On August 9, 1983, an agreement was approved with John Archuleta to be hired on the neighborhood cleanup program for the 1983 season. The position is being filled due to the resignation of a previous employee and is a temporary position. C 83-1
On June 29, 1983, service agreements were approved with Thomas Gilbert Hamby, Jr., Ferrell Dustin Bills and Leo Max Pacheco to be hired for the neighborhood cleanup program for the 1983 season.
C 83-1
On May 18, 1983, a service agreement was approved for Elmer Vern Peck, Jr. to be hired as a vehicle operator on the Neighborhood Cleanup program for the 1983 season. C 83-1
On March 16, 1983, service agreements were approved hiring the following vehicle operators on the Neighborhood Cleanup Program for the 1983 season: Nancy Christensen, Billy Lujan, Kevin Burt, Gordon Miller, Manuel Domingo Jr., Anthony Domingo, Sandra Ralston and Mark Padilla. C 83-1
On February 2, 1983, a service agreement was approved hiring Barbara Pacer as a new employee in the Department of Public Planning and Development/Parks/Cemetery/Golf and Recreation. C 83-2
On January 18, 1983, service agreements were approved hiring Chris N. Loulias and Stephanie Jan Martin as new employees in the Department of Public Planning and Development/Parks/Cemetery/Golf and Recreation. C 83-2
On July 20, 1983, an agreement was approved with Delbert T. and Claudia T. Goates regarding the conveyance of the city’s interest in a portion of Alta Street closed by Bill No. 54 of 1982. According to the terms of this agreement, the city will receive a small parcel of property needed to extend a pedestrian walkway over the northwest corner of their lot. C 83-3
On March 1, 1983, an agreement with the Rousing Authority of Salt Lake City was approved in which they request permission to make a 6-inch automatic sprinkler connection for the Elderly Housing Unit to be located at 475 East 900 South. C 83-4
TELECOMMUNICATIONS INTERNATIONAL, INC., MOUNTAIN BELL, CABLE, CONDUIT, TELEPHONE
Amendment #2: with Telecommunications International to assist in negotiations of terms for purchase of cable and conduit from Mountain Bell. C 83-5
On April 23, 1985, an amendment was approved with Telecommunications International, Inc. which modifies the scope of work to be performed by the consultant and reduces the fees paid by the City by approximately $10,800.00. C 83-5
On March 12, 1985, Amendment No. 1 was approved in the amount of $75,165.00 with Telecommunications International, Inc. This will allow Telecommunications International to perform a study to assess the future needs for telecommunication services and recommend how to provide for these needs at the Salt Lake City International Airport. C 83-5
On June 21, 1983, an interlocal agreement was approved with Salt Lake County in which they will join with the city in a telephone survey conducted by Telecommunications International, Inc. (TII). The city entered into a contract with TII a few months ago but because the city and the county jointly share the existing Centrex telephone communications system it is in our best interest to share in this survey. C 83-5
On January 11, 1983, an agreement was approved with Telecommunication International, Inc. to provide a comprehensive survey and evaluation of the city’s existing telecommunications system and develop a Request for Proposal for a replacement if necessary. C 83-5
On January 11, 1983, the contract with Intermountain Video Systems was approved for the Access Control System for the Frontier Reservation Center, Project No. 19-A-117-21-1 at the Salt Lake International Airport. Total cost of this project will be $4,110. The Airport Authority is authorized to issue a Notice to Proceed to the contractor. C 83-6
On February 8, 1983, a Revocable Permit was approved enabling Salt Lake County to install a Telemetered Precipitation and Wind Measuring Device at the city’s Big Cottonwood Water Treatment Plant. C 83-7
On November 8, 1983, an amendment to the memorandum of understanding between the city and Local 1004 of the American Federation of State, County and Municipal Employees AFSCME was approved amending Article XXIII (pension plan contributions). C 83-8
On January 4, 1983, the contract with Young Electric Sign Company was approved for Miscellaneous Airport Signs, Project No. 19-A-111-5 at the Salt Lake International Airport for a total of $9,025. The Airport Authority is authorized to issue a Notice to Proceed to the contractor. C 83-9
On January 4, 1983, an agreement was approved with Mountain States Telephone and Telegraph Company for a Variable Term Payment Plan which represents a month to month agreement to install and maintain telephone equipment for the Department of Public Works at a monthly rate of $899. C 83-10
On January 4, 1983, it was approved to lease Shade Hangar 20, Row 12 at the Salt Lake International Airport to De A. Johnson, Individually, commencing November 1, 1982. C 83-11
On January 4, 1983, it was approved to lease Shade Hangar 17, Row 12 at the Salt Lake International Airport to Johan Witkamp, Individually, and Tates, Inc. commencing October 1, 1982. C 83-12
On March 1, 1983, a letter of agreement was approved with TRA to provide additional consulting services in connection with the programming and conceptual design of the Parking Structure, Project 19-4-124-3 at the Salt Lake International Airport. During the conceptual design of the parking structure, the appearance of the structure in conjunction with the terminals has been of concern. Therefore, TRA will prepare a perspective sketch depicting the view of the parking garage and terminals as seen by an automobile driver from a view point on the terminal approach drive. This will aid in the presentation process and will assist in finalizing the conceptual design of the parking structure itself. The fee for these additional services will be $1,750. C 83-13
On February 8, 1983, an agreement was approved between the city, MRT (Montmorency, Hayes & Talbot) and TRA (The Richardson Associates) pertaining to design services for the proposed parking structure, Project No. 19-A-124-3 at the Salt Lake International Airport. This agreement deletes the schematic design portion of the architectural services from the contract between MHT and the city. In consideration of this reduced scope of work, the design fee is reduced by $24,000. MHT is also released from a requirement to utilize TRA as an associate architect. TRA will accomplish the schematic design effort as part of the Design Directive they are preparing under contract with the city. C 83-13
On January 4, 1983, an agreement for additional services was approved with TRA (The Richardson Associates) to provide consulting services for the programming and conceptual design of the “Parking Structure”, Project No. 19-A-124-3 at the Salt Lake International Airport. These services will produce a Design Directive Document for a parking structure near Terminal Unit 1, Terminal Unit 2 and future Terminal Unit 3 including pedestrian elevators, pedestrian access/egress and associated vehicle ramps, bridges to TU-1 and TU-2 with provision to future TU-3 remodeling of surrounding on-grade parking lots within the terminal drive loops and accommodation of the bridge terminus at TU-1 and TU-2. This will be for a sum of $67,950. C 83-13
On September 18, 1984, an Amended Cash Bond Agreement with Alan Parsons was approved which will function in the same manner as a performance bond, insuring that Mr. Parsons will complete necessary repairs to the house he has moved from 621 North Redwood Road to 1643 West 700 North. C 83-14
On January 4, 1983, an escrow bond agreement between the city, Sinclair Oil Corporation and Associated Title was approved requiring Sinclair to post a $100,000 bond guaranteeing landscaping completion as Sinclair is desirous of obtaining a certificate of occupancy at 550 East South Temple known as the Governor’s Plaza Building, in advance of total completion of the landscaping. C 83-15
On January 18, 1983, an agreement was approved between the city and the Housing Authority of Salt Lake City for the installation of the water and sewer mains within the Jefferson Circle Subdivision, whereby the Housing Authority agrees to install the water and sewer mains as per plans approved by the Department of Public Utilities.
C 83-16
On January 4, 1983, an agreement was approved between the city and the Housing Authority of Salt Lake City for Watermain Extension No. 35-4215 to serve the Jefferson Circle Subdivision located at Jefferson Street south from 1700 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-16
Extra Work Orders for the 4th Avenue Storm Drain, Project No. 47-N-225-2 with Dwight Peterson and Sons Excavating, original contract was executed in May, 1981. C 83-17
On July 19, 1983, a service agreement was approved with Michael Dan Smith of the Planning and Zoning Division extending the city’s contractual agreement for a period of one year commencing July 1, 1983. C 83-18
On January 14, 1983, a service agreement was approved hiring Michael Dan Smith as a Planner II in Planning and Zoning. C 83-18
On July 19, 1983, a service agreement was approved with William Nebeker of the Planning and Zoning Division extending the period of the city’s contractual agreement for one year commencing July 1, 1983. C 83-19
On January 14, 1983, a service agreement was approved hiring William H. Nebeker as a Planning Aide Intern in Planning and Zoning. C 83-19
On July 19, 1983, a service agreement was approved with James Strozier of the Planning and Zoning Division extending the city’s contractual agreement for a period of one year commencing July 1, 1983. C 83-20
On January 14, 1983, a service agreement was approved hiring James K. Strozier, Jr. as a City Planning Aide in Planning and Zoning. C 83-20
On January 12, 1983 a revocable permit was approved for Maurice Johnson for installation and maintenance of a sewer service line across the East Jordan Canal extension at 1471 Fort Union Boulevard. C 83-21
On December 6, 1983, an amendment to the agreement with Diamond Tree Experts, Inc. was approved which will allow the city to exercise its option to renew the agreement for city shade tree trimming for an additional year. C 83-22
On January 11, 1983, an agreement was approved with Diamond Tree Experts, Inc. to provide tree trimming services for the city. The agreement shall remain in effect until May 30, 1983 or until the designated funds of $100,000 are exhausted. C 83-22
On January 24, 1983, a contract was approved with Noland and Son Construction for Sanitary Sewer Extension 50-1258, 500 East between 2549 South and 2579 South for a cost of $16,667.50. C 83-23
On January 6, 1983, a letter of request for permission to waive formal bidding was approved for the proposed Sanitary Sewer Replacement Line, Extension No. 50-1258. The existing 8-inch sewer pipeline on 500 East between 2549 and 2579 South is in very poor condition and Sewer Division maintenance crews have indicated that this pipeline should be replaced immediately. C 83-23
On January 18, 1983, it was approved to increase the hangar rental rate, effective July, 1982 for Veigh Cummings, Individual, and Aspen Hills Corporation, leasing Shade Hangar 6, Row 14 at the Salt Lake International Airport. C 83-24
On January 18, 1983, it was approved to increase the hangar rental rate, effective July, 1982 for Jonathan H. Horne, Individual, leasing Hangar 17, Row 9 at the Salt Lake International Airport. C 83-25
On January 18, 1983, it was approved to increase the hangar rental rate for Jay Christiansen, Individual, and CDM Partnership, leasing Hangar 9, Row 9 at the Salt Lake International Airport. C 83-26
On January 18, 1983, approved increase to the hangar rental rate for Kenneth Hepner, Individual, and Barken International, leasing Hangar 1, Row 15 at the Salt Lake International Airport. C 83-27
On January 18, 1983, approved increase to the hangar rental rate for Veigh Cummings, Individual, and Aspen Hills Corporation, leasing Hangar 6, Row 15 at the Salt Lake International Airport. C 83-28
On January 18, 1983, an agreement was approved with Burrows Smith and Company which provides a temporary suspension of their financial advisory agreement. This will enable them to temporarily suspend their financial advisory relationship with the city and act as a purchaser of the approximately $26,000,000 principal amount of Water and Sewer Revenue Bonds on a negotiating basis. C 83-29
On April 5, 1983, an agreement was approved with Prudential-Bache Securities, Burrows Smith and Company Division as the “Financial Consultant” relating to the issuance of the 1983 Airport Revenue Bonds for the Delta/Western Expansion. The fees to provide the above services would be .75 per $1,000 of bonds issued. This fee does not include the cost of out of pocket expenses, i.e. printing and mailing costs, rating agency fees and travel, etc. C 83-30
On January 18, 1983, a Dog License Soliciting contract was approved with John Trujillo. The purpose of this contract is to provide the city with additional license revenue and control of the animal population without increasing the number of employees. Each independent contractor will conduct door-to-door campaigns to insure that all dogs have had a rabies vaccination and have a license. The fees from any licenses received through this process will be shared between the city and the contractor, thus no funds are necessary to implement this program. C 83-31
On January 18, 1983, a Dog License Soliciting contract was approved with Phillip S. Wayman. The purpose of this contract is to provide the city with additional license revenue and control of the animal population without increasing the number of employees. Each independent contractor will conduct door-to-door campaigns to insure that all dogs have had a rabies vaccination and have a license. The fees from any licenses received through this process will be shared between the city and the contractor, thus no funds are necessary to implement this program. C 83-32
On January 18, 1983, a Dog License Soliciting contract was approved with Hector Vasquez. The purpose of this contract is to provide the city with additional license revenue and control of the animal population without increasing the number of employees. Each independent contractor will conduct door-to-door campaigns to insure that all dogs have had a rabies vaccination and have a license. The fees from any licenses received through this process will be shared between the city and the contractor, thus no funds are necessary to implement this program. C 83-33
On January 18, 1983, a Dog License Soliciting contract was approved with Ken Wheeler. The purpose of this contract is to provide the city with additional license revenue and control of the animal population without increasing the number of employees. Each independent contractor will conduct door-to-door campaigns to insure that all dogs have had a rabies vaccination and have a license. The fees from any licenses received through this process will be shared between the city and the contractor, thus no funds are necessary to implement this program. C 83-34
On January 18, 1983, an agreement was approved with WDB Enterprises, Inc. to make a 4-inch automatic sprinkler connection for the Intermountain Innovation Center located at 417 Wakara Way.
C 83-35
On January 18, 1983, three separate agreements were approved with D. Michael Stewart, Salt Lake County Commission Chairman, to make 6-inch Detector Check Valve connections for the Salt Palace Exhibition Hall in connection with the present Salt Palace Expansion. C 83-36
On January 18, 1983, an agreement was approved between the city and the Salt Lake International Center providing for the installation of the watermains and sewermains within a commercial subdivision to be known as “Salt Lake International Center Plat 16”, whereby the SLIC agrees to install the water and sewer mains as per plans approved by the Department of Public Utilities. C 83-37
On January 18, 1983, an agreement was approved with Sowby and Berg, Consultants to train personnel of the Public Utilities Department in the use of the pitometer. The pitometer is a bisic hydraulics tool which can be used for flow measurement, water meter testing and determination of a pipeline’s coefficent of friction. The cost for this training will not exceed $3,000. C 83-38
..n May 3, 1983, the contract with Miller Electric was approved for the Taxi Call-up and Terminal Units No. 1 and 2 Security Monitoring System at the Salt Lake International Airport, Project 19-4-121-2 in the amount of $36,681. It was determined not to award Alternate No. 1. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-39
KOEPF AND LANGE, CONCOURSE “D”, FUEL FARM
Amendment #4: In the amount of $8,000.00 to the professional engineering services agreement with Koepf and Lange for the design of an aircraft fuel system for Concourse D and modifications to the fuel farm at the Salt Lake international Airport. This is for additional design and inspection work in order to finalize the project. C 83-40
On February 19, 1985, Amendment No. 3 was approved in the amount of $29,000.00 with Koepf and Lange, Inc., Consulting Engineers. The consultant will provide professional services in completing the underground aircraft fueling system on the West Side of Concourse “D”. C 83-40
On February 19, 1985, Amendment No. 2 was approved In the amount of $14,196.00 with Koepf and Lange, Inc., Consulting Engineers. The consultant will provide professional services in relocating aircraft fueling pits in accordance with the revised aircraft parking positions on Concourse “D”. C 83-40
On March 6, 1984, Amendment No. 1 to the agreement with Koepf and Lange, Inc., Consulting Engineer was approved to include the services of a Resident Engineer to act as a project representative during the construction of the Aircraft Fuel System for Concourse D and for modifications to the Fuel Farm at the Salt Lake International Airport. The fee for this service will not exceed $65,060. C 83-40
On December 20, 1983, a letter of agreement was approved for Koepf and Lange, Inc. to provide additional services necessary since their July, 1983 agreement for the design of an aircraft fuel system for Concourse 0 and modifications to the fuel farm at the Salt Lake International Airport. During the course of construction, leaks were discovered in the existing 20 inch fuel line necessitating inspection by K & L to determine the extent of damage to the line and define the most appropriate means of repair. They will also design a Reclaim Station to salvage fuel which would otherwise be wasted. The fee for these services will be $3,550. C 83-40
On July 19, 1983, an agreement was approved with Koepf and Lange, Inc. to provide professional engineering services for the design of an aircraft fuel system for Concourse D and Modifications to the Fuel Farm at the Salt Lake International Airport. The services will consist of an underground aircraft fuel system for Concourse “D” including a fuel loop, laterals and hydrants around Concourse “D” and extension of fuel supply main from existing system to Concourse “D”, providing new supply pumps and filters at the Fuel farm; a new 30,000 Bbl fuel tank with floating suction and modification of the existing storage to a floating suction pick-up. The fee for these services shall be on a time and expense basis in an amount not to exceed $110,000. C 83-40
On January 24, 1983, a letter of request was approved to waive the provision of Chapter 12 of Section 24 of SLC Ordinances entitled “Contracting for Professional Services” relating to the selection process for engineering services authorizing the Airport Authority to negotiate a contract with Koepf and Lange for the design of improvements to the aircraft parking apron and fuel system related to the Concourse “D” expansion. The new aircraft parking positions require an underground fuel system with hydrant pits at each gate. Additional pumping and storage capacity at the fuel farm is also required. Cost of the fuel system improvements is estimated to be $1,540,000. C 83-40
On January 24, 1983, a Revocable Permit was approved for Community Telecommunications to lay a cable on a portion of the city’s Jordan and Salt Lake City Canal property. C 83-41
On January 24, 1983, a Revocable Permit was approved for Cynthia P. Spencer for the lease of watershed property for planting alfalfa or grass for livestock feed on city owned property located at the rear of her residence at 9447 South 3200 East in Sandy, Utah. C 83-42
On February 2, 1983, it was approved to lease Hangar 14, Row 1 at Salt Lake City Airport II to Tom Shirley, Individual, commencing August 1, 1982. C 83-43
On February 2, 1983, it was approved to lease Shade Hangar 13, Row 12 at the Salt Lake International Airport to Wayne Leydsman, Individually, commencing November 20, 1982. C 83-44
On February 2, 1983, an agreement was approved with JKP Investment for Watermain Ext. No. 35-4217 within a commercial subdivision known as Cassity Plaza whereby they agree to install the watermains as per plans approved by the Department of Public Utilities. C 83-45
On February 2, 1983, an agreement was approved with JKP Investment for Watermain Ext. No. 35-4217 to serve Cassity Plaza located at 3120 South 1300 East. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this commercial subdivision over and above the normal expenditure for the extension. C 83-45
On February 2, 1983, an agreement between the city and the Utah State Department of Transportation was approved for the installation of Watermain Ext. No. 35-4217 on 1300 East (Richmond Street) from Brickyard Road to a point north of Gunn Avenue. C 83-45
On February 8, 1983, an Engineer Consulting Contract was approved with James M. Montgomery to develop a preliminary feasibility assessment of the hydropower potential of 32 identified potential power production sites located within the city’s water source and service area. C 83-46
On February 2, 1983, Amendment No. 1 to the agreement with International Environmental, Inc. was approved which will allow them to continue to conduct a pilot plant at the city’s Water Reclamation Plant for an additional year. The period will be extended through November 18, 1983, with all of the terms of the original agreement remaining unchanged and in full force and effect. C 83-47
On February 2, 1983, an Engineer Consulting Contract was approved with Olympus Aerial Surveys for City Project No. 2-P-3, to provide all engineering services necessary, including the full range of photogrammetic engineering services in order to provide for orthophoto mass for Main Street, (downtown) and for aerial photographs and contour maps for the area near 5d0 South and Redwood Road. This work will be provided at a cost of $3,987 with $2,900 being used for work on Main Street and $1,087 for the area near 500 South and Redwood Road. The city engineer’s office is authorized to issue a notice to proceed to the consultant. C 83-48
On February 8, 1983, the plats and contract agreements were approved along with an easement for Salt Lake International Center, Plat 10-C. C 83-49
On December 6, 1983, a supplement was approved with American Bell, Inc. to aid them in updating their records. This agreement, #00037761 Supplement SAE 0001, replaces #00037761 approved February 8, 1983.
C 83-50
On February 8, 1983, a Service/Purchase Agreement was approved with American Bell, Inc. This was necessary due to the recent separation of Mountain Bell into two companies, Mountain Bell and American Bell, Inc. C 83-50
On February 8, 1983, a Quit-Claim Deed, Agreement to Release Easement and Water Supply Permit and Agreement were approved for a small city owned cabin lot located in Brighton, Utah to be conveyed to Mr. Todd S. Winegar. Mr. Winegar’s bid of $42,000 for the purchase of this lot was accepted following a previous public auction but because of legal complications regarding the water rights on this lot, actual title transfer of this property has been delayed until now. C 83-51
On January 24, 1984, an amendment to the agreement with Richard A. Christensen was approved which amends the term of the original agreement for ten years, provides for the successive five-year period extensions upon written consent by both parties and provides for renegotiation at the city’s option of the price of the water. C 83-52
On February 8, 1983, an amendment to Water Supply Agreement was approved between the city and Richard A. Christenson. C 83-52
On February 8, 1983, an agreement was approved with Salt Lake County Flood Control which will amend the Urban Runoff Study, extending the completion date until December 31, 1983. C 83-53
On February 15, 1983, the plat sheets and contract agreement for Salt Lake International Center, Plat 14, and Project 38-714 were approved.
C 83-54
On February 15, 1983, the plat sheets and contract agreement for Salt Lake International Center, Plat 13 were approved. C 83-55
On February 15, 1983, an agreement was approved with Skaggs Telecommunications for the installation of communications equipment. The required services will be performed for the sum of $142.50 per vehicle. C 83-56
On February 15, 1983, a contract was approved with the firm of Linton, Mields, Reisler and Cottone, Ltd. to provide advice and counsel to the city concerning the substance of federal programs affecting its activities, the administration of such programs and their prospects for change through congressional or administrative action. Costs for these services will be $3000. C 83-57
On February 15, 1983, an agreement was approved with Mr. Paul Harmon, Professor of Management, for enlisting speakers for a training program to provide management skills and information to the command personnel in the Police and Fire Departments. These services will be provided at a cost of $4,374. C 83-58
On February 15, 1983, an agreement was approved with R. K. Nielsen Construction Inc. for existing Watermain Extension No. 33-C-726 to serve Villas of County Lane PUD located at 1050 East 4500 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-59
On March 1, 1983, an agreement was approved with American Stores Properties, Inc. for Watermain Ext. No. 33-C-1270 to serve their property located at 3171 East 3300 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this property over and above the normal expenditure for the extension. C 83-60
On February 15, 1983, an agreement was approved with American Stores Properties, Inc. permitting them to make an 8-inch Detector Check Valve connection for the Skaggs Alpha Beta store located at 3171 East 3300 South. C 83-60
On February 15, 19a3, an agreement was approved with Seagull Recycling Co. providing a newspaper collection service to city residents. This service will be provided on a daily basis, coinciding with garbage pickup areas. The projection on tonnages that would be collected show a possible savings to the sanitation budget in waste disposal of between $10,000 to $27,000 per year. C 83-61
On February 8, 1983, an agreement was approved with Utah Communications and Electronics, Inc. which will enable the city to install a radio repeater on the Beneficial Life Tower. This will provide an improved means of radio communication for personnel in the Engineering Department. The rental fee has been waived by Beneficial Life Insurance Company and their tenant Utah Communications and Electronics, Inc., however, we are responsible for power costs of $15 per month to begin February 1, 1983. C 83-62
On February 15, 1983, the contract with Wright Engineering and Construction was approved for Sealing of the Mine Shaft at Ensign Peak, Project No. 19-2. Total cost for this project is $4,700. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-63
On March 1, 1983, the contract agreement and plat map were approved with Gary Howlett Construction Company, Inc. for construction of the Glen Aire Subdivision, Project No. 38-739, located at 1650 South 1300 West. C 83-64
On March 1, 1983, an agreement was approved with Business Smith, Inc. to provide services as the “Traffic and Earnings Consultant” relating to the issuance of the 1983 Airport Revenue Bonds for the Delta/Western Expansion. The estimated cost to provide these services is $25,000. C 83-65
On March 1, 1983, the contract with Ralph Tye and Sons, Inc. was approved for the Boiler Burner Replacement, Project 19-A-98-2 at the Salt Lake City International Airport. The amount of the contract is $26,410. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-66
On March 1, 1983, the contract with Watts Construction, Inc. was approved for the public improvements in the 1979 annexed territory east of Richmond Street between Miller and Woodland Avenues known as the Malouf Annex. In 1979, the document was forwarded to the City Engineering Department with instructions to file it until the public improvements were installed. C 83-67
On March 1, 1983, an agreement was approved with Rollins, Brown and Gunnell, Inc. to provide consulting services to perform the Master Drainage Study, Project 19-K-119 at the Salt Lake International Airport. The services will consist of making a study, preparing a drainage master plan, submitting a report and drawings and providing a finished product adequate to meet the needs of the city. The fee for rendering these services will not exceed $30,000. C 83-68
On March 1, 1983, the maintenance contract agreement between the city and A. B. Dick Company was approved for maintenance of equipment in the Citizen Participation Department. C 83-69
On February 23, 1983, a Letter of Credit Bond Agreement was approved with Beesley Construction Company for the purpose of ensuring the city of compliance with an existing enforcement action by Building and Housing Services against Beesley. On about September 1, 1982, Beesley, in partnership with C.K. Cummings, commenced a major excavation in anticipation of building an office building on the corner of 1775 South 1100 East without benefit of permit from SIC. The excavation remained in the same condition for six months. Due to the extent of the excavation, the city determined the excavation to be a public nuisance and a threat to the safety of the public. Beesley elected to enter into an agreement with the city submitting a. letter of credit in the amount of $15,000 that, upon default of the terms of the bond, will be executed by the city to have the excavation abated by fill. C 83-70
On March 1, 1983, a maintenance agreement was approved with Larry Dean Construction Company for roof, drain gutter and scaffold inspection of the City and County Building. The agreement will provide two inspections annually for the sum of $6,055 to be paid upon completion of each inspection. C 83-71
On March 1, 1983, an agreement was approved with Dieter Kunkel, dba Sure Clean for janitorial services for all floors of the Fifth Judicial Circuit Courts Building. This agreement will be for one year and will be paid monthly at the rate of $1,095 per month. C 83-72
On March 3, 1983, approval was given Randall B. Nielson to terminate his services with the volunteer Police Chaplain Corps. C 83-73
On March 3, 1983, approval was given Richard Amos to terminate his services with the volunteer Police Chaplain Corps. C 83-74
On March 3, 1983, approval was given Deloy S. Dawson to terminate his services with the volunteer Police Chaplain Corps. C 83-75
On July 1, 1983, the cover sheet mylar was approved for Project 34-D-34, White Reservoir. C 83-76
On March 1, 1983, the Engineer Consulting Contract with Delta Geotechnical Consultants, Inc. was approved to obtain a soils report and recommendation for foundations for the replacement of the White Reservoir, Project 34-D-34. The cost for this service will be $1,100. C 83-76
On March 1, 1983, the Engineer Consulting Contract with Dames and Moore was approved to provide a soils, foundation and ground water study necessary for the design of the new outfall structure at the city’s Wastewater Treatment Plant, Project S-1. The total cost will not exceed $3,600. C 83-77
On April 5, 1983, the contract with Associated Specialties Co. was approved for the Concourse “C” Wall Panel Repair & Replacement at the Salt Lake International Airport, Project No. 19-A-106-21. The contract was awarded for Alternate Mo. 2 bid only for a cost of $39,983. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-78
On April 12, 1983, an interlocal cooperation agreement was approved with the University of Utah wherein the U will provide maintenance to landscaping on all of the city’s property at the 500 South Reservoir bordering on the University. The U will furnish the landscaping plans subject to city approval and the city will pay the actual costs of the landscaping up to $14,000. C 83-79
On March 8, 1983, an agreement was approved with the Salt Lake City Employees Credit Union to lease approximately 212 square feet of floor space on the second floor of Terminal Unit I at the Salt Lake International Airport as an accommodation to city employees. Terms of this lease will commence November 8, 1982 for one year expiring November 7, 1983 for a total of $2,544 per year. C 83-80
On March 8, 1983, an agreement was approved with Arthur Young and Company to audit the internal accounting controls surrounding sales and gross receipts employed by Budget and Avis Rent-A-Car. The nature and scope of work to be undertaken will result in a formal report presented to the Airport Authority. The total cost for performing this evaluation shall not exceed $7,775 and will be completed by May 30, 1983. C 83-81
On March 9, 1983, a grant offer for the Airport Improvement Program, AIP Project No. 3-49-0032-01 at Salt Lake City Airport II was approved. Federal funds of $348,311 have been obligated for the acquisition of land to protect approach areas at Airport II. This grant agreement will provide reimbursement of funds previously expended by the Airport Authority. C 83-82
On March 1, 1983, an agreement was approved with AAA Demolition for demolition work at property located at 913 West 200 North owned by Terry Talbot. Amount of the contract is $960. C 83-83
On March 8, 1983, a service agreement was approved with Glenn R. Graham as a City Planner I in the Planning and Zoning Division commencing March 1, 1983. C 83-84
On March 6, 1984, an agreement was approved with Lien Services for restroom sanitation services at the city golf courses. C 83-85
On March 8, 1983, agreements ware approved with Lien Chemical of Salt Lake for restroom sanitation at city golf courses in the following amounts: Rose Park $25.08 per week; Glendale 25.08; Nibley 14.63; Forest Dale 18.81; Bonneville 25.08 and Mountain Dell 39.71. C 83-85
On April 5, 1983, an agreement was approved commissioning Joseph R. Sanders to serve as a Police Chaplain in the Police Chaplain’s Corps. C 83-86
On April 5, 1983, an agreement was approved commissioning Roger I. Bastian to serve as a Police Chaplain in the Police Chaplain’s Corps. C 83-87
On May 31, 1983, the contract with Frank George & Sons was approved for Watermain Ext. 35-4200, Grove Street between West Temple and Main Street, a Community Development Project. C 83-88
On May 31, 1983, the contract with Frank George & Sons was approved for Watermain Ext. 35-4203, Quayle Avenue, West to Richards Street, a Community Development Project. C 83-89
On March 8, 1983, the mylar was approved for Watermain Extension No. 35-4201, Richards Street, north of 2100 South. C 83-90
On March 8, 1983, the mylar was approved for Watermain Extension No. 35-4207, Andrew Avenue, Main to Richards Street. C 83-91
On March 8, 1983, an agreement was approved with the Utah Department of Transportation (UDOT) for Project I-215-9(56)25, I-215 at 1700 North and 2200 North Ramps Grading, Drainage and Surfacing for adjustment of water facilities. C 83-92
On March 8, 1983, the contract with The Tempest Company was approved for the Irrigation Pipeline Replacement 26-SR-6, Crossing under Big Cottonwood Creek. Total cost for this project is $16,850.18. C 83-93
On March 21, 1983, an agreement was approved with the Utah Department of Transportation for the installation of Watermain Ext. No. 35-4152, 500 North, 1000 West to Redwood Road. C 83-94
On May 10, 1983, an agreement was approved with Westcon for the construction of Watermain Ext. 35-4152 at 500 to 700 North, 1000 West to Redwood Road. The cost for this project is $454,562.80. C 83-94
On April 5, 1983, the contract with Build, Inc. was approved for the replacement of the diversion structure at 6600 South 3000 East at Big Cottonwood Creek and the Upper Canal, Project No. 26-SR-7. Amount of the contract is $7,780. C 83-95
On March 11, 1983, plans and specifications were approved for Replacement of Diversion Structure at 6600 South 3000 East, Project No. 26-SR-7. C 83-95
On March 11, 1983, the plat was approved for the 13th Avenue Subdivision. C 83-96
On March 16, 1983, an agreement was approved with Arthur Young & Company to conduct this year’s audit of the city’s financial statements. The cost of this contract is $145,800. C 83-97
On March 8, 1983, a secondary party agreement was approved between the city and Roger W. Swenson dba Swenson Software, The Mountain States Telephone & Telegraph Company, Utah Power & Light and Mountain Fuel Supply Company which will enable the city to become affiliated with the Blue Stakes Service. This service will provide information on a continual basis regarding individuals who have complied with state law and have contacted the service about their plans to excavate in the Salt Lake City area. The equipment will cost approximately $2,000 to acquire and $150 per month to operate.
C 83-98
On March 21, 1983, a Revocable Permit was approved for John Kuepper and Lisle G. Brown to install two gates on city property. This is in connection with Petition 149 of 1982 by John Kuepper requesting that the city close the alley located between Harvard and Hampton Avenues and ZOO and 300 East. The gates will reduce vehicular traffic and criminal activity in the neighborhood. C 83-99
On March 6, 1983, an application form to the Utah Disaster Relief Board was approved for their participation for the Tanner Ditch Diversion structure in Big Cottonwood Creek, Project No. 26-SR-9. The work was required because of the 1983 spring floods. C 83-100
On April 5, 1983, a quit-claim deed and interlocal cooperation agreement were approved between the city and the Housing Authority of Salt Lake City conveying to the Housing Authority a small building lot located at 749 Roberta Street for the construction of a duplex family residence for low to moderate income families. C 83-100
On April 5, 1983, a lease agreement was approved between the city and Utah Power & Light Company for property used as a reservoir site located in the mouth of Millcreek Canyon. The first annual rental fee will be $350. C 83-101
On April 5, 1983, a revocable permit was approved granting Warwick C. Lamoreaux and David W. Freed permission to use certain property in the vicinity of 1087 and 1111 South 1300 East for the purpose of maintaining a fence which had been constructed for privacy and safety purposes across a gully in this vicinity. This is in regards to Petition No. 462 of 1980. C 83-102
On April 20, 1983, an interlocal cooperation agreement was approved between the city and Salt Lake County for jointly funded Community Development Block Grant (CDBG) projects to be effective as of July 1, 1979. The City Council adopted Resolution 26 of 1983 authorizing this agreement. C 83-103
On March 24, 1983, a professional contractual agreement was approved with the Utah Department of Transportation, Materials and Research Division to obtain equipment to perform construction materials tests for which the city does not have the required equipment. The cost for this equipment will not exceed $6,000. C 83-104
On March 21, 1983, a hangar lease agreement was approved for W. Kurt Dobson, Individually, and Flying D. Leasing to lease Hangar 21, Row 11 at the Salt Lake International Airport. C 83-105
On March 24, 1983, a hangar lease agreement was approved for James Lindsay, Individually, and LEERCO to lease Hangar 3, Row 7 at the Salt Lake International Airport. C 83-106
On March 21-, 1983, an agreement was approved with Wayne King to provide dog license soliciting. This will provide the city with additional license revenue and control the animal population without increasing the number of employees. Each independent contractor will conduct door-to-door campaigns to insure that all dogs have had a rabies vaccination and have a license. The fees from any licenses received through this process will be shared between the city and the contractor. C 83-107
On March 21, 1983, an agreement was approved with G Services for janitorial services for the second and third floors of the Metropolitan Hall of Justice. This contract will be for one year and paid monthly at the rate of $770 per month. C 83-108
On March 21, 1983, an agreement was approved with Bay Construction, Inc. to provide a D-8 Caterpillar with operator to be provided the Parks Department on an “as needed’ basis at the fixed hourly rate of $70 per hour. C 83-109
On March 21, 1983, an agreement was approved with Bland Brothers, Inc. to provide a backhoe with operator for the Parks Department to be used on an “as needed” bas{s at a fixed hourly rate of $27.50 per hour. C 83-110
On March 21, 183, an agreement was approved with Adorn Landscaping to provide a sprinkler fitter, laborer and trencher with operator for the Parks Department on an “as needed” basis. The city agrees to pay the following sums per hour with a minimum of eight hours per call out guaranteed: Sprinkler fitter-$17, laborer-$8 and trencher with operator-$27. C 83-111
On March 24, 1983, an agreement was approved with G-II Corporation to provide D-3 Caterpillar grading for the Parks Department on an “as needed” basis at a fixed hourly rate of $33 per hour. C 83-112
On March 24, 1983, an agreement was approved with Bland Brothers, Inc. to provide a landscape tractor with operator for the Parks Department on an “as needed” basis at a fixed hourly rate of $27.50 per hour. C 83-113
On March 21, 1983, an agreement was approved with Rodney Seymour d/b/a G Services to provide janitorial services for the fourth and fifth floors of the City & County Building, and fourth, fifth, sixth, seventh and eighth floors of the Metropolitan Hall of Justice. This contract will be for one year and will be paid monthly at the rate of $940 per month. C 83-114
On February 2, 1983, an Architectural Consultant Agreement was approved with R. Michael Kelly for planning and design work related to the Rose Park Tot Lot located at 800 North Lafayette Drive, Project No. PAl. Architect’s fees for rendering these services shall not be more than $4,500. C 83-115
ECKNOFF WATSON & PRBATOR ENGINPERING
Amendment: design modification to California Avenue Bridge at Surplus Canal, Project 41-A-22, $l,000. C 83-116
On April 5, 1983, an agreement was approved with Eckhoff, Watson and Preator Engineering for the preparation of design plans and specifications for a new bridge to be located at California Avenue and the Surplus Canal, Project No. 41-A-22. The fee for this project will be $38,500. The City Engineer’s Office is authorized to issue a notice to proceed to the consultant. C 83-116
On March 21, 1983, the contract with Newman Construction was approved for the Rose Park Golf Course Irrigation System, Project No. 19-Y-19-7 for a total cost of $17,958.90. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-117
On April 19, 1983, the contract with Ivell Construction was approved for the Capitol Hill Community Center Door Modifications, Project No. 19-M-22-3 at a cost of $16,996. The City Engineering Office is authorized to issue a notice to proceed to the contractor. C 83-118
On March 21, 1983, an agreement was approved with Prescott, Muir and Associates for the design of exit doors and stairs at the Capitol Hills Community Center at 173 West 500 North, Project No. 19-M-22-3 for a fee of $2,718. C 83-118
On August 11, 1983, Amendment No. 1 to the supplemental agreement with Jones, Waldo, Holbrook and McDonough was approved to perform the services of due diligence attorney relative to the issuance of the 1983 Airport Revenue Bonds. This amendment raises the amount contained in the original agreement from $30,000 to $50,000. C 83-119
On April 12, 1983, an agreement was approved with Jones, Waldo, Holbrook and McDonough to serve as “Bond Counsel” relating to the issuance of the 1983 Series Airport Revenue Bonds for the Delta/Western expansion. The fees to provide the above services, based on the bonds being sold through a competitive bid process would be $1 per $1,000 of bonds issued up to $25,000,000 and $.50 per $1,000 of bonds issued in excess of $25,000,000. This fee does not include the cost of out of pocket expenses for travel, transportation, parking, copies, mailing, etc. C 83-119
On April 5, 1983, a maintenance agreement was approved with AAA Fire, Safety & Alarm for the maintenance of the Halon 1301 fire suppression system located at the Police Department. There are two different types of service to be performed on the system. The first service is to be done in the months of January and July at a cost of $368 each. The second service is to be done in the months of May and October at a cost of $167.50. The total annual cost will be $1,071. C 83-120
On April 5, 1983, a fifty year license agreement was approved with the United States of America for Watermain Extension 33-C-1236, construction of a 20-inch waterline to connect to the Salt Lake Aqueduct near the McEntire Reservoir. C 83-121
On April 5, 1983, an engineer consulting contract was approved with Black & Veatch, Engineers-Architects for a sludge injection demonstration project to be made on the premises of the Salt Lake International Airport. C 83-122
On April 5, 1983, an agreement was approved with Super 8 Motels of Salt Lake City by L. A. Hurt to make a four-inch automatic sprinkler connection for their property located at 616 South 200 West. C 83-123
On April 5, 1983, an agreement was approved with Grant Square Associates by Gilbert Warner to make a six-inch automatic sprinkler connection for their property located at 335 East 600 South. C 83-124
On April 5, 1983, a revocable permit was approved for Brent P. Ford to use water from the Jordan and Salt Lake Canal adjacent to the property at 1362 East 345 South for irrigation purposes. C 83-125
On April 5, 1983, an amended agreement was approved with The Land Group for the design of 1300 South from 700 East to 1300 East, Project No. 38-686; 1700 South from State Street to 700 West and Storm Drain Improvements, Project No. 38-685. This agreement will provide for additional work that is required on the storm drain improvements on 1700 South from State Street to 700 West. The cost for this additional work will be $9,139. The cost for all work associated with this project will be $67,749. C 83-126
On April 5, 1983, the contract with Allstate Builders, Inc. was approved for construction of the Liberty Park Development Improvements, Project No. 19-M-17-1, for a total cost of $196,231.25. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-127
On April 5, 1983, an agreement was approved with Gene A. Babb providing for the relocation and installation of Watermain Extension No. 35-4223 in the Sierra Park Subdivision whereby Mr. Babb agrees to install the watermain as per plans approved by the Department of Public Utilities. C 83-128
On April 12, 1983w Standard Form Agreement 5-W-19 was approved for the Corporation of the Presiding Bishop of the Church of Jesus Christ of Latter-Day-Saints to Waive the Installation of Public Way Improvements for property near the intersection of 1700 South and Industrial Road. C 83-129
On April 12, 1983, an agreement was approved with Chen & Associates, Inc. to undertake the performance of geotechnical investigations at the Salt Lake International Airport. The services will consist of subsurface exploration and determination of load bearing capacity, all reported in typewritten form for the following: Project 19-A-136-4, Concourse “B” Apron, Project 19-A-138-1, Taxiway “A” Rehabilitation, and Project 19-A-127, Air Cargo Building Removal. The agreed amount for these services will not exceed $5,500. C 83-130
On February 7, 1984, Amendment No. 1 to the agreement with Edwards and Daniels Associates, Architects, Inc. was approved which will allow the city to request additional or special services when required, such as building furnishings, signage, landscaping, etc. The fee for these services shall not exceed $85,000. C 83-131
On January 29, 1985, Amendment No. 2 was approved with Edwards & Daniels Associates, Architects, Inc. to provide full architectural services for the Minors Room in Concourse “C”, Terminal 2, and design changes for Project Nos. 19-A-106-20 and 19-A-160. This increases the fee of $632,150.00 by $7,981.00 making the total f.ee $640,131.00 and increases the reimbursable fee to $58,868.00. C 83-131
On April 9, 1985, Amendment No. 3 was approved in the amount of $21,038.00 with Edwards and Daniels Associates, Architects, Inc. to provide basic services for completion of Gates D2, 4, 6 and 8 on Concourse “D” at the Salt Lake International Airport including construction of two additional stair towers. C 83-131
On April 12, 1983, an agreement was approved with Edwards & Daniels Associates, Architects, Inc. to perform all architectural and engineering services necessary to provide the design, layouts, analysis, plans, specifications, estimates and other items for the additions and modifications to Terminal Unit No. 2, second level only of Concourse “C”, the Boiler Plant, Concourse “D” and the Second Level Connector between Concourse “D” and Terminal Unit No. 2 with the exception of special systems. The fee for rendering all services wider this agreement shall not exceed $632,150 for basic services and $29,850 for reimbursable expenses. C 83-131
On April 12, 1983, an agreement was approved with Delta Geotechnical Consultants, Inc. to undertake the performance of geotechnical investigations at the Salt Lake International Airport. The services will consist of subsurface exploration and determination of load bearing capacity to be reported in typewritten form for Project 19-A-152-2, Concourse “D” Connecting Taxiway and Project 19-A-116-7, Air Cargo Support Apron. Total amount for these services will not exceed $7,500. C 83-132
On April 12, 1983, a contract was approved for Elizabeth Siddoway to serve as a part-time temporary research assistant for the City Council. She has previously served as an unpaid intern in the Council Office. C 83-133
On April 12, 1983, an agreement was approved with Peter B. Atherton for administration of a $5,702.80 grant from the Utah Endowment for the Humanities. The services to be provided with these funds include publication of a newspaper supplement and a symposium series to educate the public on an Historic Preservation Plan for downtown Salt Lake City recently completed by the City Planning Department.
C 83-134
On April 12, 1983, a service agreement was approved with Craig Skousen to serve as student intern for Capital Planning and Programming. C 83-135
On April 12, 1983, a grant agreement was approved with Artspace, Inc. to provide temporary and partial administrative funding for the Mixed Use Housing project. This contract shall be in effect from September 1, 1982 to December 31, 1983 and the budgeted amount for this CDBG project shall not exceed $18,500. C 83-136
On April 12, 1983, a grant agreement was approved with The Travelers Aid Society of Salt Lake City to provide temporary and partial administrative funding for Emergency Housing Assistance Program and the Emergency Housing-Shelter Project. The term of this agreement shall run from July 1, 1982 through June 30, 1983 and the city will provide an amount not to exceed $23,750 for these services. C 83-137
On April 12, 1983, an agreement was approved with Utility Devices, Inc. for the purchase of hand-held water meter reading devices and related system components. Total cost of the equipment will be $48,721. C 83-138
On April 12, 1983, an agreement was approved with Utility Devices, Inc. for hand-held water meter reading devices and related system components. This agreement provides for maintenance of the entire system at a monthly rate of $550. C 83-138
On April 19, 1983, the contract with Millcreek Gardens, Inc. was approved for the Revegetation and Erosion Control at 9th Avenue and 11th Avenue in City Creek Canyon, Project No. 19-3. This project was necessary due to the abnormally high precipitation last year and so far this year. Cost of the project is $6,850.40. C 83-139
On April 12, 1983, an agreement was approved with Ralph R. Moffat for existing Watermain Ext. No. 33-C-653 to serve the Willowbrook Apartments located at 1483 East 4705 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this area over and above the normal expenditure for the extension. C 83-140
On April 12, 1983, an Engineer Consulting Contract was approved with R. Keith Higginson, P.E. for the engineers to prepare Applications for FERC Preliminary Permits and/or Exemptions from Licensing for Hydro-Electric Projects, City Project No. P-2. C 83-141
On April 15, 1983, an agreement was approved with J.K.P. Investment providing for installation of a 48-inch pipe by JKP in the Jordan and Salt Lake City Canal at 1300 East and Gunn Avenue (3070 South) and the conveyance of the property to them retaining an easement for pipe maintenance. C 83-142
On August 29, 1984, an amended agreement in the amount of $2,000 was approved with Chen and Associates for testing concrete beams on 1300 South, 400 West to 200 East, Project 38-681. C 83-143
On March 16, 1984, an amended agreement was approved with Chen and Associates for additional beam testing on 1300 South, 400 West to 200 East, Project 38-681 for a fee of $3,000. C 83-143
On November 15, 1983, an amendment to the agreement with Chen & Associates, Inc. was approved for 1300 South, State Street to 500 West, Project No. 38-681. This is for concrete flexural beam testing for Zane Avenue from Wall Street to West Capitol Street for a fee of $400. C 83-143
On May 31, 1983, an agreement was approved with Chen & Associates, Inc. for Concrete Flexural Beam Testing for 1300 South, 400 West to 200 East, Project No. 38-681. The cost for this work will not exceed $6,000. The engineer’s office is authorized to issue a notice to proceed to the consultant. C 83-143
On April 12, 1983, the contract with G & R Contractors was approved for Street and Storm Drain Improvements on 1300 South from 400 West to 200 East, Project No. 38-681. Schedules A, B, D and F in the amount of $2,546,586 have been awarded. Monies will come from the Collector Road Fund, $1,012.904, the County Flood Control Fund, $1,391,379 and Special Improvement District Fund, $142,303. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-143
On April 20, 1983, a Roadway Easement Exchange Agreement was approved between the city and Salt Lake International Center wherein the SLIC will convey to the city a 25 foot by 691 foot roadway easement in exchange for the city conveyance of 31.50 foot by 691 foot roadway easement. The combined property will allow construction of a 56.5 foot wide driveway to be named Acme Electric Driveway. No compensation is to be paid, however, the SLIC agrees to pay all costs associated with the construction of the driveway. C 83-144
On October 23, 1984, an amended agreement in the amount of $4,000.00 was approved with Delta Geotechnical Consultants, Inc. to perform testing and analysis at Wasatch Springs Park, Project No. 6-3.
C 83-145
On August 29, 1984, an amended agreement in the amount of $8,050 was approved with Delta Geotechnical Consultants, Inc. for City Street and Storm Drains, Project 6-3. This will provide geotechnical testing for 1700 South Storm Drain Improvements and the East Central Block Redesign improvements. C 83-145
On June 5, 1984 an amendment in the amount of $18,868.00 was approved to the contract with Delta Geotechnical Consultants, Inc. for performance of geotechnical testing and analysis, Project No. 6-3.
C 83-145
On August 30, 1983, an agreement was approved with Delta Geotechnical Consultants, Inc. to provide services for the city’s street and storm drain design projects, Project No. 6-3. The consultant’s fee for the services will be a maximum of $20,000 with the actual amount dependent upon the specific work requested. The City Engineer’s Office is authorized to issue a notice to proceed to the consultant. C 83-145
On April 19, 1983, an agreement was approved with Olsen and Peterson, Consulting Engineers, Inc. for service as the Airport Authority’s professional representatives in evaluating, maintaining and modifying the mechanical systems at the Salt Lake International Airport and Airport II and to furnish consultation and advice regarding the mechanical systems. The expansion of the airport includes facilities with complex mechanical systems making it advisable to have a mechanical consultant available to assist AA staff in evaluating mechanical equipment and maintenance problems. Also, the consultant will be able to assist AA staff in reviewing the energy survey of the airport facilities to assure that the recommendations for saving energy are consistent with the capability of the existing mechanical systems at the airport. C 83-146
On April 19, 1983, an agreement was approved leasing Hangar 11, Row 14 at the Salt Lake International Airport to Blaine Straw, Individual1y commencing April 6, 1983. C 83-147
On April 19, 1983, an amendment to an agreement with APA Planning and Research was approved to conduct an in-depth historical/architectural survey of structures located within the south/central portion of the city. This will expand work in the photography and research portions of the present contract providing for additional funding in the amount of $1,000 from CDBG funds. C 83-148
On April 19, 1983, an agreement was approved with Roy Lyman for existing Watermain Ext. No. 33-C-854 to serve his property near 1156 East Murray Holladay Road. This agreement covers special pumping; reservoirs and/or supply lines as required to furnish culinary water to this property over and above the normal expenditure for the extension. C 83-149
On April 5, 19S3, a Pipeline and Easement Replacement Agreement was approved between the city and White Investment Inc., Papanikolas Brothers Enterprises, Melville, Ltd. and American Stores Properties, Inc. for property near 3300 South and 3300 East. C 83-150
On April 19, 1983, an agreement was approved with the Housing Authority of Salt Lake City for a 4-inch automatic sprinkler connection for the Peery Apartments located at 223 3rd Avenue.
C 83-151
On April 16, 1983, it was approved to lease Hangar 12, Row 13 at the Salt Lake International Airport to Robert E. McDonald, Individual and R. E. McDonald & Co. commencing April 1, 1983. C 83-152
On April 26, 1983, it was approved to lease Hangar 2, Row 13 at the Salt Lake International Airport to Ralph R. Barclay, Individual commencing April 1, 1983. C 83-153
On April 26, 1983, the contract with Lawrence Construction Company was approved for Project 19-A-106-23, Concourse “C” Minors Room at the Salt Lake International Airport. The amount of the project is $25,752. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-154
On April 26, 1983, an amendment to the agreement with Salt Lake County was approved amending the agreement of June 30, 1982 whereby the county agreed to pay certain expenses with regard to the processing and service of summonses, complaints and warrants for the Fifth Circuit Court. This agreement expired on December 31, 1982. The 1983 general legislation of the Utah legislature adopted House Bill No. 92, which provides for the Fifth Circuit Court to be administered by the state and for the state to assume the expenses therof. This bill will become effective July 1983. This amendment will extend the former agreement to July 1, 1983. C 83-155
On April 26, 1983, an agreement was approved with David Cutler to serve as a dog license solicitor. This will provide the city with additional license revenue and control the animal population without increasing the number of employees. Each independent contractor will conduct door-to-door campaigns to insure that all dogs have had a rabies vaccination and have a license. The fees from any licenses received through this process will be shared between the city and the contractor. C 83-156
On April 26, 1983, a revocable permit was approved for Richard N. Wabel for use of city property for the purpose of grazing livestock. This is a renewal of a previous permit and will be in force for three years with annual rental payments of $100 annually. C 83-157
On April 16, 1985, an amended agreement was approved with Eckhoff, Watson & Preator Engineering for the design of the Main Street Transit Improvements, Project No. 38-728. The fee for additional work is $20,212.43 to be paid 80% Urban Mass Transit Authority/20% Salt Lake City Redevelopment agency. C 83-158
On November 22, 1983, an amendment to the agreement with Eckhoff, Watson & Preator Engineering was approved for a study report for Main Street, North Temple to 400 South, Project No. 38-728. The work consists of printing the final report and revising the city’s exhibits. The fee is estimated to be $2,255.05. C 83-158
On November 8, 1983, an amendment to the agreement with Eckhoff, Watson and Preator Engineering was approved for the preparation of design plans and specifications for the Mass Transit Improvements on Main Street, North Temple to 400 South, Project No. 38-728. The work will be accomplished for a fee of $202,385 with 80% of the money coming from the Urban Mass Transit Authority and 20% from the Redevelopment Agency. C 83-158
On April 26, 1983, an agreement was approved with Eckhoff, Watson and Preator Engineering for the preparation of a preliminary design report for the city’s Central Business District Transit Improvement, Project No. 38-728, Main Street from North Temple to 400 South. The fee for this project will be $27,000 with 80% of the monies to come from the UMTA and 20% from the Redevelopment Agency. The City Engineering Office is authorized to issue a notice to proceed to the consultant. C 83-158
On June 21, 1983, a grant agreement was approved with the Federal Aviation Administration for the Airport Improvement Program, AIP Project No. 3-49-0033-03 at the Salt Lake International Airport. Federal funds of $2,983,533 have been obligated for construction of a portion of the Concourse “D” Apron paving, Project No. 19-A-152-1; and a portion of the Cargo Apron Expansion - South Support Area, Project No. 19-A-116-7. These projects will provide additional aircraft parking positions at the Salt Lake International Airport. The Airport Authority has the necessary matching funds for this construction. C 83-159
On May 3, 1983, an agreement was approved with Paul Monaham, Individual to lease Hangar 3, Row 9 at the Salt Lake International Airport commencing November 22, 1982. C 83-160
On May 3, 1983, an agreement was approved with Bob Chattin, Individual to lease Hangar 26, Row 12 at the Salt Lake International Airport commencing April 1, 1983. C 83-161
On May 3, 1983, an Urban Development Action Grant (UDAG) agreement was approved with the United States Department of Housing and Urban Development (BUD) for the Sugarhouse Office Building Development project. This project will be jointly funded between HUD and Clark Financial Corporation. C 83-162
On May 3, 1983, an agreement was approved with Milburn Payne to serve as a dog license solicitor. This will provide the city with additional license revenue and control the animal population without increasing the number of employees. Each independent contractor will conduct door-to-door campaigns to insure that all dogs have had a rabies vaccination and have a license. The fees from any licenses received through this process will be shared between the city and the contractor. C 83-163
On May 3, 1983, an agreement was approved with Van Ert Trane Service, Inc. for maintenance of chillers located in the airport terminal building at Salt Lake International Airport. This service will be provided for the annual sum of $3,380. C 83-164
On May 3, 1983, lease agreements were approved with Joseph M. Colledge and Ralph B. Burk to lease city owned property in Lehi, Utah, southeast of Camp Williams along the Jordan River. These are renewal leases and the amount has been set at $300 a year for each lessee in view of the fact that the property is subject to flooding from the Jordan River during a large portion of the year and the vegetation is not prime for grazing foliage. C 83-165
On May 3, 1983, an agreement was approved with Arthur Young & Company for preparation of an RFP and evaluation of proposals for the aquatics park to build adjacent to the existing Wave Pool. The amount the city is required to pay for this service will depend on the actual amount of work performed however, the total amount will not exceed $4,000 and will be paid by the Parks Department. C 83-166
On May 3, 1983, an agreement was approved with Jack H. Douglas for permission to make a 4-inch automatic sprinkler connection for his property located at 2065 East 3300 South. C 83-167
On May 3, 1983, an agreement was approved with Scott, Louie and Browning for the preparation of a development study for a central maintenance facility for Salt Lake City Corporation, Project No. 9-I-3. The fee for this work is $2,500 with monies to come from the Fleet Management budget. The City Engineer’s Office is authorized to issue a notice to proceed to the consultant. C 83-168
On July 29, 1983, a three party agreement was approved with the Utah Department of Transportation UDOT and Oregon Shortline Railroad Company and its leasee Union Pacific Railroad Company for the Railroad Crossing Improvements on 1300 South and ZOO West, RRP-RRS 1042(1). These improvements will include track repair and resurfacing, railroad crossing signalization and gates and reconstruction of the portion of the 1300 South conduit under the tracks. The total cost estimate of $236,580 will be funded under the Federal Highway Administration’s Railroad Safety Program with the required ten percent matching funds of $23,658 to cone from the city. These funds will come from funds established for the 1300 South Road Reconstruction Project, No. 38-681. A portion of this cost, which includes the installation of 52 feet of 6x10 storm drainage conduit at a cost of $16,224 will be reimbursed back to the city for reimbursement to our contractor for this project. C 83-169
On May 3, 1983, a Cooperative Agreement was approved with the Utah Department of Transportation for Railroad Crossing Improvements at 200 West and 1300 South. This agreement allows for the improvement of the Union Pacific Railroad track at this location to include reconstruction of and improvement of the track crossing of 1300 South, flashing lights, gates and funding in the amount of $16,224 to come back to the city for reimbursement of that portion of the 1300 South storm drainage conduit being constructed under the tracks. This conduit is currently being reconstructed as part of City Project No. 38-681, 1300 South Improvement. The total cost of this project is estimated to be $242,580 with the city to pay 10% or $24,258.
C 83-169
On May 3, 1983, an agreement was approved with Prescott Muir for the preparation of design plans and specifications for reroofing the Public Utilities Shop and Fire Station No. 1, Project No. 17-C-6. Monies for the work will come from the Fire Department and Public Utilities Department budgets with $1,560 coming from Public Utilities and $2,272 from the Fire Department for a total of $3,832. C 83-170
On June 21, 1983, a License Agreement for Installation and Maintenance of Gauging Stations was approved with Salt Lake County whereby the county agrees to install, maintain and use 20 gauging stations located upon city property. This agreement was made possible by Resolution 50 of 1983. C 83-171
On May 19, 1983, an agreement was approved with Reagan Outdoor Sign Company for using billboard-outdoor advertising as one of the mediums to increase awareness of the Wild Wave pool. C 83-172
On May 10, 1983, an agreement was approved with James L. Delamare, individual, to lease Shade Hangar 10, Row 14 at the Salt Lake International Airport, commencing May 1, 1983. C 83-173
On May 10, 1983, an agreement was approved with Leonard Korenko, individual, to lease Shade Hangar 12, Row 11 at the Salt Lake International Airport commencing April 1, 1983. C 83-174
On May 10, 1983, an agreement was approved with Charles Weisman, individual, to lease Hangar 19, Row 14 at the Salt Lake International Airport commencing April 1, 1983. C 83-175
On May 10, 1983, an agreement was approved with Larry G. Trythall, individual, to lease Shade Hangar 10, Row 13 at the Salt Lake International Airport commencing May 1, 1983. C 83-176
On May 10, 1983, an agreement was approved with C. G. Latham for lease of Shade Hangar 8, Row 13 at the Salt Lake International Airport commencing May 1, 1983. C 83-177
On May 10 1983, a revocable permit was approved for William R. Fullem II, for use of a narrow strip of land on the Jordan and Salt Lake Canal property at 8732 South State in Sandy. The permittee is desirous of using this for the purpose of providing parking space for his Arctic Circle Drive-Inn, fee for use of this property will be $100 annually. C 83-178
On May 3, 1983, an engineer consulting contract was approved with Eckhoff, Watson and Preator Engineering to study alternate watering systems for the city’s six municipal golf courses. The cost for these services will not exceed $4,830.50. This study should be beneficial in saving the city money in one of the largest expenses incurred to operate the golf courses. C 83-179
On May 10, 198, the contract with Ivell Construction was approved for the Central City Community Center Alterations, Project No. 3-6. The base bid plus Alternates No. 1 and 2 will be awarded. The cost for this project will be $38,684. The city engineer’s office is authorized to issue a notice to proceed to the contractor. C 83-180
On May 10, 1983, the contract with Staker Paving was approved for the construction of Street Improvements in the Peoples’ Freeway Area, Phase II, Project No. 38-717. The base bid plus Alternate “A” was awarded in the amount of $295,948.90. The city engineer’s office is authorized to issue a notice to proceed to the contractor. C 83-181
On May 10, 1983, an agreement was approved with James L. Waymon to serve as a dog license solicitor. This will provide the city with additional license revenue and control the animal population without increasing the number of employees. Each independent contractor will conduct door-to-door campaigns to insure that all dogs have had a rabies vaccination and have a license. The fees from any licenses received through this process will be shared between the city and the contractor. C 83-182
On May 20, 1983, letters of agreement were approved between the city and Continental Airlines, American Airlines, Western Airlines, Republic Airlines, Frontier Airlines, United Airlines, Delta Air Lines and Pacific Southwest Airlines relating to new cost and revenue centers. C 83-183
On December 20, 1983, an agreement was approved with Olco Corporation providing for the installation of Watermain Ext. 35-4106 and Sanitary Sewer Ext. 50-1218 in Parkway Subdivision #3 whereby Olco agrees to install the water and sewer mains as per plans approved by the Department of Public Utilities. C 83-184
On May 17, 1983, the plans were approved for Watermain Extension 35-4106. C 83-184
On May 17, 1983, an agreement was approved with Salt Lake County for reconstruction of the 1300 South storm drain conduit. This allows for the reconstruction of the existing deteriorated conduit from State Street to 400 West. Funding allocated by this agreement is $1,660,000 and will come from the Salt Lake County Flood Control “county-wide” funds. The conduit is currently being constructed as part of the city’s Project No. 38-681, 1300 South Improvements. C 83-185
On May 17, 1983, a cooperative agreement was approved with the Utah Department of Transportation (UDOT) for design of West Valley Highway Overpass Structure at 700 South, Project No. M-10005(3). This agreement allows for design to be accomplished by UDOT forces. The project is being constructed using Federal-Aid Secondary and Federal-Aid Urban System funds with construction scheduled from 1983 to 1986. The city’s portion of the estimated $13,500 design cost is $1,079.
C 83-186
On May 26, 1983 an interlocal agreement was approved between Salt Lake County, Tooele County and Salt Lake City Corporation relating to the Job Training Partnership Act (JTPA). Authorized by Resolution 51 of 1983. C 83-187
On June 3, 1983, an agreement was approved with AAA Demolition & Excavation for the demolition of three abandoned structures located at the Salt Lake International Airport at a cost of $10,800.
C 83-188
On May 24, 1983, an agreement was approved leasing Hangar 23, Row 15 at the Salt Lake International Airport to Ira Kay Greer commencing December 9, 1982. C 83-189
On May 24, 1983, an agreement was approved leasing Hangar 6, Row 9 at the Salt lake International Airport to Max Bangerter and Mobile Telephone, Inc. commencing February 1, 1983. C 83-190
On May 24, 1983, an agreement was approved leasing Shade Hangar 21, Row 14 at the Salt Lake International Airport to Earl Pace and Pace Properties commencing May 1, 1983. C 83-191
On May 24, 1983, an agreement was approved leasing Shade Hangar 18, Row 11 at the Salt Lake International Airport to Clinton Day and Information Now, Inc. commencing May 1, 1983. C 83-192
On May 24, 1983, an agreement was approved leasing Shade Hangar 15, Row 12 at the Salt Lake International Airport to Robert C. Young commencing May 1, 1983. C 83-193
On May 24, 1983, an agreement was approved leasing Shade Hanger 21, Row 13 at the Salt Lake International Airport to Wendell Winegar commencing October 1, 1981. C 83-194
On August 11, 1983, an amended agreement was approved with the State of Utah for processing water bills. The original agreement was not accepted by the State Attorney General’s office as it was not legal for a state officer to agree to indemnify and hold the city harmless. C 83-195
On May 23, 1983, an agreement was approved with the State of Utah to print, cut and perforate water bills for the Department of Public Utilities at a rate of $.025 per processed bill. C 83-195
On May 24, 1983, a consulting contract was approved with Mr. Bill Lemmon to provide consulting services in the areas of park maintenance, park planning and resource utilization. Bill has recently retired from the city after 32 years of service in the Parks Department and during his years with the city, amassed a great deal of knowledge and experience of the parks system. C 83-196
On May 24, 1983, contracts were approved with Bob Wood and Paul Cummings to provide services as consultants for the Salt Lake City Memorial Day Classic Road Race. Their services include obtaining sponsors, prize money and arranging for world class runners to participate. They also are responsible for setting up the VIP Spaghetti Banquet May 28 where press and sponsors could meet the world class runners. C 83-197
On May 24, 1983, Special County contract No. 807, Watermain Extension No. 33-C-1211 was approved with Administrative Services, Inc. for “Daneborg Estates” located southwest of 7800 South and Wasatch Boulevard. The work was done under the program for the extension of watermains beyond the city limits. C 83-198
On May 24, 1983, an agreement was approved with Administrative Services, Inc. for Watermain Extension No. 33-C-1211 to serve “Daneborg Estates” located southwest of 7800 South and Wasatch Boulevard. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-198
On May 24, 1983, a Professional Contractual Agreement was approved with the Utah Department of Transportation (UDOT), Materials and Research Division enabling the city to obtain from UDOT the equipment to perform certain construction materials tests. C 83-199
On May 31, 1983, an agreement was approved with Anthony L. Camberlango and Tri-Cam Corporation leasing Hangar 19, Row 8 commencing April 11, 1983. C 83-200
On Nay 31, 1983, an agreement was approved with Dr. Wallace Graham leasing Hangar 4 Row 15 at the Salt Lake International Airport commencing June 1, 1983. C 83-201
On May 31, 1983, an agreement was approved with Model Linen, Inc. to provide linen service and supplies to all Salt Lake City fire stations. The period of this agreement will be for three years commencing June 1, 1983 an ending May 30, 1986. C 83-202
On May 31, 1983, an agreement was approved with Capitol Industries, Inc. to make a 6-inch automatic sprinkler connection for their property located at 2050 North Redwood Road. C 83-203
On May 31, 1983, an agreement was approved with the Salt Lake International Center to make a 6-inch automatic sprinkler connection for the Admiral Byrd Plaza located at 400 North Eddie Rickenbacker Drive. C 83-204
On May 15, 1983, Special County Contract No. 832, Watermain Extension 33-C-1060 was approved with John T. Alexander and Sherman D. Harmer, Jr. for “Willowcreek Ranchettes” 2295 East Creek Road. C 83-204
On May 31, 1983, an agreement was approved with Pacific Western Industries, Inc. providing for the relocation and installation of Watermain Ext. 35-3974 located on the northeast corner of Kennedy Drive and Donner Way, 900 South 3100 East. Pacific Western agrees to install the watermain as per plans approved by the Department of Public Utilities. C 83-205
On May 31, 1983, an agreement was approved with Dames & Moore Consulting Engineers for soils testing and report preparation for the City & County Building, Project No. 15-25. The fee for these services will be $9,975 with monies coming from the City & County Building Restoration fund. C 83-206
on June 7, 1983, the contract with Stephen L. Cornwall Company was approved for the Western Airlines Bag Cart Storage and Nail Sort Facility at the Salt Lake International Airport, Project No. 19-A-106-22. The base bid was awarded in the amount of $75,410. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-207
On May 31, 1983, the contract was approved with The Howard P. Foley Company for the installation of a Power Conditioning System at the Data Processing Offices, Project No. 11-C-3. The base bid was awarded at a cost of $182,498. The city engineer’s office is authorized to issue a notice to proceed to the contractor. C 83-208
On May 31, 1983, the contract was approved with Robert Williams Engineering for the Special Improvement District Concrete Replacement, Project No. 40-R-5. Schedules A, B and C in the amount of $594,796.95 were awarded. The city engineer’s office is authorized to issue a notice to proceed to the contractor. C 83-209
On June 7, 1983, an agreement was approved with International Engineering Company, Inc. for preparation of the Annual Renewal and Replacement Funding Report for the period from July 1, 1983 to June 30, 1984 for the Salt Lake International Airport and Airport II. This report will include all pavements, “T” Hangars, Shade Hangars, F.A.A. Office Building, Joint Cargo Building, Kibbie Executive Terminal, Terminal Unit No. 1, Terminal Unit No. 2, Connector Building, Boiler Building, Maintenance Shop and airfield lighting at the International Airport and all pavements, FBO Hangar, “T” and Shade Hangars and airfield lighting at Airport No. 2. Cost for these services is $6,000. C 83-210
On June 7, 1983, Amendment No. 3 was approved to the agreement with Key Airlines, Inc. to provide power to the general aviation ramp lighting system on the east side of the airport. This agreement was originally with Johns Manville Sales Corporation and was assigned to Key Airlines on May 6, 1980. C 83-211
On June 7, 1983, Amendment No. 1 was approved to the agreement with Key Airlines, Inc., one of the four fixed base operators (FBO’s) at the Salt Lake International Airport, to provide power to the general aviation ramp lighting system on the east side of the airport. This agreement was originally with Trans West Air Service, Inc., and assigned to Key on July 30, 1981. C 83-211
On June 7, 1983, an agreement and a disclaimer were approved with Mr. and Mrs. Dene Kessler relinquishing a portion of the city’s interest in the old big cottonwood conduit located near 6200 South and Wasatch Boulevard. The Kessler’s had requested that the city convey its interest in this conduit right of way so that title can be cleared on property that they own and have an interest in developing. C 83-212
BEECH HOLDINGS, INC.
Amendment No. 5 in the amount of $128,500.00 with Beech Holdings for certain improvements being performed by the Airport on Beech Holdings leased premises. Beech Holdings will reimburse the Airport for this work with 10% interest per year over a 15 year period. C 83-213
On June 7, 1983, Amendment No. 4 was approved to the agreement with Beech Holdings, Inc. to provide power to the general aviation ramp lighting system on the east side of the airport. C 83-213
On June 7, 1983, Amendment No. 1 was approved to the agreement with Executive Air Services, Inc. to provide power to the general aviation ramp lighting system on the east side of the airport. C 83-214
On June 7, 1983, Amendment No. 1 was approved to the agreement with Interwest Aviation, Inc. to provide power to the general aviation ramp lighting system on the east side of the airport. C 83-215
On June 7, 1983, agreements were approved with Filia Uipi and Mark Ward to be hired as law clerks in the attorney’s offices. They will be paid on a straight-time hourly basis with no fringe benefits and will be working full time during the summer months and probably part-time service when school resumes in the fall. C 83-216
On June 7, 1983, an agreement was approved with William L. Smith for existing Watermain Extension No. 35-564 to serve the property located at 480 Wall Street. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this property over and above the normal expenditure for the extension.
C 83-217
On June 7, 1983, an agreement was approved with Verner and Dona R. Zinik wherein they have assigned all of their rights in Lower Mill Creek Irrigation Company to Salt Lake City Corporation and have agreed that the city repair said service line at its cost as consideration for the transfer of all stock, rights and certificate. This agreement also specifies that they receive water from the city under the Special County contract. C 83-218
On June 7, 1983, an agreement was approved with Wayne L. Clawson for existing Watermain Extension No. 33-C-996 to serve his property located at about 4545 South Abinadi Road. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this property over and above the normal expenditure for the extension. C 83-219
On June 17, 1983, the contract with Hajco Construction, Inc. was approved for the Concourse “D” Surcharge Removal at the Salt Lake International Airport, Project No. 19-A-160-2. The base bid was awarded in the amount of $39,148. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-220
On June 17, 1983, the contract with Valley Design & Construction was approved for the Interim Bus Plaza at the Salt Lake City International Airport, Project No. 19-A-109-11. The base bid was awarded in the amount of $71,355.50. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-221
On June 21, 1983, an agreement was approved with the Redevelopment Agency of Salt Lake City for 1982-83 (8th year) Community Development Block Grant (CDBG) funds. This delineates the Redevelopment Agency’s responsibilities relating to the implementation of their Rehabilitation Program and other CDBG projects. C 83-222
On June 21, 1983, an agreement was approved with the Neighborhood Housing Services Inc. (NHS) for 1982-83 (8th year) Community Development Block Grant (CDBG) funds. This provides $70,000 for NHS program operations and $10,000 for Solar Demonstration grants, as approved by the City Council. C 83-223
On October 4, 1983, Amendment No. 1 to the agreement between Dean L. Gustavson Associates, The Ehrenkrantz Group, Inc. and Salt Lake County was approved for the City and County Building Restoration study. This will allow the city to serve as the primary contracting agent in the restoration study. The city will pay all fees to the consultant and will then be reimbursed 50% of the fee by the county.
C 83-224
On June 21, 1983, an agreement was approved between the city, Salt Lake County and Dean L. Gustavson & Associates and The Ehrenkrantz Group, Inc. to provide architectural services in the stud3rof the City & County Building Restoration, Project No. 15-25. The fee for rendering these services shall be $206,000. C 83-224
On June 21, 1983, an agreement was approved with the Utah Department of Transportation (UDOT) for Project I-215-9(65)22, I-215 Structure over North Temple and 700 North, Salt Lake County Authority No. 5223. The construction at the site necessitates relocating the Fire Department’s overhead fire alarm system serving the Salt Lake International Airport. C 83-225
On June 21, 1983, a water supply permit and agreement was approved with Dan W. Clark, 3774 Little Cottonwood Creek Road to receive water located within the area covered by the South Despain Little Cottonwood Creek Decree of 1910, Case No. 4082. C 83-226
On June 21, 1983, an agreement was approved with Ted L. Greenwood, 1217 LaVon Circle wherein Mr. Greenwood agrees to pay for repairs by the city to a leak in his service line. C 83-227
On June 21, 1983, an agreement was approved with Contour Corporation for Watermain Ext. No. 33-C-717 to serve Tanner Lane PUD located at 1808 East 6425 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-228
On June 21, 1983, the contract with Workman Construction was approved for the street improvements on Harvard Avenue, 200 East to State Street, Project No. 38-730 in the amount of $39,475.50. The Office of the City Engineer is authorized to issue a notice to proceed to the contractor. C 83-229
On June 29, 1983, a standard form agreement was approved with Heath Engineering Company for waiver of public way improvements installation at 377 West 800 North. C 83-230
On June 29, 1983, a standard form agreement was approved with Clark Silver for waiver of public way improvements installation at 920 Duluth Avenue. C 83-231
On June 29, 1983, a standard form agreement was approved with Thatcher Chemical Company for waiver of public way improvements installation at 1265 Wallace Road. C 83-232
On June 16, 1983, an agreement addendum was approved with Commercial Security Bank retaining additional services for the purpose of utilizing CSB’s automated payment system to process water payments. C 83-233
On June 29, 1983, an agreement was approved with S. F. Trunzo Auctioneers, Inc. to provide auctioneer services for the city for the sum of 6% of the gross sales as full compensation for their services.
C 83-234
On June 29, 1983, an agreement was approved with Associated Behavior Consultants, Inc. making available independent, professional counseling, psychotherapy, psychological assessment and related training and consultation for personnel employed by the Police Department effective July 1, 1983 to June 30, 1984. C 83-235
On June 29, 1983, a service agreement was approved with Glen Allen to provide personnel services to the Police Department effective July 1, 1983 through June 30, 1984. C 83-236
On June 29, 1983, a water supply agreement was approved with Walter J. Plumb III to provide water for a project located at Maxfield Lodge in Big Cottonwood Canyon. The water to this development is from a prior-approved spring. C 83-237
On September 20, 1983, the contract with Terra-Firma, Inc. was approved for the watermain extension from Neffs Canyon Reservoir to White Reservoir, Project No. 33-C-1261. The total amount of this contract is $71,779.72. C 83-238
On July 29, 1983, an easement for pipelines was approved for Salt Lake County for Watermain Ext. No. 33C-1261, a 12-inch watermain to be constructed between White Reservoir and Neff’s Canyon Reservoir, 4200 East 4300 South to 4400 South 4480 East, a distance of 1,494 feet. C 83-238
On July 1, 1983, the cover sheet mylar was approved for Watermain Ext. 33-C-1261, Neff’s Canyon Reservoir to White Reservoir. C 83-238
On September 20, 1983, the contract with The Tempest Company was approved for the watermain extension on 400 West; 500 North to North Temple, east to 300 West, Project No. 35-4185. The total amount of this contract is $196,464.35. C 83-239
On July 29, 1983, an agreement was approved with the Utah State Department of Transportation UDOT for the installation of Watermain Ext. No. 35-4185, 400 West 500 North to North Temple, east on North Temple to 300 West. C 83-239
On July 1, 1983, the cover sheet mylar was approved for Watermain Ext. 35-4185, 400 West. C 83-239
On June 29, 1983, an agreement was approved with Gordon O’Neil requesting to make a 4-inch automatic sprinkler connection for his property at 581 East 2100 South. C 83-240
On June 29, 1983, an agreement was approved with Gary L. Eckman requesting to make a 6-inch automatic sprinkler connection for his property at 1980 South 4490 West. C 83-241
On June 29, 1983, the contract with Philipoom Construction was approved for the Fleet Management Standby Power Generator, Project No. 1-N-l8. The base bid plus Alternate #1 was awarded for the sum of $26,689. The Office of the City Engineer is authorized to issue a notice to proceed to the contractor. C 83-242
On June 29, 1983, the contract with Fire Engineering Company, Inc. was approved for the Traffic Sign Shop Fire Protection Sprinkler System, Project No. 1-N-17 in the amount of $8,070. The Office of the City Engineer is authorized to issue a notice to proceed to the contractor. C 83-243
On July 8, 1983, a lease agreement was approved with the United States Department of Commerce leasing Building No. 1304 at the Salt Lake International Airport by the National Weather Service from July 1, 1983 through June 30, 1984. The lease will be automatically renewed from year to year until 1988. Rental is in the amount of $288 per year, in arrears. C 83-244
On July 5, 1983, the contract with Geneva Rock Products was approved for the Parking Lot Rehabilitation at the Salt Lake International Airport, Project No. 19-A-124-4. The amount of the contract is $524,550. C 83-245
On July 8, 1983, an agreement was approved with David Silfvast to lease Shade Hangar 12, Row 12 at the Salt Lake International Airport commencing July 1, 1983. C 83-246
On July 5, 1983, an approval of assignment of concession agreement was approved with Pearson Enterprises and Jenhanco both doing business as Dollar Rent-A-Car. This will allow Pearson to assign their franchise to Jenhanco, owned by Mr. Norman Jenkins of Las Vegas, Nevada. C 83-247
On September 27, 1983, the Salt Palace Expansion Agreement, the Agreement Regarding Restrictive Covenant and Right of First Refusal and a Revocable Permit were approved with Salt Lake County. These agreements are in connection with the Salt Palace expansion and were made possible by the passing of Bills No. 87 of 1981 and No. 49 of 1982. C 83-248
On July 8, 1983, a street agreement was approved with Salt Lake County for work in and use of the public way for 200 West from South Temple to 200 South in regards to the Salt Palace Extension. This agreement deals not only with the construction of the overpass but with continued obligations of maintenance, indemnification, etc.
C 83-248
On July 5, 1983, an agreement was approved with Larry V. Spendlove for part-time work as an Assistant City Prosecutor commencing July 1, 1983. C 83-249
On July 8, 1983, an agreement was approved with Walter Schmidt and Schmidt Sign Service for the purchase of property near 1235 South 300 West needed for the 1300 South Improvement Project. The city will pay $73,000 for a portion of the property. C 83-250
On July 8, 1983, an indemnity agreement was approved for Swedin Tree Experts to recover a cashier’s check which was lost by the Purchasing Department. The check, No. 48486 in the amount of $3,500, was given to the city as bid security on Bid No. 415. C 83-251
On July 8, 1983, an agreement was approved with Browning Ferris Industries for refuse pick-up service to the Wild Wave Pool and Bonneville, Forest Dale, Glendale, Nibley and Rose Park Golf Courses. C 83-252
On July 5, 1983, a lease agreement was approved with the Roman Catholic Bishop of Salt Lake City wherein the city will lease the premises known as Bishop Glass School, located at 340 Goshen Street. This will serve as the West Patrol and Traffic Division of the Police Department. The lease will be for a period of two years commencing June 2, 1983. The rental rate will be $4,680 per month with the additional payment of all utility and janitorial services. C 83-253
On July 8, 1983, an agreement was approved with Gary Howlett Construction existing Watermain Ext. 35-3912 to serve the property located at 1485 West Van Buren Avenue and Glen Aire Subdivision, Lots 1 through 6. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this property over and above the normal expenditure for the extension. C 83-254
On July 5, 1983, an agreement was approved with the Salt Lake International Center granting them permission to make a 6-inch detector check valve connection Admiral Byrd Plaza located at 400 North Eddie Rickenbacker Drive. C 83-255
On July 8, 1983, an agreement was approved with Salt Lake County for surfacing a part of the West Valley Highway, UDOT Project No. RS-O162(7); M-1005(1). The portion to be surfaced is the northbound lanes on 4000 West from 900 South to 1820 South. The city’s share of the estimated cost will be $35,084. C 83-256
On July 11, 1983, an agreement was approved with Jeffery D. Newell to provide zoning investigation services to the city on an interim basis. This agreement shall be in effect from July 1, 1983 through December 31, 1983. Compensation will be $5.62 per hour not to exceed $1,000 per month. C 83-257
On July 11, 1983, an agreement was approved with D. W. Pearson to assist the Police Department in the area of Risk Management and to assist in the follow-up of workman’s compensation and long term disability claims. This agreement shall be in effect from July 1, 1983 through June 30, 1984. Compensation will be paid at $9 per hour not to exceed $720 per month. C 83-258
On July 11, 1983, an agreement was approved with Sergeant Max Yospe to provide the continuing operation of the Police Chaplain Corps after his retirement. This agreement shall be effective from July 1, 1983 through June 30, 1984. Compensation will be $17 per hour not to exceed $1,360 per month. C 83-259
On July 19, 1983, a plat, contract, Indemnification Agreement and Trail Agreement was approved for the Carrigan Cove Subdivision.
C 83-260
On July 26, 1983, the contract with Kiewit Western Company was approved for the Cargo Apron Expansion, South Support Area at the Salt Lake International Airport, Project No. 19-A-116-7, AIP No. 3-49-0033-03. The base bid was awarded in the amount of $1,183,556. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-261
On July 26, 1983, the contract with Jacobsen-Robbins Construction Company was approved for the Concourse D and Connector at the Salt Lake International Airport, Project No. 19-A-160. The base bid plus alternate No. 1 was awarded in the amount of $6,023,069. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-262
On July 19, 1983, the contract with F. S. Armitage Sons, Inc. was approved for the Kibbie Executive Terminal Exterior Finish at the Salt Lake International Airport, Project No. 19-A-110-9. The base bid was awarded in the amount of $24,537. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-263
On July 19, 1983, a lease agreement was approved with Ron Riggs leasing Shade Hangar 16, Row 12 at the Salt Lake International Airport commencing July, 1983. C 83-264
On July 19, 1983, a lease agreement was approved with Keith Steele leasing Shade Hangar 13, Row 14 at the Salt lake International Airport commencing July 1, 1983. C 83-265
On July 19, 1983, an agreement was approved with Thatcher Chemical Company to supply the chlorine needs of the Metropolitan Water District, Salt Lake City Water and Sewer Treatment Plant. C 83-266
On July 18, 1983, an agreement was approved between the city and Weber State College to provide training for fifteen to eighteen officers for a one week period to be conducted at the college. The program is for training Field Officers in the collection and preservation of physical evidence at crime scenes and is the first step in the realignment of our Crime Lab into a Scene of Crime Officer program. The program commences August 22, 1983 at a cost of $2,100. C 83-267
On July 19, 1983, an agreement was approved with Delta Geotechnical Consultants, Inc. to provide a study at the site of the landslide near Donner Way and Emigration Canyon. The cost of this study will not exceed $3,500. C 83-268
On December 6, 1983, the contract with Superior Construction Co. was approved for Replacement of 8-inch Sewer Main and 12-inch Storm Drain, Donner Way to Emigration Canyon Road, Project No. 50-1239. The cost for construction will be $81,632. C 83-269
On September 15, 1983, plans were approved for the proposed Sewer and Storm Drain Ext. No. 50-1239, Donner Way to Emigration Canyon.
C 83-269
On July 18, 1983, an agreement was approved with William R. Barton providing for the installation of the watermain at 1456 to 76 Pacific Avenue whereby Mr. Barton agrees to install the watermain as per plans approved by the Department of Public Utilities. C 83-270
On July 19, 1983, the contract with Larry Dean Construction Co. was approved for the Restoration of Exterior Steps at the Metropolitan Hall of Justice Building, Project No. 13-CA-23. The contract is in the amount of $16,398.64 which will be paid jointly by the city and Salt Lake County. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-271
On July 19, 1983, the contract with Baumann Corporation was approved for the Beldon/Stanton parking Lots, Project No. 41-J-9. The contract is in the amount of $24,234.50. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-272
On July 19, 1983, the contract with Geneva Rock Products was approved for street improvements on 600 East, South Temple to 900 South, Project No. 36-405. The base bid plus Schedule “D” was awarded in the amount of $224,346.75. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-273
On July 19, 1983, the contract with Ralph L. Wadsworth Construction Company was approved for the improvements at Faultline Gardens, Project No. 19-Y-56. The amount of the contract is $102,711.32. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-274
On July 19, 1983, the contract with Ralph L. Wadsworth Construction Company was approved for the improvements at Glendale Park, Project No. 19-Y-83 at a cost of $85,232. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-275
On July 19, 1983, an agreement was approved with the Utah Department of Transportation for the purchase of electronic traffic counters to replace the obsolete equipment now being used and is essential for the continued monitoring of traffic flow in the city. The Federal Highway Administration (FHWA) will pay 75% of the cost of $7000 and the city will pay 25%. C 83-276
On October 4, 1983, Petition 400-102 was approved granting an encroachment at 255 South West Temple to facilitate the opening of the Salt Lake Sheraton Hotel. A revocable permit was issued to Venture 58 to accomplish the encroachment. Petition 400-102 of 1983 was submitted by Dee Christiansen & Venture 58. C 83-277
On August 2, 1983, a revocable permit was approved with Venture 58 for construction of civil, mechanical and electrical facilities in the public way to service private property at 255 South West Temple. C 83-277
On August 9, 1983, Petition 1000-165 requesting permission to film a commercial on August 11, 1983 in the area from the capitol to North Temple from 10:00 A.M. to 12 noon has been approved provided insurance was received by the city. Arrangements for police protection will be made by the Traffic Safety Division and upon conclusion of the filming their wages will be paid by the petitioner. (Virginia Timmons, TeleScene, Inc.) C 83-278
On August 9, 1983, Petition 1000-163 requesting permission to film a commercial on Wednesday, August 10, 1983 on the sidewalk area between the Promised*Valley Playhouse and Jeannie’s Smoke Shop (between 1st and 2nd South, State Street) from 6:00 P.M. to 6:00 A.M. was approved provided the filming take place on the sidewalk so as not to interfere with vehicular traffic and insurance is filed with the city. (Tom Lefler, Utah Film Development). C 83-279
On August 30, 1983, the contract with Kasler Corporation was approved for the Concourse D connecting Taxiway at the Salt Lake International Airport, Project No. 19-A-152-2. The base bid and Alternates No. 1 and 2 were awarded for a total of $2,676,545. The Airport Authority is authorized to issue a notice to proceed to the contractor.
C 83-280
MONTGOMERY ELEVATOR COMPANY
Amended service agreement with Montgomery Elevator to provide maintenance for the power walks at the Salt Lake International Airport in the connector building between “C” and “D” Concourses. The monthly service charge will be $1,880.00 through June 30, 1986.
C 83-281
On July 29, 1983, a lease agreement was approved with Leonard Wojcik leasing Shade Hangar 20, Row 2 at the Salt Lake International Airport commencing July 21, 1983. C 83-282
On July 29, 1983, an agreement was approved with Hooper Knowlton, III, and The Knowlton Group leasing Shade Hangar 3, Row 12 at the Salt Lake International Airport commencing April 1, 1983. C 83-283
On July 29, 1983, an agreement was approved with Jerry Wood and W & K Flying Club, Inc. leasing Shade Hangar 17, Row 13 at the Salt Lake International Airport commencing July 1, 1983. C 83-284
On July 29, 1983, an agreement was approved with Arthur G. Cudworth, III to retain his services on a part-time basis as a consultant in the areas of golf course maintenance and planning for a fee of $20 per hour. C 83-285
On July 29, 1983, an agreement was approved with Dr. William H. Brown to provide independent professional counseling, psychotherapy, psychological assessment and related training and consultation for personnel in the Police Department. This agreement shall be in effect for one year commencing July 1, 1983. C 83-286
On July 29, 1983, a lease agreement was approved with Crossroads Plaza Associates and Kravco, Inc. to lease space in the Crossroads Plaza Shopping Mall for a small police substation for the foot patrol officers assigned in the Central Business District. This lease shall be on a month to month basis and is cost free. C 83-287
On July 29, 1983 an Equipment Lease was approved with Eimco Process Equipment Company for the lease of a Biological Airated Filter BAF Pilot Plant for a minimum term of three months at a no charge rental fee. The BAF Pilot Plant is a new concept in sewage treatment and nitrification testing of sewage. C 83-288
On July 29, 1983, an agreement was approved with Joseph R. Anderson, Acting Director of Public Works to make a 6-inch automatic sprinkler connection for the Traffic Sign Shop at 850 South 300 West. C 83-289
On July 29, 1983, an agreement was approved with the Utah Department of Transportation UDOT for relocating the water facilities on NI-215-9(4)297, Salt Lake County and NI-215-9(50)7, Salt Lake County, 2000 East to 4500 South (Knudson Corner). C 83-290
On July 29, 1983, an agreement was approved with the Utah Department of Transportation UDOT for protecting the city’s water facilities on RRP-RRS-000S(31), Salt Lake County, Authority No. 4680, 1700 South 1500 West. C 83-291
On July 29, 1983, an agreement was approved with Olympus Heights Associated for Watermain Ext. No. 25-KR-1-#149 to serve Spring Hollow No. 2 Subdivision at approximately 3755 South 2700 East. This agreement covers special pumping, reservoirs and or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-292
On August 4, 1983, a Community Development Block Grant (CDBG) sub-grantee agreement was approved for Utahns Against Hunger (UAH) granting (UAH) up to $15,000 for the administration of their food assistance programs through September of 1983. C 83-293
JOBS BILL PROGRAM, ROUSING AND URBAN DEVELOPMENT, HUD
Certificate of Completion for Jobs Bill Program, Project No. B-53-MJ-49-0004. C 83-294
On July 29, 1983, the contract with Workman Construction was approved for the Capitol Hills, Phase III Street Improvements, 900 West, 500 to 600 North, Project No. 38-726. Schedules A and B were awarded in the amount of $283,686.35. The Office of the City Engineer is authorized to issue a notice to proceed to the contractor. C 83-295
On June 5, 1984, an amendment in the amount of $4,800.00 was approved to the contract with Caldwell, Richards & Sorenson Inc. for performance of Survey Services, Project No. 5-4. C 83-296
On July 29, 1983, an agreement was approved with Caldwell, Richards and Sorensen for the performance of survey work associated with city street and storm drain projects for the 1983/84 fiscal year. The work to be performed will provide survey data to the design engineers and will not exceed an amount of $61,000. The Office of the City Engineer is authorized to issue a notice to proceed to the consultant.
C 83-296
On August 2, 1983, two revocable permits were approved with Melvin R. and Thora H. Lowe and Thorvald Therkildsen for purposes of fencing and landscaping portions of the Jordan and Salt Lake Canal property. C 83-297
On August 30, 1983, the contract with Superior Roofing Company, Inc. was approved for the Concourse B Roof Repair (Dogleg) at the Salt Lake International Airport, Project No. 19-A-86-24. The alternate bid was awarded in the amount of $69,857. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-298
On July 23, 1984, an amendment to the agreement with Salt Lake County was approved for installation of air conditioning at the Fairmont Park Senior Citizens Center. C 83-299
On August 2, 1983, a lease agreement was approved with Salt Lake County for the Fairmont Park Senior Citizens Center. This shall be for a period of ten years and shall expire December 31, 1992.
C 83-299
On August 2, 1983, an agreement was approved with the President of the Church of Jesus Christ of Latter Day Saints for existing Watermain Ext. SC 25-KR-1-#46 to service the property located at 4032 South 2300 East. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this property over and above the normal expenditure for the extension.
C 83-300
On July 29, 1983, an agreement was approved with The Carrigan Group providing for the installation of the watermain and sewer mains within the Carrigan Cove Subdivision whereby they agree to install the watermains and sewer mains as per plans approved by the Department of Public Utilities. C 83-301
CH2M HILL, WASTEWATER RECLAMATION PLANT, 1850 NORTH, REDWOOD ROAD
Amended agreement: with CH2M Hill, in the amount of $15,000.00, for upgrading and expansion of the existing wastewater reclamation plant at 1850 North Redwood Road. This is for design changes and remodeling. C 83-302
On August 5, 1983, an Engineer Consulting Contract was approved with CH2M Hill Consulting Engineers for the upgrading and expansion of the existing wastewater reclamation plant located at 1850 North Redwood Road. C 83-302
On August 2, 1983, an agreement was approved with Arthur Young and Company to evaluate the feasibility of the private sector involvement in financing sludge management, energy recovery and a new waste water treatment plant in the northwest quadrant of the city by a privatization analysis study. C 83-303
On August 2, 1983, an agreement was approved with the Utah State Department of Transportation (UDOT) for the installation of Watermain Ext. No. 4229, Victory Road west of Victory Road Reservoir. C 83-304
On August 25, 1983, plans and specifications were approved for the Water Reclamation Plant Near-Term Improvements Digester Cover, Project No. 49-Q-5-31. C 83-305
On June 27, 1984, Amendment No. 2 was approved in the amount of $11,000.00 to the contract with Anton J. Rasmussen. This amendment is due to refinement of the size and locations of Mr. Rasmussen’s paintings at the Salt Lake City International Airport and for one final painting of the Salt Lake Valley. C 83-306
On August 11, 1983, an amendment to the agreement with Anton J. Rasmussen was approved. Mr. Rasmussen was to create seven large paintings for display at the Salt Lake International Airport which included a painting of Dead Horse Point, but the Airport Authority would like it replaced with another painting. Mr. Rasmussen agrees to reimburse the $4,750 advanced on the painting upon its resale and will be paid $9,500 for the new painting. C 83-306
On August 11, 1983, an agreement was approved leasing Hangar 14, Row 10 at the Salt Lake International Airport to Sidney Nebeker and Five Seven November commencing November 1, 1982. C 83-307
On August 11, 1983, an agreement was approved leasing Shade Hangar 11, Row 11 at the Salt lake International Airport to Gerald R. Moress and Mountain Flyers Ltd. Inc. commencing August 1, 1983. C 83-308
On August 11, 1983, an agreement was approved leasing Shade Hangar 6, Row 13 at the Salt lake International Airport to R. Warren Barnes and Wayne Thornton commencing June 1, 1983. C 83-309
On August 11, 1983, an agreement was approved with Ideal Waste Systems, Inc. for refuse collection at 16 separate city facilities for a total monthly cost of $853. C 83-310
On August 9, 1983, an agreement of employment was approved with Edward C. Anderson to provide services of Personnel Intern on a part-time basis at a wage of $5 per hour for a period of one year commencing August 1, 1983. C 83-311
On May 22, 1984, an amendment to the agreement with Western Food Service Company, Inc. was approved which will provide a better means of verifying financial transactions in their operation of the food concession at the Glendale Golf Course. C 83-312
On August 9, 1983, a Concession-Lease Agreement was approved with Western Food Service Company, Inc. to lease the club house at the Glendale Golf Course at 1600 West 2100 South for a period of 5 years commencing June 16, 1983 for an amount equal to 12.6% of the gross receipts monthly and an initial investment of $20,000. C 83-312
On August 9, 1983, a Commission was approved to allow Gregory Wayne Dodge and D. Craig Keller to serve in the Police Chaplain’s Corps.
C 83-313
On August 9, 1983, a cooperative agreement was approved with the Utah Department of Transportation (UDOT) for federally funded Railroad Safety Improvements consisting of: 1) Safety Improvements at 940 South Emery Street, Project No. RRP-0035(27), consisting of flashing lights and gates at an estimated cost of $108,000; and 2) Safety Improvements at 200 South 400 West, Project No. RRP-0005(32), consisting of flashing lights, gates and crossing improvements at an estimated cost of $288,000. The local match is estimated at $14,400, the Union Pacific Railroad will pay $14,400 and federal funds will pay $259,200. C 83-314
U.S. GOVERNMENT, NATIONAL WEATHER SERVICE, EXECUTIVE TERMINAL
Supplement No. 7 with the U.S. Government for lease of space in the Executive Terminal Building to be used by the National Weather Service, Lease No. 87-ABF-523 (GS-088-10866). This decreases the annual rent from $75,842.83 to $74,374.65. C 83-315
U.S. GOVERNMENT, GENERAL SERVICES ADMINISTRATION, NATIONAL WEATHER SERVICES
Supplemental Agreement No. 5: with the United States Government to Lease Agreement No. G$-08B-10866 for space in the Executive Terminal Building used by the National Weather Service. .This covers various rent increases, for the period of February 1, 1983 through January 31, 1986. C 83-315
On August 9, 1983, a supplemental lease agreement No. GS-08B-10866 was approved with the United States Government for an increase to the rate to lease space in the Executive Terminal Building at the Salt Lake International Airport. The increase will be payable at the rate of $5,417.50 per month. C 83-315
On August 30, 1983, a Waiver of Installation of Public Way Improvements was approved with Burnett Leasing Company at 1667 Beck Street. C 83-316
On August 30, 1983, a restrictive covenants agreement and warranty deed in regards to Petition 121 of 1982 were approved for Craig G. Adamson in behalf of St. Mary’s Park Subdivision Homeowners Association. This petition is concerning common areas within the subdivision used as landscaped open spaces for separating and channeling traffic and enhancing the public ways and the restricted covenant agreement reflects the city’s interest concerning the obvious restraints over the land. (Submitted by Craig G. Adamson in behalf of St. Mary’s Park Subdivision Homeowners Association)
C 83-317
On September 6, 1983, a Waiver of Installation of Public Way Improvements was approved for Young Electric Sign Company at 368 West Paxton Avenue. C 83-318
On August 25, 1983, an agreement was approved with Jim Pietramali for a 4-inch automatic sprinkler connection for Diamond Lil’s Restaurant located at 1528 West North Temple. C 83-319
On October 4, 1983, the contract with J. B. Day & Sons Construction Company was approved for the Big Cottonwood Treatment Plant, Project No. 26-WT-3. The amount of this contract is $102,984. C 83-320
On August 25, 1983, plans and specifications were approved for Reroofing and New Expansion Joints for the Sedimentation Basin at the Big Cottonwood Treatment Plant, Project No. 26-WT-3. C 83-320
On August 25, 1983, the contract with Utah Gardening & Landscape was approved for the Chipeta Way Median Strip Development, Project No.38-472-10. Alternate 1, Bid Items 1 and 3 were awarded at a cost of $29,397. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-321
On August 25, 1983, the contract with Gibbons and Reed Company was approved for Construction of Street Improvements on 1300 South, 700 East to 1300 East, Project No. 38-686 at a cost of $709,736. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-322
On September 27, 1983, an agreement was approved between the city and the South Davis Fire District wherein they will furnish personnel, fire fighting apparatus and emergency medical vehicles for fire protection and emergency medical assistance to each other on call in times of emergency or disaster. C 83-323
On September 27, 1983, an Interlocal Cooperative Agreement was approved with the State Judicial Council to provide data processing services including hardware, software communications and personnel to the Fifth Circuit Court. The state has allocated funds for this purpose and agrees to pay Information Management Services each month, one twelfth of the sum of $668,850 for these services. C 83-324
On September 27, 1983, an agreement was approved with Salt Lake County for the Salt Lake City-County Health Department which states that the interlocal agreements between these two parties to date shall remain in full force and effect until superseded by law or amended by agreement. C 83-325
On December 11, 1984, Amendment No. 1 was approved in the amount of $50,000.00 with Chen & Associates, Inc. to continue to provide testing services throughout completion of various contracts.
C 83-326
On August 30, 1983, an agreement with Chen and Associates, Inc. was approved to accomplish quality control and material testing services at the Salt Lake International Airport as the airport is expanding its facilities through the construction of the Concourse D Aircraft Parking Apron, the Concourse D Connecting Taxiway, the expansion of the existing South Cargo Apron, Concourse D and Connector and other miscellaneous projects. Their services will assure that construction is being accomplished in accordance with the specifications. The fee for these services is $97,980. C 83-326
On August 30, 1983, a service agreement was approved for Susan Norris to be hired to perform contract secretarial and clerical work in the Capital Planning and Programming Division. C 83-327
On August 30, 1983, an agreement was approved with Freeway Auto Service to provide auto and truck transmission repair and replacement services for the city. The agreement shall be in effect for a period of one year commencing August 30, 1983. C 83-328
On November 3, 1983, a loan agreement was approved with Select Telephone Technologies, Inc. to provide a maximum of $4,194,000 to be used by STT for facility acquisition and capital equipment purchases. The loan is to be repaid to the city over a 10 year period. C 83-329
On September 27, 1983, an Urban Development Action Grant (UDAG) agreement was approved for Select Telephone Technologies (STT). The $4,219,000 under this grant is awarded to SLC by the Department of Housing and Urban Development (HUD). These funds will be loaned to STT and semi-annually repaid to the city at a 3.10% interest rate, increasing with the firm’s before tax profits over a ten-year period beginning not later than June 1, 1985. This project consists of purchasing an existing facility and capital equipment for starting a telephone reconditioning plant within the city that will create an excess of 2,200 new permanent jobs. C 83-329
On August 30, 1983, an agreement was approved with James M. Paramore for Watermain Ext. 33-C-1283 to serve Paramore N/R #3 Subdivision at 1480 East 7555 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-330
On August 30, 1983, an agreement was approved with James N. Paramore for Watermain Ext. 33-C-1283, Special Contract No. 827 for Paramore N/R #3 Subdivision at 1480 East 7555 South, This watermain extension is not comp1eted at this time and will be done under the program for the extension of watermains beyond the city limits. C 83-330
On August 30, 1983, an agreement was approved with M. H. Properties for a 4-inch automatic sprinkler connection for the Brickyard Tower at 1245 East Brickyard Road. C 83-331
On August 30, 1983, an agreement was approved with Sugarhouse Spa Partnership for a 4-inch automatic sprinkler connection for their property at 1035 East 2100 South. C 83-332
On March 29, 1984, special agreements were approved with Richard L. Maires to obtain water service for Lots 5 and 6 of the Terrace Heights Subdivision, 2961 East 3900 South, Watermain Ext. 33-C-1285. C 83-333
On February 7, 1984, a Special Agreement was approved with Richard L. Maires providing for the maintenance and upkeep of a private pipeline for Lots 7 and 8 of the Terrace Heights Subdivision, 2961 East 3900 South. C 83-333
On September 20, 1983, Watermain Ext. No. 33-C-1285, Special County Contract No. 830 was approved with Richard L. Maires for Terrace Heights Subdivision, 2961 East 3900 South. The watermain extension is not completed at this time. Work will be done under the program- for the extension of watermains beyond the city limits. C 83-333
On September 20, 1983, a special agreement was approved with Richard L. and Jane B. Maires providing maintenance and upkeep of private pipelines for lots 1 - 8 at Terrace Heights Subdivision, Watermain Ext. No. 33-C-1285. C 83-333
On August 30, 1983, an agreement was approved with Richard L. Maires for Watermain Ext. No. 33-C-1285 to serve Terrace Heights Subdivision located at 2961 East 3900 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-333
On August 30, 1983, the contract with King Con, Inc. was approved for Construction of Street Improvements on Various Non-Contiguous Streets, Special Improvement District, Project No. 38-723. Schedules A and B were awarded in the amount of $623,693. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-334
On September 6, 1983, a renewal agreement was approved with Prudential-Bache Securities, Inc. for financial consulting services. C 83-335
On September 13, 1983, an agreement was approved for the Salt Lake City Board of Education to make a 6-inch detector check valve connection for the Indian Hills School located at 2496 St. Mary’s Drive. C 83-336
On September 8, 1983, an agreement was approved with the Salt Lake City Board of Education for a 6-inch detector check valve connection for the Indian Hills School at 2496 St. Mary’s Drive. C 83-336
On September 6, 1983, an agreement was approved with the Utah Department of Transportation (UDOT) transferring maintenance responsibility to the city of a frontage road west of 5600 West adjacent to the I-80 freeway. C 83-337
TRANS-WEST FLIGHT SCHOOL, INC., SKYHAWK AVIATION
Amendment No. 3: to the agreement with Trans-West Flight School, Inc. dba Skyhawk Aviation for an FBO operation at Salt Lake City Airport II. This amendment extends the term by one year (to March 31, 1986) for 306,487 square feet at $893.92 per month and the concessionaire will pay 73.3% of utility costs. C 83-338
SKYKAWK AVIATION, TRANS-WEST FLIGHT SCHOOL, INC., AL ALDER
Amendment #2 to Concessionaire Agreement dated May 9, 1978. This amendment reduces the amount of the performance bond requirement from $25,000.00 to $10,000.00. C 83-338
On September 13, 1983, an agreement extension was approved with Trans-west Flight School, Inc. dba Skyhawk Aviation extending their current agreement for an F130 operation in the facility at Airport II. This extension will be on the same terms and conditions as existed in their prior agreement and staff will negotiate the remaining four years after evaluation and appraisal of the market conditions at Airport II during 1983. This extension was effective April 1, 1983. C 83-338
On September 13, 1983, an agreement was approved with Joyce P. Gill for Gill Subdivision located at 1725 South 6795 East. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-339
On September 13, 1983, Watermain Ext. No. 33-C-1286, Special County Contract No. 829 was approved with Joyce P. Gill for Gill Subdivision located at 1725 South 6795 East. This watermain extension is not completed at this time and work will be done under the program for the extension of watermains beyond the city limits. C 83-339
On September 13, 1983, Watermain Ext. No. 33-C-1279, Special County Contract No. 825 was approved with Christiansen Bros, Inc. for Riviera Freights No. 15 Subdivision located at 2340 East 7530 South. The watermain extension is not completed as of this tine and will be done under the program for the extension of watermains beyond the city limits. C 83-340
On September 13, 1983, an agreement was approved with Christiansen Bros, Inc. f or Riviera Heights No. 15 Subdivision located at 2340 East 7530 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-340
On September 13, 1983, an agreement was approved for the Disabled American Veterans to make a 4-inch automatic sprinkler connection for their building located at 800 South and 300 East. C 83-341
On September 21, 1983, a Revocable Permit was approved for First Security State Bank for property located at 381 East 300 South.
C 83-342
an September 16, 1983, a lease agreement was approved between the city and the Salt Lake City Public Library Board to lease city property at 1111 South 2100 East for a period of 50 years to construct and operate an East Bench library facility. C 83-343
On September 20, 1983, a Waiver of Installation of Public Way Improvements was approved for Sam F. Soter Investment, 1434 South 700 West. C 83-344
On September 20, 1983, the contract with Jacobsen-Robbins Construction Co. was approved for the Terminal Unit 2 Expansion at the Salt Lake International Airport, Project No. 19-A-106-20. The base bid and alternate no. 3 were awarded for a total of $3,022,222. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-345
On September 20, 1983, the contract with Nickerson Company was approved for the 125 HP Vertical Turbine Pumps for Hydrant Fuel System at the Salt Lake International Airport, Project 19-A-122-22. The base bid was awarded in the amount of $46, 165. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-346
On September 20, 1983, an agreement was approved with Spatafore & Associates for the publication of an airport newsletter for one year. Four quarterly newsletters will be provided for distribution among all employees working at city airports. The total cost for the publication shall not exceed $8,000. C 83-347
On September 20, 1983, an agreement was approved for Northwest Pipeline Corporation to sublease part of an aircraft storage hangar on land at the Salt Lake International Airport being leased from the city by Eaton Corporation. C 24-348
On September 20, 1983, an agreement was approved for B & A Leasing to sublease part of an aircraft storage hangar on land at the Salt Lake International Airport being leased from the city by Eaton Corporation. C 83-349
On September 20, 1983, an agreement was approved with Dale Hadley to lease Shade Hangar 9, Row 13 at the Salt lake International Airport conm3ncing May 1, 1983. C 83-350
On September 20, 1983, an agreement ‘was approved with Gene Werner to lease Shade Hangar 12, Row 12 at the Salt Lake International Airport from November 1, 1982 to June 15, 1983 and Shade Hangar 7, Row 13 from June 16, 1983 to termination. C 83-351
On September 20, 1983, an agreement was approved with. Fred Moosman and David Bragg to lease Shade Hangar 19, Row 11 at the Salt Lake International Airport commencing July 15, 1982. C 83-352
On September 20, 1983, an agreement was approved with Leonard Korenko and Gary Ferguson to lease Shade Hangar 19, Row 14 at the Salt Lake International Airport commencing August 13, 1983. C 83-353
On September 20, 1983, an agreement was approved with Michael Muir & Steven F. Darton to lease Shade Hangar 2, Row 14 at the Salt Lake International Airport commencing September 3, 1983. C 83-354
On September 20, 1983, an agreement was approved with George L. Sonntag to lease Shade Hangar 20, Row 13 at the Salt Lake International Airport from July 1, 1982 to July 31, 1983 and Shade Hangar 27, Row 12 from August 1, 1983 to termination. C 83-355
On September 20, 1983, an agreement was approved with Controlcom, Inc. to allow for installation of alarm receiving connections at the Salt Lake City Fire Department Alarm Headquarters for the purpose of relaying fire alarms and water flow signals from alarm installations throughout the city. The company is responsible for all costs and expenses incurred in the installation, operation, testing, maintenance and upkeep of all alarm facilities and will pay to the city the sum of $1 per month for each individual alarm connection to cover equipment space, operating power, etc. C 83-356
On September 20, 1983, an agreement was approved with Realint Ltd., for an 8-inch automatic sprinkler connection at 430 Neil Armstrong Road. C 83-357
On September 20, 1983, an agreement was approved with David O. and Marilyn A. Hinckley who are leasing property at the Salt Lake International Airport from the city. This agreement will hold the city harmless while sewage sludge is being applied. C 83-358
On September 20, 1983, Watermain Ext. No. 33-C-1074, Special County Contract No. 780 was approved with American Tierra Corporation for Prospector Hills No. 6, 7, & 8 Subdivisions at 7200 South, east of Wasatch Boulevard. The watermain extension is not completed at this time. Work will be done under the program for the extension of watermains beyond the city limits. C 83-359
On September 20, 1983, an agreement was approved with American Tierra Corp. for Watermain Ext. No. 33-C-1074 to serve Prospector Hills No.. 6, 7, & 8 Subdivisions at 7200 South, east of Wasatch Boulevard. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-359
On October 25, 1983, an agreement was approved with LaMar W. Coon for Watermain Ext. 33-C-1220 to serve Little Willow Subdivision at 8575 South, west of Wasatch Boulevard. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-360
On September 27, 1983, Watermain Ext. No. 33-C-122O, Special County Contract No. 812 was approved with LaMar W. Coon for Little Willow Subdivision located at 8575 South Wasatch Blvd. This watermain extension is not complete at this time. Work will be done under the program for extensions of watermains beyond city limits. C 83-360
On September 20, 1983, an agreement was approved with LaMar W. Coon for Watermain Ext. No. 33-C-1220 to serve Little Willow Subdivision, 8575 South, west of Wasatch Boulevard. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-360
On September 20, 1983, the contract with Westcon was approved for the watermain extension on 2200 West, 700 North to North Temple and 700 North, 2200 West to Redwood Road, Project No. 35-4172. Total amount of this contract is $466,423.20. C 83-361
On September 20, 1983, an agreement was approved with Orvel H. and Lila B. Ladle in which they have assigned all of their rights in the Lower Mill Creek Irrigation Company to the city and have agreed that the city repair the service line at its cost as consideration for the transfer of all stock, rights and certificate. This agreement also specifies that they receive water from the city under the Special County Contract. C 83-362
On September 20, 1983, an agreement was approved with Craig’s, Inc. for the maintenance of the police solo motorcycles. C 83-363
On September 29, 1983, the plat, covenant and agreement were approved for Ensign Downs Plat H, Project No. 38-733 guaranteeing installation of subdivision improvements. C 83-364
On September 27, 1983, the contract with Western Sheet Metal Inc. was approved for the Air conditioning System Replacement at the Police Department Computer Room, Project No. 13-CA-22. This contract total is in the amount of $52,784. C 83-365
On September 27, 1983, a maintenance agreement was approved with Johnson Controls whereby they will maintain the heating and cooling systems for the Public Utilities office building at an annual cost of $1,296. C 83-366
On September 27, 1983, a grant agreement in the amount of $151,275 was approved with the Housing Authority of Salt Lake City for Community Development Block Grant (CDBG) funding to be used for the Jefferson Circle Housing Project which involves street and infrastructure construction under the Emergency Housing Program, a Relocation Specialist and CDBG Support Services by the Housing Authority. C 83-367
On September 27, 1983, Watermain Ext. No. 33-C-1280, Special County Contract No. 826 was approved with Bradshaw Development Company for Highland and Orchards PUD located at 1625 East Caroleen Way (4225 South). This watermain extension is not complete at this time. Work will be done under the program for extensions of watermains beyond city limits. C 83-368
On August 7, 1983, an agreement was approved with Motorola Communications and Electronics, Inc. in the amount of $6,799 for installation of 800 MHz trunking type communications equipment for the Sewer Division. C 83-368
On September 27, 1983, a cooperative agreement was approved with the Utah Department of Transportation (UDOT) for Projects RRS-RRP-0035 (3) and RRS-0035 (17), Railroad Highway Crossing Safety Improvements at 200 South 670 West. Under this agreement Federal Railroad Safety Funds will pay for 90% of the estimated total cost of $260,000 with the local share of $26,000 to be paid 50% by the city and 50% by the Denver and Rio Grande Western Railroad Company. This will provide flashing lights, gates and improvements to the crossing materials.
C 83-369
On October 4, 1983, a lease agreement was approved with Michael Scott and AIRCO leasing Shade Hangar 1, Row 11 at the Salt Lake City International Airport commencing September 1, 1983. C 83-370
On October 4, 1983, the contract with Century Asphalt Paving, Inc. dba Slurry Coatings was approved for the Apron Slurry Seal Coating at the Salt Lake International Airport, Project 19-A-100-2. The amount of the contract is $34,040. The Airport Authority is authorized to Issue a notice to proceed to the contractor. C 83-371
On October 4, 1983, the contract with W.W. & W.B. Gardner, Inc. was approved for the Storm Drainage Repair at the Salt Lake International Airport, Project 19-A-119-2. The amount of the contract is $24,180. The Airport Authority is authorized to issue notice to proceed to the contractor. C 83-372
On October 4, 1983, the contract with Prairie Tank & Construction Company was approved for Project 19-A-122-23, the 30,000 BBL Storage Tank #4 at the Salt Lake International Airport. The base bid was awarded in the amount of $151,090. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-373
On October4, 1983, a lease agreement was approved with Larry Gobble, Ken Proctor, Bob Welti and Paul Ota leasing Shade Hangar 16, Row 14 at the Salt Lake International Airport commencing September 12, 1983. C 83-374
On October 4, 1983, an agreement was approved with Olsen & Peterson Consulting Engineers, Inc. for the preparation of design plans and specifications for Project No. 13-CA-22, the Air Conditioning of the Computer Center and Dispatch Office at the Police Department. The amount of this contract is $2,800. The Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-375
On October 4, 1983, a contract was approved with AAA Demolition for the performance of demolition work at a property located at 163 South 800 East owned by Jerold Schmidt. The amount of the contract is $4,600. This is in connection with SLC vs Hanks, Hanks, Sherman, Schmidt and Hall, Order No. D-83-1. C 83-376
On October 4, 1983, an agreement was approved with J. F. Cannon and Thomas Q. Cannon dba 444 South State in which they request permission to make a four-inch automatic sprinkler connection for their property at 444 South State. C 83-377
On October 4, 1983, an agreement was approved with Cornelius Development Corporation for Watermain Ext. No. 33-C-1277 to serve Cottonwood Manor Subdivision, 6890 South 2900 East. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-378
On October 4, 1983, Watermain Ext. No. 33-C-1277, Special County Contract No. 824 was approved with Cornelius Development Corporation to serve Cottonwood Manor Subdivision, 6890 South 2900 East. The watermain extension is not complete at this time. Work will be done under the program for the extension of watermains beyond the city limits. C 83-378
On November 1, 1983, an Aid to Construction agreement was approved with Spring Run Associates, for Watermain Ext. 33-C-1288 serving Spring Run Subdivision. They did not meet the terms of their previous contract so it will be cancelled. C 83-379
On October 4, 1983, an agreement was approved with Spring Run Associates for Watermain Ext. No. 33-C-288 to serve Spring Run Subdivision, 1500 East 5000 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-379
On October 4, 1983, an agreement was approved with Probe Construction Company for existing Watermain Ext. No. 33-C-3O9 to serve property located at 1390 East 3900 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-380
On October 4, 1983, the contract with Security Builders, Inc. was approved for the Concrete Replacement, Project No. 40-R-1-D. The contract amount is $123,974. The Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-381
On October 4, 1983, a contract was approved with Lein Services for restroom sanitation services in the City and County building. These services will be provided at a cost of $44 for the first service and $22 every two weeks thereafter. C 83-382
On October 4, 1983, an agreement was approved with Centro Civico Mexicano for CDBG funds for staff salaries, office expenses and related promotional costs to assist CCM in fund-raising for the construction of a multi-use community center. C 83-383
On October 4, 1983, a lease agreement was approved with Larry G. Trythall and Continental Steel leasing Shade Hangar 15, Row 11 at the Salt Lake International Airport commencing September 16, 1983.
C 83-384
On September 27, 1983, the contract with Toni Flynn Construction, Inc. was approved for the construction of Local Drainage Improvements, Project No. 47-11-266. Schedules 6 through 10 were awarded for the sum of $131,605. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-385
Un September 27, 1933, Watermain Ext. NO. 33-C-1287, Special County Contract No. 831 was approved with Brad Watts for Watts N/R #2 Subdivision, Lot 3, located at 2860 Bridgewater Drive (7550 South). This watermain extension is not complete at this time. Work will be done under the program for extensions of watermains beyond city limits. C 83-386
On November 15, 1983, an interlocal agreement was approved with Salt Lake County for road maintenance services as part of the road restoration for the Big Cottonwood Conduit project on Wasatch Boulevard. C 83-387
On October 4, 1983, an agreement was approved with Mr. Lloyd E. Platt for replacement of the deteriorated concrete sidewalk on his property. This is part of the Sidewalk Replacement, 510 40-R-5. Mr. Pratt will be deleted from the SID upon requirement that he complete all final repairs upon development of his property. C 83-388
On October 4, 1983, an agreement was approved with Hudson Properties for replacement of the deteriorated concrete sidewalk on their property. This is part of the Sidewalk Replacement, 510 40-R-5. Hudson Properties will be deleted from the SID upon requirement that they complete all final repairs upon development of their property. C 83-389
On October 11, 1983, an agreement was approved with Gold Cross Services, Inc. to provide ambulance service to the citizens of Salt Lake City at no charge. C 83-390
On July 23, 1984, a supplemental agreement with Okland Construction was approved for the Sugarhouse Business District Improvements, Project 38-708. This agreement addresses negotiated and deduct items for Schedule B and the new amount is for $602,325.38. The Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-391
On October 25, 1983, an agreement was approved with Edwin S. Gallacher to lease Hangar 15, Row 10 at the Salt Lake International Airport commencing August 1, 1982. C 83-392
On October 25, 1983, an agreement was approved with Fred J. Bonney and Heritage Stoves to lease Hangar 14, Row 3 at the Salt Lake International Airport commencing December 1, 1982. C 83-393
On October 11, 1983, the contract with R. C. Jones and Company was approved for construction of the East Paxton Lift Station, Project No. 47-N-P-6. The base bid plus the optional deductive alternate was awarded in the amount $127,171. The Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-394
On October 11, 1983, the contract with Facet Enterprises, Inc. was approved for the 1200 6PM Filter/Separator & Appurtenant Equipment for Hydrant Fuel System at the Salt Lake City International Airport, Project 19-A-122-25. The base bid was awarded in the amount of $44,058. The Airport Authority is authorized to issue a notice to proceed to the contractor. C 83-395
On October 11, 1983, a lease agreement was approved with R. Warren Barnes and Wayne Thornton to lease Shade Hangar 19, Row 12 at the Salt Lake City International Airport commencing August 15, 1983.
C 83-396
YOUNG ELECTRIC SIGN COMPANY, YESCO
Amendment No. 1: to the 1983 lease agreement with Young Electric Sign Company. This amendment extends the terra of the lease by nine months. C 83-397
On October 11, 1983, a lease agreement was approved with Young Electric Sign Company for a corporate hangar site on the east side of Salt Lake International Airport which encompasses a 47,374 square foot area. The rental will be $.O95 per square foot per year divided into monthly payments of $137.54 per month. This lease will be in effect for 13 years. Young’s investment is estimated to be $80,000. C 83-397
On October 14, 1983, an agreement was approved with Wallace N. Cooper II, Architect and Associates for the Forest Dale Golf Course Clubhouse Structural Feasibility Study and Alternative Use Plan. Recently, the clubhouse was nominated and designated to the city’s Register of Cultural Resources for its historical and architectural qualities. The building is in a state of disrepair and is not being used to its potential. The Sugarhouse Community Council requested that CDBG funds in the amount of $10,000 be budgeted for this feasibility study. C 83-398
On October 14, 1983, a Revocable Permit was approved to Glade B Hansen and LaVar Erickson for permission to landscape a portion of the Jordan and Salt Lake Canal property lying adjacent to their residence at 1192 Roosevelt Avenue. C 83-399
On March 5, 985, an amendment was approved with Bonneville Pacific Corporation for studies and services on hydro-power projects. This amendment increases the amount from $5,000.00 to $7,500.00. C 83-400
On October 4, 1983, an agreement was approved with Bonneville Pacific Corporation to search out and specify a range of financing alternatives to acquire and construct various hydroelectric facilities for the city. BPC shall be paid at the rate of $60 per man hour for time expended, but not to exceed $5,000 without prior approval from the city. All fees paid BPC shall be reimbursed to the city upon successful implementation of a financing plan. C 83-400
On October 14, 1983, an agreement was approved with Steven H. Brown for installation Watermain Ext. No. 35-4231 to serve property at 1640 West 500 South. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-401
On October 14, 1983, an agreement was approved with S. Spence Clark for permission to make a four-inch automatic sprinkler connection for his property at 2202 McClelland Street. C 83-402
On October 11, 1983, an agreement was approved with Thelma N. Bowden for Watermain Ext. No. 33-C-664 to serve 1500 East Spring Lane. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-403
On October 14, 1983, an agreement was approved with Harlan E. Hansen for Watermain Ext. No. 33-C-996 to serve the property located at 4535 South Abinadi Road. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-404
PITTSBURGH TESTING LABORATORY, AIRPORT MAINTENANCE FACILITIES, WESTERN AIRLINES CARGO BUILDING EXPANSION, TOLL BOOTHS
Amendment No. 6: in the amount of $4,675.00 with Pittsburgh Testing. This is to allow the contractor to complete the inspection and testing on the Airport Maintenance Facilities, Western Airlines Cargo Building Expansion, and the Toll Booths at the Salt Lake International Airport. C 83-405
PITTSBURGH TESTING LABORATORY
Amendment No. 5: to provide additional, services for steel fabrication and bolted and .welded connections inspection and testing in accordance with terms of January 24, 1984 agreement, in the amount of $9,500.00. C 83-405
On October 23, 1984, Amendment No. 4 in the amount of $5,595.00 was approved with Pittsburgh Testing Laboratory to include weld and bolt inspection services for the Joint Cargo Building II at the Salt Lake International Airport. C 83-405
On July 16, 1984, Amendment No. 3 to the agreement with Pittsburgh Testing Laboratory was approved to prepare surface preparation and painting inspection services for Fuel Storage Tank No. 4 at the Salt Lake International Airport. C 83-405
On April 17, 1984, Amendment No. 2 was approved to the agreement with Pittsburgh Testing Laboratory to provide weld and bolt inspection services for the Concourse “C” Expansion at the Salt Lake International Airport for the amount of $4,651. C 83-405
On March 16, 1984, Amendment No. 1 to the agreement with Pittsburgh Testing Laboratory was approved to include the performance of testing and inspection of the high strength bolts on the steel frame construction for the Concourse D and Terminal Unit 2 projects at the Salt Lake International Airport for a fee of $3,000. C 83-405
On January 24, 1984, an agreement was approved with Pittsburgh Testing Laboratory to provide weld inspection services at the Salt Lake International Airport. There are presently two projects under construction which utilize a steel frame construction system with welded connections, the Expansion of Terminal 2 and Concourse D and Connector. The specifications required that the welds be tested by radiography or ultrasonic non-destructive testing. The cost will be $24,276. C 83-405
On October 11, 1983, a letter of request was approved for Louis Miller to waive the consultant selection procedures for material testing laboratories to test the steel welds made in the construction of Concourse D and the Connector and Terminal Expansion at the Salt Lake International Airport. According to the specifications, all welds must be tested by radiography or ultrasonic methods to determine if they have been properly made and the general materials testing consultant under contract with the airport does not have the capability to perform this type of specialized testing. Due to the early scheduling of steel deliveries by the contractor, they do not have sufficient time to follow the normal consultant selection process. The estimated cost for this testing will be $10,000 to $20,000. C 83-405
On January 10, 1984, an interlocal agreement was approved with the Utah State Department of Social Services for CDBG funding for the Emergency Works Program as part of the city’s 1983 CDBG “Jobs Bill” program. C 83-406
On December 6, 1983, the City Council approved Resolution 100 of 1983 endorsing a Memorandum of Understanding between Salt Lake County Water Conservancy District, Central Utah District, Metropolitan District, Salt Lake City and the Bureau of Reclamation relating to long-term delivery of water within Salt Lake County. C 83-407
On October 25, 1983, a lease modification agreement was approved between the city and Salt Lake County on property surrounding the Wave Pool. This lease modification is necessary to make it possible to lease this property to a private developer to build a water theme park. The city will pay the county $27,540 annually for the first five years as compensation for the use of this property. C 83-408
On November 8, 1983, an agreement was approved with Bryant J. Brown and Trekker Aeronautics to lease Shade Hangar 10, Row 13 at the Salt Lake International Airport commencing November 1, 1983. C 83-409
On November 8, 1983, an agreement was approved with Steve Eddy and Paulette Eddy to lease Shade Hangar 16, Row 14 at the Salt Lake International Airport commencing November 1, 1983. C 83-410
On November 8, 1983, an agreement was approved with Robert Jones Barney and Danny Sorensen to lease Hangar 8, Row 8 at the Salt Lake International Airport commencing October 5, 1983. C 83-411
On November 8, 1983, an agreement was approved with LaMar McQuaid, Dale Hadley and William Swatscheno to lease Hangar 24, Row 15 at the Salt Lake International Airport commencing September 6, 1983.
C 83-412
On November 8, 1983, an agreement was approved with LaMar McQuaid to lease Hangar 4, Row 8 at the Salt Lake International Airport commencing July 1, 1982. C 83-413
On November 8, 1983, an agreement was approved with Jerry Campbell and Campbell’s Company, Inc. to lease Shade Hangar 6, Row 13 at the Salt Lake International Airport commencing October 6, 1983. C 83-414
On November 8, 1983, an agreement was approved with Leonard J. Maki and Leonard J. Maki and Associates, Inc. to lease Shade Hangar 11, Row 2 at the Salt Lake International Airport commencing November 1, 1983. C 83-415
On December 6, 1983, an agreement was approved with W. Garth Andrus to serve as a Police Chaplain in the Police Chaplain’s Corps.
C 83-416
On November 8, 1983, a water supply permit and agreement was approved with Bruce L. Moesser providing for water use to an existing cabin in Big Cottonwood Canyon. C 83-417
On November 8, 1983, an agreement was approved with Beth E. Ludlow for Watermain Ext. 33-C-769 to serve Mt. Olympus Hills No. 18 at 3811 South Brockbank Drive. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-418
On November 8, 1q83, an agreement was approved with John and Mary LaVon Stewart wherein they have assigned all their rights in Lower Millcreek Irrigation Company to the city in exchange for water service and repair of the service line. C 83-419
On November 8, 1983, a Waiver of a Revocable Permit was approved for McDonald’s Corporation at 1680 South Redwood Road. C 83-420
On November 6, 1984, Amendment No. l was approved with Pannel, Kerr, Forster, Certified Public Accountants. This amendment is necessary for additional work and will increase the total not-to-exceed amount from $22,700 to $29,000. C 83-421
On November 22, 1983, an agreement was approved with Pannell, Kerr, Forster, Certified Public Accountants, to perform a feasibility study for a proposed hotel to be located on Salt Lake City International Airport property. The feasibility study will determine current and future potential demands for hotel accommodations in the market area and recommend the type of facility. A complete financial analysis will be presented depicting the estimated operating results of the hotel. Also a final presentation and documented report will be presented for use in determining whether the airport should proceed with the development of a hotel structure. The total cost for this study is $22,700 and it should be completed by January 15, 1984.
C 83-421
On June 4, 1985, Supplement No. 1 was approved with the U.S. Department of Transportation, Federal Aviation Administration, for Lease No. DTFA11-83-L-00089. This amends the lease to show the location of the premises at Building 1121 rather than 1120. C 83-422
On November 22, 1983, an agreement was approved with the U. S. Government lease of 800 square feet of warehouse space in Building 1120 at the Salt Lake International Airport to be used for storage of equipment. The lease is for one year at a cost of $720 per year.
C 83-422
On November 22, 1983, a consent and agreement form was approved for the sublease of space by Transworld Airlines Inc. (TWA) from United Air Lines, Inc. (United) in Terminal I at the Salt Lake International Airport. C 83-423
On November 22, 1983, the contract was approved with Healthwise, an open panel health maintenance organization which the city is now offering to employees effective August 1, 1983. Expenditures for the premiums are budgeted in the Health Insurance Trust Fund. C 83-424
STATE COURT ADMINISTRATORS OFFICE, 5TH CIRCUIT COURT BUILDING, STATE OF UTAH, 451 SOUTH, 200 EAST
First lease agreement amendment with the State of Utah for the 5th Circuit Court Building. This allowed the State to install a computer facility on the first floor of the building. C 83-425
On November 22, 1983, an agreement was approved between the city and the State of Utah, Office of the State Court Administrator, for lease of office space in the Fifth Circuit Court Building, 451 South 200 East. The city leases 46,721.2 square feet of space in the building for a cost of $345,325.46 annually, payable semi-annually. This lease commences July 1, 1983 and will be in effect for a period of five years. C 83-425
On November 22, 1983, a cooperative agreement was approved with the Utah Department of Transportation (UDOT) wherein the city will readjust the manhole covers, rings, storm sewer cleanout boxes and valve boxes located in areas where UDOT has recently completed paving projects. C 83-426
On November 18, 1g83, the plat and agreement were approved for Public Improvements and Design Specifications for the Parkway No. 3 Subdivision, Project 38-704. Also an Easement Agreement Over Holding Strip Lot was approved wherein the city will allow Olco Corporation to use Lot 221 as part of the public street system to extend Stetson Circle to provide access to Olco’s subdivision. C 83-427
On November 15, 1983, an agreement was approved with Larry Dahle and Dahle’s Big & Tall to lease Shade Hangar 2, Row 13 at the Salt Lake International Airport commencing November 1, 1983. C 83-428
On November 15, 1983, a Waiver of Installation of Public Way Improvements was approved for Peter William Wilson at 2001 North 900 West. C 83-429
On May 31, 1985, a County Flood Control Permit was approved for the Gateway Storm Drain connection to the Jordan River. C 83-430
On November 1, 1983, a lease agreement was approved with Clement E. Jay to lease 101 acres of property at the Salt Lake International Airport for the purpose of grazing cattle. The amount of this lease is $185.16 per year and will be in effect for a period of five years. C 83-430
On November 1, 1983, a lease agreement was approved with Gillmor Livestock Corp. and Edward L. Gillmor to lease 938 acres of property at the Salt Lake International Airport for the purpose of grazing cattle. The amount of this lease is $1,172.00 per year and will be in effect for a period of five years. C 83-431
On November 1, 1983, a lease agreement was approved with Bertagnole Land and Livestock Co. and Jay Bertagnole to lease 541 acres of property at the Salt Lake International Airport for the purpose of grazing cattle. The amount of this lease is $676.25 per year and will be in effect for a period of five years. C 83-432
On November 1, 1983, a lease agreement was approved with Tony Jacketta to lease 130 acres of property at the Salt Lake International Airport for the purpose of grazing cattle. The amount of this lease is $162.50 per year and will be in effect for a period of five years. C 83-433
On November 1, 1983, a lease agreement was approved with Lamar Drechsel to lease 175 acres of property at the Salt Lake International Airport for the purpose of grazing cattle. The amount of this lease is $218.75 per year and will be in effect for a period of five years. C 83-434
On November 1, 1983, an agreement was approved with All Pro Enterprises, dba Jackman Elevator Company for maintenance of the elevators in the Metropolitan Hall of Justice for a monthly fee of $830. C 83-435
On November 1, 1983, an agreement was approved with Ms. T. J. Walstra to provide janitorial services at the Parks and Recreation Building for a period of one year commencing September 1, 1983 for a fee of $500 per month. C 83-436
On November 1, 1983, the contract with Nelson Brothers Construction was approved for the Digester Wall Covers at the Water Reclamation Plant, 1850 North Redwood Road, Project No. 49-Q-5-31. This project is to be completed at a cost of $172,721. C 83-437
On November 1, 1983, an agreement with the Utah Department of Transportation, (UDOT) was approved for I-215-9(63)8, the 20th East Structure over I-215 and detour. This agreement is for adjusting water facilities on the project. C 83-438
On November 1, 1983, an agreement was approved with 215 South State Associates for an 8-inch automatic sprinkler connection for the BoyerBui1ding at 215 South State. C 83-439
On November 1, 1983, an agreement was approved with Post Office Place Associates for a 4-inch automatic sprinkler connection for property at 39 Post Office Place. C 83-440
On November 4, 1983, an agreement was approved with the Utah Department of Transportation (UDOT) for the construction of the Hawthorne and Lowell School Turnouts, Project 38-738. The turnouts will be paved areas at the two schools where parents can drop off and pick up children in a safe manner outside of traffic lanes. The Wasatch Front Regional Council will provide $22,300, the SLC School District will provide $1100 and the city $1100. C 83-441
On November 1, 1983, the contract with M & E Construction was approved for the Multi-Ethnic Senior Citizens Center, Project No. 3-8. The base bid plus alternates 1, 3 and 4 were awarded in the amount of $20,744. The City Engineer’s Office is authorized to issue a notice to proceed to the contractor. C 83-442
On October 25, 1983, an agreement was approved with John F. Flake to lease Shade Hangar 25, Row 11 at the Salt Lake International Airport commencing November 1, 1982. C 83-443
On October 25, 1983, an agreement was approved with Sherwood Boberg to lease Shade Hangar 6, Row 12 at the Salt Lake International Airport commencing December 1, 1982. C 83-444
On October 25, 1983, an agreement was approved with Andrew O’Learain to lease Shade Hangar 12, Row 2 at the Salt Lake International Airport commencing November 1, 1982. C 83-445
On October 25, 1983, an agreement was approved with Harry Simmons to lease Shade Hangar 18, Row 12 at the Salt Lake International Airport commencing October 1, 1983. C 83-446
On October 25, 1983, an agreement was approved with Kent Bond to lease Shade Hangar 12, Row 11 at the Salt Lake International Airport commencing October 10, 1983. C 83-447
On October 25, 1983, an agreement was approved with Harold C. Christensen wherein he has assigned all of his rights in the Lower Millcreek Irrigation Company to the city and the city will repair the service line at its own cost as consideration for the transfer of all stock, rights and certificate. Mr. Christensen will also receive water from the city under the Special County Contract. C 83-448
On October 25, 1983, an agreement was approved with Aspen Distribution, Inc. to make a 6-inch automatic sprinkler connection for their property at 4215 West 1730 South. C 83-449
On October 25, 1983, an agreement was approved with 6th East Associates for a 4-inch automatic sprinkler connection for their property at 50 South 600 East. This is in connection with Petition 1100-29 of 1983. C 83-450
On November 22, 1983, an agreement was approved with David K. Richards and Company for Watermain Ext. 33-C-1291 to serve East Millcreek Cove Subdivision at 3100 South 1950 East. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-451
On November 22, 1983, an agreement was approved with David K. Richards for Watermain Ext. No. 33-C-1291, Special County Contract No. 834 for East Millcreek Cove Subdivision, 3100 South 1950 East. The watermain extension has not been completed at this time. Work will be done under the program for the extension of watermains beyond the city limits. C 83-451
On November 22, 1983, an agreement was approved with R. Eric Peterson Construction Co., Inc. for Watermain Ext. SC WD 25-W-3 to serve Peterson N/R No. 9 Subdivision at 2981 South 1700 East. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-452
On November 1, 1983, Special County Contract No. 828, Watermain Ext. 33-C-1289 was approved with Mike Westbrook to serve property located at 4545 South Abinadi Road. The watermain extension has not been. completed at this time. Work will be done under the program for the extension of watermains beyond the city limits. C 83-453
On October 25, 1983, the plans were approved for the replacement of an 18-inch sanitary sewer main on 800 South between 400 and 500 West, Extension No. 50-1272. C 83-454
On February 17, 1984, the contract with D. J. Company was approved for the Water Reclamation Plant Short Term aeration Pilot Plant Modifications, Project 49-Q-5-33. The total amount for this project is $73,700. C 83-455
On October 25, 1983, the plans were approved for the Water Reclamation Short-Term Aeration Pilot Plant Modifications. C 83-455
On November 15, 1983, an Addendum to the Carrigan Canyon Annexation Agreement was approved amending paragraph 2(b) relating to Land Use and Zoning to allow portions of Lots 9 and 10 to be developed. Petition 400-129 of 1983 submitted by Ronald H. Harrison. C 83-456
On October 25, 1983, an application was approved with Salt Lake County Planning Division for a conditional use permit for the proposed construction of the Brighton Weather Station cabin at Brighton, Utah, Project 104-B-24. C 83-457
On November 8, 1983, a Waiver of a Revocable Permit was approved for Marriott Corporation dba Marriott Hotel at 75 South West Temple.
C 83-458
On December 9, 1983, an agreement was approved with Charles W. Glasscock to lease Shade Hangar 10, Row 11 at the Salt Lake International Airport. C 83-459
On December 9, 1983, an agreement was approved with Richard Stout and V & D Sales to lease Shade Hangar 6, Row 2 at the Salt Lake International Airport. C 83-460
On December 6, 1983, a maintenance agreement was approved with American Sign and Indicator Corporation for maintenance of the time/temperature display located at the entrance road of the Salt Lake International Airport for a cost of $62.76 per month. C 83-461
On December 6, 1983, an agreement was approved with Terracor giving them an option on a parcel of land located on the east side of the Salt Lake International Airport for development and construction of a corporate hangar. C 83-462
On December 6, 1983, the contract with Valley Design and Construction, Inc. was approved for the Elks Park Development, Project No. 19-Y-71-1. The bid was awarded for $214,754.82 upon deletion of the following bid items: No’s. 23, 27, 33, 34, 35, 44 and 47. C 83-463
On December 6, 1983, the plats and agreement were approved for the Hot Springs Subdivision, Project No. 38-732. C 83-464
On December 9, 1983, an agreement was approved with John A. Craig to lease Shade Hangar 14, Row 12 at the Salt Lake International Airport. C 83-465
On December 6, 1983, an agreement was approved with Don Sheppard to lease Shade Hangar 17, Row 2 at Salt Lake City Airport II. C 83-466
On December 6, 1983, an agreement was approved with Jean Coffman and Richard H. Watkins to lease Shade Hangar 1, Row 13 at the Salt Lake International Airport. C 83-467
On December 9, 1983, an Easement for Pipelines was approved with Salt Lake County for Watermain Ext. No. 33-C-1294, Miller Avenue, west of Highland Drive for a distance of 240 feet. C 83-468
On December 6, 1983, a Commercial Lease was approved with Duane E. and Thelma S. Slaugh providing for the Police Department to continue leasing the building at 1486 South 1000 East for a substation for the East Patrol Division. The lease covers a three year period commencing July 1, 1983 and the monthly rental will be $2,100. C 83-469
On December 6, 1983, an Agreement for Engineering Services was approved between the city, Salt Lake County and Templeton, Linke & Associates for the 4th Avenue Storm Drain, Project No. 47-N-225-2. This will allow SL County to pay the final payment of $9,000 which will satisfy all claims against the city and county for the engineering work begun July 5, 1979. C 83-470
On February 26, 1985, an amendment was approved in the amount of $17,500.00 with Horrocks Engineers and John Carollo Engineers for the preparation of a drainage master plan for the Mid-Cities Area, Project No. 47-Q-1. This will allow for the design of a storm drain system from the Liberty Park Detention Basin to 900 South and, then to 300 East. C 83-471
On January 8, 1985, an amended agreement was approved in the amount of $16,000.00 with Horrocks Engineers and John Carollo Engineers for additional work associated with the Mid-City Drainage Master Plan, Project No. 47-Q-1. One half of the monies will come from County Flood Control and one half from Community Development. C 83-471
On December 6, 1983, an agreement was approved with Horrocks Engineers and John Carollo Engineers for the preparation of a drainage master plan for the mid-city area, Project No. 47-Q-1. The work will be performed for a fee of $100,000 which is available from County Flood Control and Community Development funds. C 83-471
On December 6, 1983, an Easement for Pipelines was approved with Salt Lake County for Watermain Ext. No. 33-C-1293, 3010 Creek Road, west of Danish Road for a distance of 730 feet. C 83-472
On December 6, 1983, an agreement was approved with Harrington and Company for installation of Sanitary Sewer Ext. No. 50-1283, Layton Avenue. H&C agrees to install the sewer mains as per plans approved by the Department of Public Utilities. C 83-473
On December 5, 1983, an agreement with International Environmental, Inc. was approved to allow them to utilize the SLC Water Reclamation Plant for the purposes of conducting experimentation and testing of a sulphur dioxide wastewater disinfection pilot plant. C 83-474
On January 3, 1984, an agreement was approved with Equity Homes and Associates for Watermain Ext. No. 35-4234 to serve Georgetown Subdivision. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-475
On November 15, 1983, an agreement was approved with Equity Homes and Associates for installation of Watermain Ext. No. 35-4234 and Sanitary Sewer Ext. No. 50-1277 in the Georgetown at Westpointe Subdivision. EH&A agrees to install the water and sewer mains as per plans approved by the Department of Public Utilities. C 83-475
On December 6, 1983, an agreement was approved with Highland Park Associates, Phil and Clark Enterprises, Inc. for a 4-inch automatic sprinkler connection at 3098 Highland Drive. C 83-476
On December 6, 1983, an agreement was approved with Richard H. Nordlund for a 6-inch automatic sprinkler connection for the Broadcast House, 55 North 300 West. C 83-477
On December 9, 1983, an agreement was approved with Charles W. Akerlow, Pacific Western for a 6-inch automatic sprinkler connection for the Oakhills Condominiums, 3125 East Kennedy Drive. C 83-478
On December 6, 1983, an agreement was approved with Darl Thomas to provide sculpture work for the Faultline Garden Park project at 400 South between 1000 and 1100 East. The art work will be a kinetic sculpture that aligns with the direction of the wind. The artist will be paid $3,000 and the sculpture will be completed by January 30, 1984. C 83-479
On December 9, 1983, an agreement was approved with Advance Display and Store Fixtures for installation and removal of Christmas decorations at Salt Lake International Airport during the next three Christmas seasons for a total of $8,742.89. C 83-480
On December 6, 1983, an agreement was approved with Genstar Cement and Lime Company providing a rate of $145.90/ton for hydrated lime used in water purification. C 83-481
On December 6, 1983, a service agreement was approved with Glen Grant to provide services as a parking citation and impound review officer on a part-time basis for a fee of $9 per hour. C 83-482
On December 20, 1983, a standard form agreement was approved with The Boyer Company, 1305 North Redwood Road for a waiver of installation of public way improvements. C 83-483
On December 20, 1983, a standard form agreement was approved with Capitol Industries, Inc., 2070 North Redwood Road for a waiver of installation of public way improvements. C 83-484
On December 20, 1983, an agreement was approved with Wayne Jay Harris and Sarah Harris wherein they have assigned all of their rights in Lower Millcreek Irrigation Company to the city. The city will repair the line as consideration for the transfer and the Harris’ will receive water under the Special County Contract. C 83-485
On December 20, 1983, an agreement was approved with Tri-S Concrete providing for the installation of a private watermain within the property located between 200 and 300 South on 748 West, whereby Tri-S agrees to install the watermain as per plans approved by the Department of Public Utilities. C 83-486
On December 20, 1983, an agreement was approved with John R. Gunther for Watermain Ext. 33-C-1295 to serve Brighton Ridge Subdivision at approximately 1900 East and 7300 South. This is to cover special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-487
On December 20, 1983, Watermain Ext. 33-C-1295, Special County Contract No. 837 was approved with John R. Gunther for Brighton Ridge Subdivision, 1900 East 7300 South. The watermain extension has not been completed at this time. The work will be done under the program for the extension of watermains beyond the city limits. C 83-487
On September 25, 1984, an amendment to the agreement with James M. Montgomery, Consulting Engineers, Inc. was approved for the proposed Northwest Quadrant Wastewater Treatment Facility Siting Study. This is for an additional amount of $9,100 to cover additional services not contemplated by the original agreement. C 83-488
On December 20, 1983, an agreement was approved with James M. Montgomery Consulting Engineers for a Northwest Quadrant Wastewater Facility Siting Study. The estimated cost for this study is $182,500. C 83-488
On December 20, 1983, a Revocable Permit was approved for Ryan J. Anderson for landscaping and gardening of a portion of the East Jordan Salt Lake Canal extension located adjacent to the Anderson property at 1580 East Dawn Drive. C 83-489
On December 20, 1983, an agreement was approved with Larry D. Livingston to provide legislative analysis and land use planning services for the City Council. This agreement is in effect from September 1, 1983 to June 28, 1984. Mr. Livingston will be paid $11.79 per hour through December 31, 1983 and $12.46 per hour thereafter and he will be eligible to receive insurance and retirement benefits. C 83-490
On December 20, 1983, an agreement was approved with Richard D. Lamborn to provide attorney services on an hourly basis for the Prosecutor’s Office for the sum of $14.00. C 83-491
On December 20, 1983, an agreement was approved with Larry V. Spendlove to provide attorney services on an hourly basis for the Prosecutor’s Office for the sum of $14.00 per hour. C 83-492
On January 10, 1984, the contract with Bounder Construction was approved for Watermain Ext. 35-4211, Goshen Street, 760 South to Indiana Avenue. Total cost for the construction will be $5,332.
C 83-493
On December 6, 1983, plans were approved for Watermain Ext. No. 35-4211, Goshen Street, Indiana Avenue to 760 South. C 83-493
On January 10, 1984, the contract with Bounder Construction was approved for Watermain Ext. 35-4210, 1100 West, south of 700 South. Total cost for the construction will be $9,115. C 83-494
On December 6, 1983, plans were approved for Watermain Ext. No. 35-4210, 1100 West, south of 700 South. C 83-494
On January 17, 1984, the contract with J & M Construction was approved for Watermain Ext. 35-4208, Major Street, 1700 South to Bryan Avenue. The cost of construction will be $11,211.75. C 83-495
On December 6, 1983, p1an were approved for Watermain Ext. No. 35-42O8 Major Street, 1700 South to Wood Avenue. C 83-495
On December 6, 1983, plans were approved for Watermain Ext. No. 35-4132, 1000 West, 635 to 765 South. C 83-496
On January 17, 1984, the contract with J & M Construction was approved for Watermain Ext. 35-4083, 500 West, Brooklyn to Montague Avenue. The cost of construction will be $14,372.75. C 83-497
On December 6, 1983, plans were approved for Watermain Ext. No. 35-4083, 500 West, Montague to Brooklyn Avenue. C 83-497
On December 20, 1983, an agreement with Delta Geotechnical Consultants, Inc. was approved for performance of geotechnical investigations at the Salt Lake City International Airport. This will include soils investigations and testing for the West Parallel Taxiway Reconstruction, Project 19-A-138-2 and Ramp Reconstruction South of Concourse A, Project 19-A-127. These services will be provided for a fee of $9,096. C 83-498
On December 20, 1983, an agreement with Delta Geotechnical Consultants, Inc. was approved for performance of geotechnical investigations at the Salt Lake International Airport. This will include soils investigations and testing for the East Parallel Taxiway Strengthening, South Section, Project 19-A-125-2 and the East Parallel Taxiway Strengthening & Widening, Central Portion, Project 19-A-125-3. These services will be provided for a fee of $9,983.
C 83-499
On December 20, 1983, an agreement was approved leasing Hangar 4, Row 15 at the Salt Lake International Airport to Robert Schumacker.
C 83-500
DELTA AIRLINES
Amendment No. 4 to Special Service Agreement Airline Fuel System to provide for the extension of the hydrant fuel system at gates 2, 4, 6 & 8 on Concourse D. C 83-501
On December 6, 1983, Amendment 3 to the Special Service Agreement with Delta Airlines, Western Airlines, Republic Airlines and Frontier Airlines was approved for the Airline Fuel System at the Salt Lake International Airport. This allows the Airport Authority to recoup investment costs associated with the fuel system currently under construction which is part of the 1983 expansion project. C 83-501
On December 15, 1983, the plats and agreement were approved for the Georgetown at Westpointe Subdivision. C 83-502
CO/OP MINORITY ECONOMIC DEVELOPMENT, COMMUNITY ORGANIZATIONS OPERATIONS PROGRAM, COMMUNITY DEVELOPMENT BLOCK GRANT, CDBG
Amendment: to 1983 agreement with CO/OP containing an Escrow Agreement detailing the disposition of $90,000.00 CDBG funds.
C 83-503
On December 9, 1983, a grant agreement was approved with Community Organization Operations Program, Inc. (CO/OP) for CDBG funding. CO/OP will purchase and rehabilitate a structure at 131 North 900 West for individuals and families proposing to start new businesses. C 83-503
On December 6, 1983, the plats and agreement were approved for Plat 16, Salt Lake International Center Subdivision, Project No. 38-736.
C 83-504
On November 1, 1983, the plat and agreement were approved with Ivory and Company for the Westpointe Plat “B” Subdivision to be located near the Salt Lake International Airport. The city received an avigation easement and two warranty deeds in connection with this proposed subdivision, also. C 83-505
On December 9, 1983, an Agreement for Disposition of Land for Private Development was approved between the Redevelopment Agency of Salt Lake City and lbs Associates for the Jackson Neighborhood Development Project Area, Redevelopment of Grant Street. C 83-506
On May 31, 1985, an amendment was approved to the Little Cottonwood Canyon Purchase and Trust and Escrow Agreement with TPL—Utah (Trust for Public Lands). The agreement will convey to Perpetual Storage, Inc. an easement for ingress and egress and continued storage of road de-icing salt to be used for Perpetual Storage and, in turn, Whitmore Oxygen Company, Robert Lynch and Perpetual Storage will quit claim to TPL certain tra.cts of land consisting of road and pipeline easements associated with power production. C 83-507
On December 6, 1983, an agreement was approved with Ivory and Company providing for the installation of Watermain Ext. No. 35-4074 and Sanitary Sewer Ext. No. 50-1268 in the Westpointe Plat B Subdivision. MC agrees to install the water and sewer mains as per plans approved by the Department of Public Utilities. C 83-508
On December 6, 1983, an agreement was approved with Ivory and Company for Watermain Ext. No. 35-4074 to serve Westpointe Plat B Subdivision between 900 and 1800 North Redwood Road. This agreement covers special pumping, reservoirs and/or supply lines as required to furnish culinary water to this subdivision over and above the normal expenditure for the extension. C 83-509
On October 19, 1983, an Agreement for Deposit of CDBG Funds to Establish a Housing Rehabilitation Fund was approved between the city, the Redevelopment Agency of Salt Lake City and Zions First National Bank. The city has appropriated funds from its 1983 CDBG program to assist in the rehabilitation and preservation of existing housing stock, Zions Bank will provide additional funds to finance the program and the Redevelopment Agency will administer the program. C 83-510
On November 1, 1983, a sublease agreement was approved between Republic Airlines, Inc. and American Airlines, Inc. for the sublease by American of 55 square feet of ticket counter which the Airport Authority leases to Republic in Terminal Unit #1. American has need of additional space and Republic has an excess of ticket counter space. C 83-511
On May 24, 1983, Amendment B to the agreement of July 1978 was approved with American, Continental, Delta, Frontier, Republic, United and Western Airlines to illustrate and get concurrence of the amount of rentable square footage in the terminal complex at the Salt Lake International Airport. This is necessary due to changes in the terminal complex which were not fully covered by the original rental space exhibits. C 83-512
On June 29, 1983, a Memorandum of Understanding with Western Alliance of State, County and Municipal Employees, Local 840 (WASCME) was not submitted to the City Council and no action was taken. C 83-513
FRONTIER AIRLINES
Amendment No. 4: to Special Service Agreement Airline Fuel System to provide for the extension of the hydrant fuel system at gates 2, 4, 6 & 8 on Concourse D. C 83-514
On December 6, 1983, Amendment 3 to the Special Service Agreement with Delta Airlines, Western Airlines, Republic Airlines and Frontier Airlines was approved for the Airline Fuel System at the Salt Lake International Airport. This allows the Airport Authority to recoup investment costs associated with the fuel system currently under construction which is part of the 1983 expansion project. C 83-514
WESTERN AIRLINES
Amendment No. 4: to Special Service Agreement Airline Fuel System to provide for the extension of the hydrant fuel system at gates 2, 4, 6 & 8 on Concourse D. C 83-515
On December 6, 1983, Amendment 3 to the Special Service Agreement with Delta Airlines, Western Airlines, Republic Airlines and Frontier Airlines was approved for the Airline Fuel System at the Salt Lake International Airport. This allows the Airport Authority to recoup investment costs associated with the fuel system currently under construction which is part of the 1983 expansion project. C 83-515
REPUBLIC AIRLINES, INC., SPECIAL SERVICE AGREEMENT FOR AIRLINE FUEL SYSTEM
Amendment No. 4: to the Special Service Agreement Airline Fuel System at the Salt Lake International Airport to provide for the extension of the hydrant fuel system at gates 2, 4, 6 and 8 on Concourse D.
C 83-516
On December 6, 1983, Amendment 3 to the Special Service Agreement with Delta Airlines, Western Airlines, Republic Airlines and Frontier Airlines was approved for the Airline Fuel System at the Salt Lake International Airport. This allows the Airport Authority to recoup investment costs associated with the fuel system currently under construction which is part of the 1983 expansion project. C 83-516
LARRY BRADSHAW; LETTER OF AGREEMENT; LOG; LITTLE COTTONWOOD TANNER DITCH COMPANY STOCK; WATER SHARES; SHARE
A letter of agreement was approved to purchase forty-five shares of Little Cottonwood Tanner Ditch Company stock from Mr. Larry Bradshaw. G 83-13
WALDEMAR CHRISTIANSEN; CHRISTIANSEN BROTHERS; LETTER OF RECOMMENDATION; PURCHAE NINE SHARES OF BROWN AND SANFORD IRRIGATION COMPANY STOCK
Letter of Recommendation was approved for the City to purchase nine shares of Brown and Sanford Irrigation Company stock from Waldemar Christiansen of Christiansen Brothers, Inc. G 83-26
BUDGE AND BRICKEY ASSOCIATES; INSTALL PIPE; INSTALLATION; JORDAN AND SALT LAKE CANAL; 2050 EAST; 4800 SOUTH; PARKING; REZONE PROPERTY
An application was approved for Budge and Brickey Associates to have pipe installed in the Jordan and Salt Lake Canal at 2050 East 4800 South and then use the property surface for parking purposes making it necessary to have the property rezoned. G 83-27
SALT LAKE INTERNATIONAL CENTER; ORDER; PLAT 16; AVIGATION EASEMENT; WAIVE REQUIREMENT
Salt Lake International Center: Order waiving requirement for written avigation easement for Plat 16. G 83-32
LEO MOSHER; BROWN AND SANFORD IRRIGATION COMPANY STOCK; PURCHASE WATER SHARES
City to purchase two shares of Brown & Sanford Irrigation Company stock from Mr. Leo Mosher. G 83-34