Ben Hagar, Ben Hager
Restoring portions of stone block pavement on State Street, West Temple Street, East Temple Street, 1st South Street, and 2nd South Street. C 96-1
L. G. Wilkinson
Constructing a pipe sewer along the north side of 5th South Street between 2nd East and 10th East Street. C 96-2
Abraham Hunter
Plowing from 80 to 100 acres of land on what is known as the Sewer Farm near the mouth of Gravity Outlet Sewer in Section 10 and Section 11, T1N, R1W. C 96-3
J. H. Griffin
To provide sprinkling of certain City streets from June 1, 1896 to December 31, 1898. C 96-4
J. H. Griffin
To provide sprinkling south part of City and Liberty Park during 1896 and 1897. C 96-5
D. S. Griffin
Constructing gutters of concrete and plaster with cast iron covers, for conveying irrigation and storm water across the 1st South, 2nd South, and 3rd South Streets at the intersection of State Street and East Temple Street (removal of catch basins). C 96-6
Big Cottonwood Power Company
For installation and maintenance of street lighting (276 arc lights) in Lamp District No. 1. C 96-7
A. L. Hobson
Provide grading, curbing, and paving of 2nd South Street from West Temple Street to 1st West Street and construction of cross walk and gutter at the 1st West Street intersection. C 96-8
A. L. Hobson
Supplemental agreement to Contract No. 8 to provide grading, curbing, and paving of 2nd South Street from West Temple Street to 1st West Street and construction of cross walk and gutter at the 1st West Street intersection. C 96-9
A. L. Hobson
Construction of pipe sewer on the north side of 2nd South Street between 2nd East Street and 5th East Street. C 96-10
Ben Hagar, Ben Hager
Provide grading and construction of a cement sidewalk on the west side of 2nd East Street between South Temple Street and 1st South Street. C 98-11
Craig and Atkinson, John Craig, Frank Atkinson
Provide erection and completion of a two story brick engine house on 1st South Street. C 98-12
Frank Harrigan, Frank Harigan
Construction of cement sidewalk pavements on the north side of South Temple Street between J and S Streets, on the south side of South Temple Street between 8th East and 12th East Streets on both sides of 1st South and 2nd South Streets between State Street and West Temple Streets. C 98-13
Frank Harrigan, Frank Harigan
Construction of cement sidewalk pavements on East Temple Street, West Temple Street, and 5th East Street. C 98-14
David. R. Parry
For construction of pipe sewer at center of C Street between South Temple Street and 1st Street. C 98-15
S. J. Clawson
Repair electric lamps on the grounds of the City’s portion of City and County Building. C 98-16
Board of Education, John E. Dooly
Refund a portion of the cost to construct 8-inch sewer lateral on E Street to connect the Lowell School to the public sewer ($1,075.80). C 98-17
Mount and Griffin, D. T. Mount, J. H. Griffin
For sprinkling certain City streets during 1892 and 1893 (contract dated May 25, 1892). C 92-18
J. W. Sullivan
For construction of pipe sewer on 1st South Street between 8th East and 11th East Streets. C 95-19
Frank Harrigan, Frank Harigan
Construction of approximately 2000 linear feet of fence at different points along the county road, on the line of the Gravity Outlet Sewer, between the Salt Lake Mill and Elevator Company’s mill and Beck’s Hot Springs. C 95-20
Salt Lake and Ogden Gas and Electric Light Company
To erect poles, cross arms, and wires to maintain and operate street lighting in Lamp District No. 1. C 95-21
J. W. Sullivan
For extending the Gravity Outlet Sewer from its present terminus near the intersection of State Street and 5th South Street to provide a flushing tank. C 95-22
J. W. Sullivan
For construction of a pipe sewer along 4th North Street between 1st West and 2nd West Streets and along Peach Street between 1st West and Center Streets. C 95-23
William Holmes
For extending, replacing, and repairing sidewalk pavements in the City. C 95-24
Frank Harrigan, Frank Harigan
For construction of a pipe sewer along the south side of 1st South Street between 5th East and 6th East Streets and for constructing detached sections of pipe sewer to connect the present system with the Gravity Outlet Sewer. C 95-25