DEPARTMENT OF AIRPORTS
BRICK LORING; SHADE HANGAR LEASE; SHADE HANGAR 19 ROW 12; SALT LAKE CITY INTERNATIONAL AIRPORT
Agreement: Brick Loring will lease Shade Hangar 19, Row 12 at the Salt Lake City International Airport. C 99-1100
COMMUNITY AND ECONOMIC DEVELOPMENT
CAPITAL PLANNING
FRIENDS OF TRACY AVIARY; LOAN; OPERATING EXPENSES; $250,000, REVOLVING LOAN FUND; ECONOMIC DEVELOPMENT; CONTRACT NO 72-5-00-7903
Agreement: The City will loan $250,000 from its Economic Development Revolving Loan Fund to Friends of Tracy Aviary; Contract No. 72-5-00-7903. *Authorized by Resolution 88 of 1999. Cross reference R 99-6. C 99-1099 *Recorded November 29, 1999.
LONE ART STUDIO; MAIN STREET ART; TREE GRATES; MANHOLE COVERS; MAN HOLE COVERS; ARTIST COMMISSIONED WORK; CLAY FURCHES; PERCENT FOR ART FUNDING; SOUTH TEMPLE; 400 SOUTH; MAIN STREET BEAUTIFICATION PROJECT; CONTRACT NO 06-2-00-7845
Agreement: With Clay Furches d.b.a. Lone Art Studio to design, fabricate and install a series of tree grates and manhole covers to be placed in the sidewalk on Main Street between South Temple and 400 South; the cost is $300,000, Contract No. 06-2-00-7845. C 99-1101 *Recorded November 29, 1999.
ENGINEERING
A J C ARCHITECTURE; AJC ARCHITECTURE; RENOVATION; EXISTING FIRE TRAINING BURN BUILDING; FIRE TRAINING FACILITY; JOB NO 651605; CONTRACT NO 03-2-98-4871-2; PROJECT NO 651605
Amendment No. 2: With AJC Architecture to prepare contract documents and provide construction administration for renovation of the existing fire training burn building; the cost is $92,300, Job No. 651605, Project No. 651605, Contract No. 03-2-98-4871-2. C 97-606 *Recorded December 1, 1999.
EAGLE ENVIRONMENTAL; CHASE HOUSE; LEAD PAINT ABATEMENT; LEAD PAINT REMOVAL; DISPOSAL; JOB NO 220109; PROJECT NO 220109; CONTRACT NO 03-2-00-7916
Agreement: With Eagle Environmental for the Chase House lead paint removal and disposal; the cost is $54,527, Job No. 220109, Project No. 220109, Contract No. 03-2-00-7916. C 99-1102
PUBLIC SERVICES
PARKS
GALLIVAN UTAH CENTER OWNERS ASSOCIATION; MAINTENANCE; UTAH GALLIVAN CENTER; GUCOA; CONTRACT NO 03-1-99-7452
Agreement: With the Gallivan Utah Center Owners Association for maintenance of the Utah Gallivan Center; fees pursuant to schedule in agreement, Contract No. 03-1-99-7452. C 99-1103
STREETS/WASTE MANAGEMENT DIVISION
CONCRETE PRODUCTS COMPANY; ASPHALT BITUMINOUS PAVING MATERIAL; GRANITE CONSTRUCTION COMPANY OF CALIFORNIA; CONTRACT NO 03-1-99-7467
Agreement: Granite Construction Company of California d.b.a. Concrete Products Company will provide asphalt bituminous paving material; fees pursuant to schedule in agreement, Contract No. 03-1-99-7467. C 99-1104
PUBLIC UTILITIES
EWP ENGINEERING; ORGANIC WASTE LOADING STUDY; WASTEWATER TREATMENT PLANT; WASTE WATER TREATMENT PLANT; 1365 WEST 2300 NORTH; PROJECT NO 524905180; CONTRACT NO 51-1-00-7822
Agreement: EWP Engineering will provide an organic waste loading study for the City's Wastewater Treatment Plant located at 1365 West 2300 North; the cost is $52,340, Project No. 524905180, Contract No. 51-1-00-7822. C 99-1105
GRIFFITH MICRO SCIENCE; DETECTOR CHECK CONNECTION; DETECTOR CONNECTION; 5725 WEST HAROLD GATTY ROAD; PETITION NO 1100-1061-99
Agreement: With Griffith Micro Science for a detector check connection for property located at approximately 5725 West Harold Gatty Road; Petition No. 1100-1061-99. C 99-1106
MILLPOINTE OFFICE; AUTOMATIC SPRINKLER CONNECTION; 3115 LION LANE; PETITION NO 1100-1058-99
Agreement: With Millpointe Office for an automatic sprinkler connection for property located at 3115 Lion Lane; Petition No. 1100-1058-99. C 99-1107
ASHTON CONSTRUCTION AND DEVELOPMENT; SPECIAL COUNTY PRIVATE MAIN; 3500 SOUTH 1200 EAST
Agreement: With Ashton Construction and Development for a special County private main for property located at 3500 South 1200 East. C 99-1108
CHRISTOPHER HESLER; DAWN HESLER; UTILITY PERMIT; DRIVEWAY; FENCING; LANDSCAPING; 2861 EAST 2850 SOUTH; REVOCABLE PERMIT
Revocable Permit: With Chistopher and Dawn Hesler for a utility permit for driveway, fencing and landscaping at 2861 East 2850 South. C 99-1109
KELLY OLDROYD; LOWER MILLCREEK IRRIGATION COMPANY; REPAIR; LEAK; MAINTAIN; SERVICE LINE; WATER NEEDS; 1232 RIDGEDALE LANE
Agreement: With Kelly Oldroyd and the Lower Millcreek Irrigation Company for a waterline repair at 1232 Ridgedale Lane. C 99-1110
KENNETH LOFGREN; LOWER MILLCREEK IRRIGATION COMPANY; REPAIR; LEAK; MAINTAIN; SERVICE LINE; WATER NEEDS; 1189 RIDGEDALE LANE
Agreement: With Kenneth Lofgren and the Lower Millcreek Irrigation Company for a waterline repair at 1189 Ridgedale Lane. C 99-1111
DANIEL MACKINTOSH; JULIE MACKINTOSH; BROWN AND SANFORD IRRIGATION COMPANY; WATER CREDITS; WATER RIGHTS; WATER CREDIT; WATER RIGHT; 1690 EAST FORT UNION BOULEVARD; RESCIND OF AGREEMENT
Agreement: With Brown and Sanford Irrigation Company and Daniel and Julie Mackintosh for two water credits for property located at 1690 East Fort Union Boulevard. C 99-1112
REDBIRCH; RED BIRCH COVE; RED BIRCH ESTATES; REDBIRCH COVE; LICENSE; PIPELINE; PIPE LINE; LICENSE FOR PIPELINE; 7870 SOUTH 1940 EAST
License for Pipeline Agreement: With Redbirch for property located at approximately 7870 South 1940 East. C 99-1113
REDBIRCH; RED BIRCH COVE; RED BIRCH ESTATES; REDBIRCH COVE; 7870 SOUTH 1940 EAST; SIESTA DRIVE; SPECIAL CONTRACT NO 1061; EXTENSION NO 513301659; CULINARY WATER; WATERMAIN; WATER MAIN
Special County Agreement: With Redbirch for watermains for Red Birch Estates located at approximately 7870 South (Redbirch Cove) and 1940 East (Siesta Drive); Contract No. 1061, Extension No. 513301659. C 99-1114
SWIFT TRANSPORTATION FACILITY; DETECTOR CHECK CONNECTION; DETECTOR CONNECTION; 3760 WEST 800 SOUTH; PETITION NO 1100-1060-99
Agreement: With Swift Transportation Facility for a detector check connection for property located at approximately 3760 West 800 South; Petition No. 1100-1060-99. C 99-1115
bj