, RED LION, 255 SOUTH, WEST TEMPLE, LIQUOR, SOCIETY TO PREVENT BLINDNESS

Local Consent: Single event permit for February 27, 1990. J 90-6 *Approved January 9, 1990

 

HOUSING AND URBAN DEVELOPMENT, RICK WARNER AUTO MALL

Report: UDAG grant closeout status report for the Rick Warner Auto Mall project. C 87-198 *Approved January 11, 1990

 

FINANCE DEPARTMENT

 

PACIFICORP, UTAH POWER & LIGHT, UP&L, UTAH POWER AND LIGHT, PROPERTY, EXCHANGE, MILLCREEK CANYON, ANDREW AVENUE, 1500 SOUTH, 300 WEST

Special Warranty Deed: Exchange real property with Pacificorp dba Utah Power and Light - Salt Lake City to get 2.134 acres at the mouth of Millcreek Canyon for 2.194 acres on Andrew Avenue, 1500 South 300 West; basis of value for the exchange is $97,633. W 90-1 *Approved January 9, 1990

 

FIRE DEPARTMENT

 

WEBER STATE COLLEGE, ALLIED HEALTH SCIENCES, EDUCATION, PARAMEDICS, EMERGENCY, MEDICAL TECHNICIANS

Affiliation Agreement: Acknowledges a public obligation to contribute to education for paramedics/emergency medical technicians for the benefit of students and community needs; provides approved emergency medical care, nursing and other professional health care clinical training programs. C 90-17 *Approved January 11, 1990

 

POLICE DEPARTMENT

 

PAIGE HOLTRY; SPECIAL OFFICER; SPECIAL INVESTIGATIONS DIVISION; SID; INVESTIGATIONS

Agreement: Special officer within the Special Investigations Division; $8 per hour for the first six months, $8.50 per hour for the next six months, and $9 per hour after completion of 12 months. C 90-18 *Approved January 10, 1990

 

PUBLIC UTILITIES

 

JOANNE NEU, SALT LAKE CITY BOARD OF EDUCATION; BOE; CITY MAINTAINED STORM DRAIN MAIN; EXTENSION; 1700 NORTH REDWOOD ROAD; SALT LAKE CITY SCHOOL DISTRICT

Agreement: Allows Salt Lake City Board of Education a City maintained storm drain for property at 1700 North Redwood Road; Extension No. 53470753.  C 04-448

 

LOWER MILLCREEK AGREEMENT; MILLCREEK; 2895 SOUTH; 700 EAST; WATER RIGHTS; STOCK; IRRIGATION

Agreement: Assign water rights in the Lower Millcreek Irrigation Company to Salt Lake City; property located at 2895 South 700 East. C 90-19 *Approved January 11, 1990

 

WENDALL HAND

Amendment No. 3: Provide consultant services for the City's water distribution systems, pressure water supply and water works, and related functions for a one year period ending January 1, 1991. C 88-63

 

PAULSEN CONSTRUCTION; ADDITION; PUBLIC UTILITIES BUILDING; 1530 SOUTH; WEST TEMPLE; BUILDING

Agreement: Addition to the City's public utilities building located at 1530 South West Temple; Project H-B, $585,500. C 89-385

 

PUBLIC WORKS

 

EACON P.C., GAYLORD SMITH, PROJECT MANAGER, PUBLIC SAFETY BUILDING, FIRE STATION #4, STEINER AQUATIC CENTER, FIRE STATION #10, EACON PC

Amendment No. 13: Gaylord Smith to continue to serve as a project manager for various city projects through December 31, 1990. He will prepare a parking study for the public safety facility and organize all construction documents for Fire Station No. 4; not-to-exceed fee for this work is $14,000. C 90-20 *Approved January 10, 1990

 

MCNEIL CONSTRUCTION

Change Order No. 2: Award Bid Schedule C - additive alternate bid for the Jeremy Street Storm Drain to complete the drainage system and correct drainage problems on South Temple and Jeremy Street; $12,570. C 88-609 *Approved January 11, 1990

 

WESLEY GREEN ROOFING

Change Order No. 1: Add the following to Project 19-Y-38-7 (Roofing Repair for Salt Lake City Parks and Recreation Office and Shop Building) - repair and replace roofs on structures in Liberty Park and Riverside Park; $3,480. C 89-601 *Approved January 10, 1990

 

LOWELL CONSTRUCTION

Change Order No. 7: West Temple Curb & Gutter Extension, Project 38-830-1 - cover work items after Post Office Place was added to the project, add catch basins for Post Office Place and West Temple, add handicap pedestrian ramp on 300 South between West Temple and 200 West; $14,500. C 89-208 *Approved January 11, 1990

 

MCNEIL CONSTRUCTION

Change Order No. 6: 900 West Street Improvements, Phase III, Project 38-757-3 - cost of the overrun for items on the original bid schedule, increase or decrease the contract line item quantities for budgeting purposes; $28,361.10. C 88-137 *Approved January 11, 1990