AIRPORT
ROBERT SLACK; SLACK, ROBERT; LEASE; AIRPORT; SHADE HANGAR; HANGAR
Agreement: Lease of Shade Hangar 6, Row 13 at the Salt Lake City International Airport. C 92-213
JOHN NEWMAN; NEWMAN, JOHN; CIVIL AIR PATROL; AIR PATROL; LEASE; AIRPORT; SHADE HANGAR; HANGAR
Agreement: Lease of Shade Hangar 2, Row 11 at the Salt Lake City International Airport. *Recorded April 22, 1992. C 92-214
AMERICA WEST AIRLINES; AIRLINES; PAGING EQUIPMENT; PBX; TRUNK LINES; TRUNKS
Agreement: Paging equipment will be furnished for America West Airlines for five years; fees pursuant to schedule in agreement.
C 92-215
BEEHIVE PARKING, INC.; CONCESSIONAIRE; PARKING; SHUTTLE BUS; BUS; GROUND TRANSPORTATION; TRANSPORTATION; PARKING RATES
Amendment No. 3: Modifies Beehive Parking Inc. parking rates, shuttle bus service and the ground transportation fees. *Recorded April 22, 1992. C 91-294
RALPH BURKE ASSOCIATES; CONSULTING SERVICES; CONCESSIONAIRE; PARKING; PARKING RATES
Agreement: Ralph Burke Associates will provide consulting services relating to the solicitation and negotiation of public auto parking concession; fees pursuant to schedule in agreement, Contract No. 54-1-92-1060. *Recorded April 22, 1992. C 92-216
PARAMETRIX INC.; CONSULTING SERVICES; CONSTRUCTION COST ESTIMATING; COST ESTIMATING
Agreement: Parametrix Inc. will provide consulting services relating to construction cost estimating; not-to-exceed fee is $25,000, Contract No. 54-2-92-1011. *Recorded April 22, 1992.
C 92-217
CONCOURSE C; CONCOURSE D; SMOKING ROOMS; FOX, DANIELS AND BENNETT; FOX, DANIELS & BENNETT; RESTROOMS; PARKING STRUCTURE
Agreement: Fox, Daniels and Bennett will construct smoking rooms for concourses C and D and restrooms in the second level of the parking structure; total fees will be $125,300, Project No. 2.2-22-1-92, Contract No. 54-2-92-1071. *Recorded April 22, 1992.
C 92-218
CARGO APRON EXPANSION; UTILITY RELOCATION; J D MCNEIL CONSTRUCTION; J. D. MCNEIL CONSTRUCTION; APRON
Agreement: J. D. McNeil Construction will furnish all labor, materials and equipment for the Cargo Apron Expansion and Utility Relocation; total fees will be $1,463,467.33, Project No. 6.1-16.12-91, Contract No. 54-2-92-1015. *Recorded April 22, 1992. C 92-219
COMMUNITY AND ECONOMIC DEVELOPMENT
ARTHRITIS FOUNDATION; LIQUOR; FORT DOUGLAS COUNTRY CLUB; NO. 2 MEDICAL DRIVE; MEDICAL DRIVE
Local Consent: Arthritis Foundation of Utah will hold a single event on June 27, 1992. J 92-9
BEEHIVE CHEFS ASSOCIATION; LIQUOR; UTAH STATE FAIRPARK; HOME ARTS BUILDING; 155 NORTH; 1000 WEST
Local Consent: Beehive Chefs Association will hold a single event on May 30, 1992. J 92-10
NATIONAL ASSOCIATION OF AREA AGENCIES ON AGING; AGING; LIQUOR; SALT PALACE; 100 SOUTH; WEST TEMPLE; AGENCIES ON AGING
Local Consent: National Association of Area Agencies on Aging will hold an event on July 19, 20, and 21, 1992. J 92-11
ENSIGN DOWNS; NORTH COVE ESTATES; PLAT C; PLAT D; PLAT E
Plat: Final approved Plats "C" "D" and "B" for North Cove Estates Subdivision. *Recorded April 15, 1992. C 92-209
ENSIGN DOWNS; CAPITOL HILLS; PLAT A
Plat: Final approved Plat "A" for Capitol Hills Subdivision. *Recorded April 15, 1992. C 92-210
ENSIGN DOWNS; CAPITOL HILLS; PLAT B
Plat: Final approved Plat "B" for Capitol Hills Subdivision. *Recorded April 15, 1992. C 92-212
ENSIGN DOWNS; CAPITOL HILLS; PLAT C
Plat: Final approved Plat "C" for Capitol Hills Subdivision. *Recorded April 15, 1992. C 92-211
MANAGEMENT SERVICES
WARRANTY DEED; DEED; 900 SOUTH; M.V. LONG DEVELOPMENT; LONG DEVELOPMENT
Special Warranty Deed: Conveys property at 900 South from M. V. Long Development to Salt Lake City for future right-of-way. W 92-1
RELEASE OF LIEN; F. C. STANGLE; CAMBRIDGE INDUSTRIAL
Release of Lien: Conveys the Cambridge Industrial Park property to F. C. Stangle. W 92-1
PRI; PROPERTY RESERVE, INC.; QUIT CLAIM DEED; DEED; 1500 NORTH; 1950 WEST; LAND; OWNERSHIP GAP; WESTPOINTE SUBDIVISION
Quit Claim Deed: Disclaimer, by Quit Claim Deed, of the City's interest in a strip of land along the northeast boundary of property traded to PRI in exchange for a park site in the Westpointe Subdivision. W 92-1
LEASE RENEWAL; TRANSPORTATION DIVISION; 333 SOUTH; 200 EAST; BETTILYON REALTY
Agreement: Renews the lease at 333 South 200 East for the Transportation Division with Bettilyon Realty for five years; rental payment is $6,472 per month, Contract No. 01-9-92-1072. *Recorded April 23, 1992. C 92-220
EXECUTIVE RETIREMENT; JOHN GUST; GUST, JOHN; WITHDRAWAL OF ACCOUNT; RETIREMENT PLAN; WILLIAM M. MERCER, INCORPORATED; MEIDINGER-HANSEN, INCORPORATED
Amendment: Modifies the signature page to permit withdrawal of account balance in the Salt Lake City Executive Retirement Plan for John Gust. C 88-618
PARKS
WESTERN FOOD SERVICES; CONCESSIONAIRE; BONNEVILLE GOLF COURSE; CLUBHOUSE
Agreement: Western Food Service and Restaurant Concession will operate a food and restaurant concession business at Bonneville Golf Course; fees pursuant to schedule in agreement, Contract No. 59-6-92-0912. *Recorded April 22, 1992. C 92-221
POLICE
FORENSIC INVESTIGATION; STEVE BARTLETT; BARTLETT, STEVE; POLYGRAPH EXAMS
Agreement: Steve Bartlett will provide polygraph examination services; fees pursuant to schedule in agreement, Contract No. 02-1-92-0952. *Recorded April 22, 1992. C 92-222
PUBLIC UTILITIES
MINUTES; PUBLIC UTILITIES ADVISORY COMMITTEE; PUBLIC UTILITIES; ADVISORY COMMITTEE
Minutes: Public Utilities Advisory Committee minutes for March 19, 1992. M 92-4
ORIN LUND; LUND, ORIN; BEVERLY LUND; LUND, BEVERLY; PRIVATE WATERMAIN; WATERMAIN; ROYAL LANE NO. 2 SUBDIVISION; 8100 SOUTH; 2450 EAST; ROYAL LANE
Agreement: Provides Orin and Beverly Lund a private watermain for the property located at 8100 South 2450 East; Project No. 33-C-1453. *Recorded April 17, 1992. C 92-223
CH2MHILL; CH2M HILL CENTRAL, INC.; CH2MHILL CENTRAL, INC.; CH2M HILL; CULINARY WATER SYSTEM; BIG COTTONWOOD; TANNER DITCH
Agreement: CH2M Hill Central, Inc. will evaluate the culinary water system's interaction with the Big Cottonwood Tanner Ditch water system; fees pursuant to schedule in agreement, Project No. 26-KR-3, Contract No. 51-2-92-1063. C 92-224
EVALUATION; SPIRO TUNNEL; ONTARIO TUNNEL; TUNNEL; WATER FLOW; HANSEN ALLEN AND LUCE INC.
Agreement: Hansen Allen and Luce, Inc. will evaluate the Spiro and Ontario tunnels water flow; fees pursuant to schedule in agreement, Contract No. 51-2-92-1062. C 92-225
SILVERHAWK CORPORATION; WATERMAIN; SILVERHAWK SUBDIVISION; 3000 EAST; 5750 SOUTH; ROBERT HOLMS; HOLMS, ROBERT
Agreement: Provides for a Watermain Extension at approximately 3000 East and 5750 South for the Silverhawk Subdivision; Project No. 33-C-1438. *Recorded April 17, 1992. C 92-226
WATTS 89 INC.; SOUTHWICK; WALKER LANE SUBDIVISION; 2330 EAST; WALKER LANE
Agreement: Provides for a Watermain Extension at approximately 2330 East Walker Lane for the Walker Lane Subdivision; Project No. 26-KR-2-40. *Recorded April 23, 1992. C 92-227
U. S. BUREAU OF MINES; BUREAU OF MINES; US BUREAU OF MINES; U S BUREAU OF MINES; DETECTOR CHECK VALVE; CHECK VALVE; 6 INCH DETECTOR CHECK VALVE; ARAPEEN DRIVE; 729 ARAPEEN DRIVE; VALVE
Agreement: The U.S. Bureau of Mines will make a 6-inch detector check valve connection on the property located at 729 Arapeen Drive; Project No. 1100-465-92. *Recorded April 23, 1992. C 92-228
DIAMOND PARKING; INDUSTRIAL PARK; 8-INCH DETECTOR CHECK VALVE; CHECK VALVE; VALVE; 50 SOUTH; REDWOOD ROAD
Agreement: Diamond Parking will make an 8-inch detector check valve connection on property at 50 South Redwood Road; Project No. 1100-466-92. *Recorded April 23, 1992. C 92-229
PUBLIC WORKS
ALCOHOL TREATMENT CENTER; J L HARDY CONSTRUCTION; J. L. HARDY CONSTRUCTION; JL Hardy
Agreement: J. L. Hardy will repair structural damage to an historical building for alcohol treatment and construct a new interior shear wall and provide minor exterior repair work; cost is $34,775, Project No. 3-N-9, Contract No. 03-2-92-1035. C 92-230
cm