DEPARTMENT OF AIRPORTS
TRANSPORTATION SECURITY ADMINISTRATION; TSA; LAW ENFORCEMENT PERSONNEL; REIMBURSEMENT; HOMELAND SECURITY; LAW ENFORCEMENT OFFICERS; SCREENING CHECKPOINTS
Agreement: With the Transportation Security Administration for reimbursement of law enforcement personnel; Contract No. HSTS01-04-A-LEF085. C 04-56
AMERICA WEST AIRLINES; AMENDED; RESTATED; AIRPORT USE; AIRFIELD FACILITIES; LEASE OF SPACE; LEASED SPACE; AUA
Amended and Restated Airport Use Agreement: With America West Airlines for lease of space at the Salt Lake City International Airport. C 04-57
GRANITE CONSTRUCTION COMPANY; CONCOURSE A; APRON RECONSTRUCTION; PHASE II
Agreement: With Granite Construction Company for Concourse A apron reconstruction, Phase 2; Project No. 5421110689, Contract No. 54-2-04-0354. C 04-58
CHEMTECH FORD; ANALYTICAL LABORATORY SERVICES; ANALYTICAL SERVICES
Agreement: With Chemtech-Ford for analytical laboratory services; Contract No. 54-1-04-0472. C 04-59
TRANSPORTATION SECURITY ADMINISTRATION; TSA; LAW ENFORCEMENT PERSONNEL; REIMBURSEMENT AGREEMENT; SUPPLEMENT; LAW ENFORCEMENT OFFICERS; SCREENING CHECKPOINTS
Agreement Supplement: With the Transportation Security Administration for reimbursement of law enforcement personnel. C 04-56
ALLIANCE ATLANTIS PRODUCTIONS ALBERTA; FILM; RELEASE; PRODUCTION; AIRPORT LOCATION AGREEMENT
Airport Location Agreement and Release: Allows Alliance Atlantis Productions Alberta to film at the Salt Lake City International Airport. C 04-60
AIRPORT GROUP INTERNATIONAL; AGI; PASSENGER LOADING BRIDGES; ASSESSMENT SERVICES; PROFESSIONAL SERVICES AGREEMENT
Agreement: Airport Group International will assess passenger loading bridges to be purchased by the City; Contract No. 54-1-04-0623.
C 04-61
STAKER PAVING AND CONSTRUCTION MANAGEMENT; EAST APRON REHABILITATION; REHAB; PHASE III
Agreement: With Staker Paving and Construction Management for the East Apron rehabilitation, Phase III; Project No. 5450500691, Contract No. 54-2-04-0391. C 04-62
COMMUNITY DEVELOPMENT
PROPERTY MANAGEMENT
WALTER ZWIERZYCKI; JUDITH ZWIERZYCKI; REVOCABLE PERMIT; 622 NORTH I STREET; CONSTRUCT; REPAIR; MAINTAIN; REMOVAL; GRASS; XERISCAPING; ROCKS; PLANTS
Revocable Permit: Allows Walter and Judith Zwierzycki to remove existing grass and replace it with xeriscaping at 622 North I Street; Contract No. 01-6-04-0462. C 04-63
LEANNE BRANDT; REVOCABLE PERMIT; 661 10TH AVENUE; TENTH AVENUE; CONSTRUCT; REPAIR; MAINTAIN; RETAINING WALL; DRIVEWAY APPROACH
Revocable Permit: Allows Leanne Brandt to construct, repair and maintain a retaining wall as part of the driveway approach located at 661 10th Avenue; Contract No. 01-1-04-0464. C 04-64
LINDA MILLER; REVOCABLE PERMIT; 726 SOUTH GLENDALE STREET; RECONSTRUCT; MAINTAIN; RETAINING WALL; LANDSCAPING ENHANCEMENTS; LANDSCAPE; PUBLIC RIGHT OF WAY
Revocable Permit: Allows Linda Miller to reconstruct and maintain an existing retaining wall and to add landscaping enhancements at 726 South Glendale Street; Contract No. 01-6-04-0466. C 04-65
NANCY CANTOR; MICHAEL MCDONALD; REVOCABLE PERMIT; 525 EAST 13TH AVENUE; THIRTEENTH AVENUE; LANDSCAPING IMPROVEMENTS; LANDSCAPE
Revocable Permit: Allows Nancy Cantor and Michael McDonald to install landscaping improvements at 525 East 13th Avenue; Contract No. 01-6-04-0467. C 04-66
ALLAN SMART; REVOCABLE PERMIT; 905 TERRACE HILLS DRIVE; CONSTRUCT; MAINTAIN; FENCE
Revocable Permit: Allows Allan Smart to construct and maintain a fence at 905 Terrace Hills Drive; Contract No. 01-1-04-0424.
C 04-67
TRANSPORTATION DIVISION
DR CRAYTON WALKER; ADOPT A CROSSWALK; MCCLELLAND STREET; 100 SOUTH; ORANGE FLAGS; CROSSWALK SAFETY PROGRAM; MAINTENANCE; SPONSOR; PEDESTRIAN SAFETY
Agreement: Dr. Crayton Walker will sponsor the Adopt-A-Crosswalk program by supplying six flags per receptacle at McClelland Street and 100 South; Contract No. 03-1-04-0517. C 04-68
STEVEN DAME; ADOPT A CROSSWALK; APRICOT STREET; COLUMBUS STREET; ORANGE FLAGS; CROSSWALK SAFETY PROGRAM; MAINTENANCE; SPONSOR; PEDESTRIAN SAFETY
Agreement: Steven Dame will sponsor the Adopt-A-Crosswalk program by supplying six flags per receptacle at Apricot and Columbus Streets; Contract No. 03-1-04-0518. C 04-69
PUBLIC UTILITIES
PLANNED AND ENGINEERED CONSTRUCTION; PEC; SANITARY SEWER MAIN REHABILITATIONS; REHAB; 300 SOUTH; 900 EAST; 1060 EAST; SUNNYSIDE AVENUE; 1950 EAST; 1992 EAST; 1510 EAST; 1600 EAST; 1800 EAST; 1300 SOUTH; 1400 SOUTH; 1100 EAST; 700 SOUTH; 800 SOUTH; DIESTEL ROAD; 900 SOUTH; GREENWOOD TERRACE; SOUTH TEMPLE; 400 EAST; 450 EAST; KING STREET; 2222 SOUTH; 2250 SOUTH; MARKEA COURT; 656 EAST; 700 EAST; ELIZABETH STREET; 200 SOUTH; 1200 EAST; 400 SOUTH; 1000 EAST; EDITH AVENUE; 500 EAST; HAMPTON AVENUE; 300 EAST; 345 EAST; 2100 SOUTH; 2600 EAST; LAKELINE DRIVE; SCENIC DRIVE; 1950 SOUTH; 2182 SOUTH; FOOTHILL DRIVE; BRADSHAW CIRCLE; GLEN OAKS DRIVE; 2849 EAST
Agreement: With Planned and Engineered Construction for sanitary sewer main rehabilitations located within City limits; Project Nos. 525001854, 525001857, 626001858, 525001859, 525001882, 525001923, 525001929, 525001931, 525001937, 626001938, 525001940, 6525001941, 525001945, 525001957, 525001978, 525001993, 525001997 and 525002085, Contract No. 51-2-04-0503. C 04-70
EAGLE ENVIRONMENTAL; CITY CREEK WATER TREATMENT PLANT; CCWTP; ASBESTOS ABATEMENT; LEAD ABATEMENT
Agreement: With Eagle Environmental for the City Creek Water Treatment Facility asbestos and lead abatement; Project No. 512276, Contract No. 51-2-04-0488. C 04-71
bj